Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted
ML20211L198
Person / Time
Site: Monticello 
Issue date: 09/01/1999
From: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20211L202 List:
References
50-263-99-05, NUDOCS 9909080177
Download: ML20211L198 (2)


See also: IR 05000263/1999005

Text

R

t-

.,

.

/pt Meuq

UNITED STATES

g

NUCLEAR RECULATORY COMMISSION

8

L

REGION lit

801 WARRENVILLE ROAD -

i!' Y

LISLE, ILLINolS 60532-4351

k

,* * -

L

l

%

September 1, 1999

l

Mr. M. Wadley

President, Nuclear Generation.

!

Northem States Power Company

i

414 Nicollet Mall-

Minneapolis, MN 55401

SUBJECT:

MONTICELLO INSPECTION REPORT 50-263/99005(DRP)

l

Dear Mr. Wadley:

On August 12,1999, the NRC completed an inspection at the Monticello reactor facility. The

enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection, the conduct of operations at the Monticello

facility was performed in a safety-conscious manner. Evolutions, such as surveillance tests and .

routine plant power changes, were well controlled, deliberate, and performed in accordance

with procedures. However, your staff failed to enter a condition into the corrective action

program after the cooling flow rate to the safety-related 12 core spray pump motor did not meet

the proceduralized acceptance criterion. This was in violation of approved site administrative

procedures. As you are aware, a robust corrective action program is an essential element in

j

the conduct of plant operations.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),

consistent with Appendix C of the Enforcement Policy. The NCV is described in the attached

^ inspection report. if you contest the violation or severity level of the NCV, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to

the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.

20555-0001, with copies to the Regional Administrator, Region Ill, and the Director, Office of

Enforcement, United States Nuclear Reguletory Commission. Washington, D.C. 20555-0001.

l[

l

!

1

.

9909080177 990901

'

'

l

PDR

ADOCK 05000263

i

'

i

G

PDR

<

l

!

!

,

k..

.

-,

.

,

M. Wadley

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response (if you choose to provide one) will be placed in the NRC Public

Document Room.

Sincerely,

/s/ R. D. Lanksbury

Roger D. Lanksbury, Chief

Reactor Projects Branch 5

Docket No. 50-263

License No. DPR-22

Enclosure:

Inspection Report 50-263/99005(DRP)

cc w/ encl:

Site General Manager, Monticello

Plant Manager, Monticello

S. Minn, Commissioner, Minnesota

Department of Public Service

Distribution:

CAC (E-Mail)

RPC (E-Mail)

CFL (Project Mgr.) (E-Mail)

J. Caldwell, Rlli w/enci

B. Clayton, Rill w/ encl

SRI Monticello w/enci

DRP w/enci

DRS w/enct

Rlli PRR w/enct

PUBLIC IE-01 w/ encl

Docket File w/ encl

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

DOCUMENT NAME: G:\\MONT\\ MON 99005 DRP.WPD

To receive a co py of this document, indicate in the box "C" = Copy w/o attach /enci *E" = Copy w/ attach /enci"N" = No copy

OFFICE

Rlil:DRP

lr

Rlll:DRP

l0

l

l

NAME

Kunowskildpm4K

Lanksbury d200

DATE

08/ o//99

@g/ /

/99

"

OFFICIAL RECORD COPY

n - ~