Site: | Monticello, Prairie Island, 05000000 |
Issue date: | 06/10/1987 |
From: | Hehl C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | Larson C NORTHERN STATES POWER CO. |
Shared Package | |
ML20215A334 | List: |
References | |
NUDOCS 8706160618 | |
Download: ML20215A331 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M3801999-10-21021 October 1999
[Table view]Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217M3371999-10-20020 October 1999 Forwards Notice of Docketing of License SNM-2506 Amend Application.Notice Has Been Forwarded to Ofc of Fr for Publication ML20217M1111999-10-19019 October 1999 Forwards Insp Repts 50-282/99-14 & 50-306/99-14 on 990920- 22.One Violation Noted & Being Treated as Ncv.Insp Focused on Testing & Maint of Heat Exchangers in High Risk Sys ML20217F4331999-10-15015 October 1999 Forwards Rev 39 to Security Plan.Changes Do Not Decrease Effectiveness of Security Plan.Rev Withheld,Per 10CFR73.21 ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20217C2351999-10-0606 October 1999 Forwards Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Insp Consisted of Selected Exam of Procedures & Representative Records,Observation of Activities & Interviews with Personnel ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML20212J8811999-09-28028 September 1999 Forwards Preliminary Accident Sequence Precurson Analysis of Operational Event That Occurred at Plant,Unit 1 on 990105, for Review & Comment.Comment Requested within 30 Days of Receipt of Ltr ML20216J8091999-09-24024 September 1999 Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued ML20216G4341999-09-24024 September 1999 Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F0901999-09-21021 September 1999 Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability ML20212F5121999-09-20020 September 1999 Forwards Response to NRC , Preparation & Scheduling of Operator Licensing Examinations ML20212D8401999-09-16016 September 1999 Discusses 990902 Telcon Between D Wesphal & R Bailey Re Administeration of Retake Exam at Prairie Island During Wk of 991206.NRC May Make Exam Validation Visit to Facility During Wk of 991116 ML20217H2331999-09-10010 September 1999 Forwards Security Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12.Two Findings,Each of Low Risk Significance Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20212A9241999-09-0909 September 1999 Discusses Plans Made During 990902 Telephone Conversation to Inspect Licensed Operator Requalification Program at Prairie Island During Weeks of 991101 & 991108.Requests That Written Exams & Operating Tests Be Submitted by 991022 ML20212B0511999-09-0909 September 1999 Forwards Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.One Issue of Low Safety Significance Was Identified & Being Treated as Ncb ML20217A5751999-09-0909 September 1999 Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls ML20212A9761999-09-0909 September 1999 Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications ML20211Q7641999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant Operator License Applicants During Wk of 000515,in Response to D Westphal ML20211N8631999-09-0707 September 1999 Withdraws 970814 Request for Exemption from 10CFR50,App R, Section III.G.2, Fire Protection of Safe Shutdown Capabilities ML20211Q6981999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 ML20211L1981999-09-0101 September 1999 Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted ML20211K7971999-09-0101 September 1999 Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed ML20211K5911999-09-0101 September 1999 Informs That Util Reviewed Rvid Data Base,As Requested in NRC .Summary of Proposed Changes & Observed Differences Are Included in Encl Tables ML20211L0211999-09-0101 September 1999 Provides Notification That License Amends 141 & 132 & Associated License Conditions 6 & 7 Have Been Fully Implemented ML20211K5931999-08-31031 August 1999 Forwards License Amend Request for License SNM-2506, Proposing Change to License Conditions 6,7 & 8 & TSs App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20211Q6041999-08-31031 August 1999 Forwards Rev 19 to USAR for Pingp,Per 10CFR50.71(e).Rev Brings USAR up-to-date as of 990228,though Some Info Is More Recent.Attachment 1 Contains Descriptions & Summaries of SE for Changes,Tests & Experiments,Per 10CFR50.59 ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211F9961999-08-26026 August 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant ML20211D3541999-08-24024 August 1999 Discusses GL 95-07 Re Pressure Locking & Thermal Binding of safety-related Power Operated Gate Valves.Forwards SE Re Response to GL 95-07 ML20211C9501999-08-23023 August 1999 Forwards Rev 17 to Monticello Nuclear Generating Plant USAR, Updating Info in USAR to Reflect Implementation of Increase in Licensed Core Thermal Power from 1,670 Mwt to 1,775 Mwt.Rept of Changes,Tests & Experiments Not Included ML20211B5711999-08-19019 August 1999 Forwards Second 90-day Rept for Implementation of Voltage Based Repair Criteria at Prairie Island Unit 1.Rept Fulfills Requirements of Section 6.b of Attachment 1 to GL 95-05 ML20211B8311999-08-19019 August 1999 Forwards Request for Relief 8 Re Limited Exams Associated with Unit 1 Third ten-year Interval Inservice Insp Program. Licensee Requests Relief Due to Impractibility of Obtaining 100% Exam Coverage for Affected Items ML20211C2311999-08-19019 August 1999 Forwards Unit 1 ISI Summary Rept,Interval 3,Period 2 Refueling Outage Dates 990425-0526,Cycle 19 971212-990526. Rept Identifies Components Examined,Exam Methods Used,Exam Number & Summarizes Results ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20211B0561999-08-18018 August 1999 Provides Addl Info on Proposed Rev to Main Steam Line Break Methodology ,in Response to NRC Staff Request Made in 990416 Telcon.Nuclear Svcs Corp Rept PIO-01-06, Analysis Rept Structural Analyses of Main Steam Check... Encl ML20211B2621999-08-17017 August 1999 Forwards Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22.No Violations Noted.Insp Included Review & Evaluation of Current Emergency Preparedness Performance Indicators ML20211C7371999-08-17017 August 1999 Discusses Closure of Staff Review Re Generic Implication of Part Length Control Rod Drive Mechanism Housing Leak on 980123.Enclosed NRC 980811 & 1223 Ltrs Responded to WOG Positions Re Corrective Actions ML20210T5661999-08-12012 August 1999 Forwards RAI Re & Suppl ,which Requested Exemptions from TSs of Section III.G.2 of 10CFR50 App R,To Extent That Specifies Separation of Certain Redundant Safe Shutdown Circuits with fire-related Barriers ML20210R7021999-08-12012 August 1999 Forwards Insp Repts 50-282/99-06 & 50-306/99-06 on 990601- 0720.One NCV Occurred,Consistent with App C of Enforcement Policy ML20210U1831999-08-12012 August 1999 Revises 980202 Commitment Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions ML20210T9601999-08-12012 August 1999 Provides Rept on Status of Util RPV Feedwater Nozzle Insps Performed in Response to USI A-10 Re BWR Nozzle Cracking ML20210P5191999-08-11011 August 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & NSP Responses for PINGP & 951117. Staff Reviewed Info in Rvid & Released Info as Rvid Version 2.Requests Submittal of Comments Re Revised Rvid by 990901 ML20210Q0341999-08-0404 August 1999 Forwards SE Granting Licensee 980724 Relief Request 10 Re Third 10-year Interval ISI Program Plan,Entitled, Limited Exam 1999-09-09 Category:NRC TO UTILITY MONTHYEARML20217A0031990-11-15015 November 1990
[Table view]Confirms Discision by Bl Burgess & E Watzl to Have Meeting on 901206 in Region III Ofc to Discuss Configuration Mgt, Attention to Detail,Recent Organization Changes & Interpretation of TSs ML20217A1741990-11-0909 November 1990 Advises That Requalification Program & Licensed Personnel Evaluation Scheduled for Wk of 910318 ML20058E7851990-11-0202 November 1990 Forwards Safety Insp Rept 50-306/90-15 on 900904-05,17-19 & 1029.No Violations Noted ML20058F4981990-11-0101 November 1990 Forwards Safety Insp Repts 50-282/90-14 & 50-306/90-14 on 900814-0924.No Violations Noted ML20058D0721990-10-26026 October 1990 Forwards Insp Repts 50-282/90-15 & 50-306/90-16 on 900917-1005.No Violations Noted.Concerns Raised Re Small Break LOCA Analysis.Reanalysis of Results Requested ML20058D1001990-10-23023 October 1990 Advises That Responses to NRC Bulletin 89-002 Re Stress Corrosion Cracking in Stainless Steel Bolting Acceptable ML20058G2371990-10-16016 October 1990 Forwards Results & Conclusions of Regulatory Effectiveness Review Re Safeguards Measures Conducted on 900910-14.Encl Withheld (Ref 10CFR73.21).Elements of Security Program Sound & Well Managed ML20059N7181990-10-0505 October 1990 Advises That Util 900925 Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2 Part 2 'Vendor Interface for Safety-Related Components' Acceptable ML20059H1461990-09-10010 September 1990 Requests Procedures & Policies Re Fitness for Duty Program for Insp Scheduled for 901016-19 ML20059E9311990-08-30030 August 1990 Identifies No short-term Safety Concerns Re Util 890525 Response to Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Evaluation of Westinghouse Owners Group Bounding Analysis Encl ML20059D8141990-08-27027 August 1990 Forwards Safety Insp Repts 50-282/90-12 & 50-306/90-12 on 900703-0813 & Notice of Violation ML20059C2561990-08-21021 August 1990 Confirms Plans for 900911 Meeting to Present Initial SALP 9 Rept for Facility.Region III Encourages Appropriate Corporate & Plant Mgt Representation at Meeting to Ensure Mutual Understanding of Issues & Findings Presented by NRC ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20055H9971990-07-26026 July 1990 Ack Receipt of 900430 & 0713 Ltrs Re Allegation on Breaker Failure on Cooling Tower Sys.Investigation Found Sufficient Indicating That Load Ctr 106 Located Outside Security Fence Was nonsafety-related ML20055J0451990-07-24024 July 1990 Forwards Safety Insp Repts 50-282/90-13 & 50-306/90-13 on 900709,11 & 12.No Violations Noted ML20055G6671990-07-20020 July 1990 Confirms 900809 Mgt Meeting in Glen Ellyn,Il to Discuss Corporate Reorganization & Other Matters of General Interest ML20055G4291990-07-18018 July 1990 Forwards Safeguards Insp Rept 50-263/90-13 on 900604-0711.No Violations Noted ML20055D9961990-06-29029 June 1990 Advises That 900605 Rev 30 to Security Plan Consistent W/ Provisions of 10CFR50.54(p) & Acceptable W/Exception of Items Noted in Encl.Correction to Plan Addressing Issues Requested.Encl Withheld (Ref 10CFR73.21) ML20055C7331990-06-18018 June 1990 Requests Submittal of Encl Ref Matls within 60 Days Prior to 901029 Scheduled Requalification Program Evaluation ML20059M9431990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20248J2821989-09-20020 September 1989 Ack Receipt of Re Rev to Emergency Plan.Plan Consistent w/10CFR50.54(q) & Acceptable ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20247H6411989-09-12012 September 1989 Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) ML20247K2231989-09-11011 September 1989 Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe ML20247E3371989-09-0707 September 1989 Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM ML20246N5781989-08-31031 August 1989 Forwards Safety Insp Repts 50-282/89-22 & 50-306/89-22 on 890814-18.No Violations Noted ML20246Q0121989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246N5081989-08-30030 August 1989 Advises That 890614 Response to NRC Bulletin 89-001 Re Westinghouse Steam Generator Mechanical Plugs Fulfills Requirements in Responding to Bulletin ML20247A6981989-08-28028 August 1989 Forwards Safety Insp Repts 50-282/89-20 & 50-306/89-20 on 890702-0812.No Violations Noted ML20246F4151989-08-23023 August 1989 Forwards App to SALP 8 Board Repts 50-282/89-01 & 50-306/89-01 & Errata Sheet W/Corrected Pages for Period Dec 1987 - Apr 1989 ML20246C3941989-08-15015 August 1989 Forwards Safeguards Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14.No Violations Noted ML20246C8211989-08-11011 August 1989 Confirms 890808 Telcon Re Util Participation in NRC Regulatory Impact Survey on 891023 in Berlin,Ct.Schedule & General Discussion Groups Shown in Encl ML20245F3101989-08-0404 August 1989 Advises That Util 890724 Response to Generic Ltr 89-08 Re Pipe Wall Thinning Induced by Erosion/Corrosion Acceptable. Records of Program & Results from Implementation of Required Monitoring Program Should Be Maintained for Potential Audit ML20248D6921989-08-0404 August 1989 Advises That Rev 6b to Generating Stations Emergency Plan Transmitted by Util 890710 Form Acceptable & Does Not Decrease Effectiveness of Plan ML20248C0561989-08-0303 August 1989 Forwards Sser Accepting 880601,0909 & 890602 Changes to ATWS Mitigation Sys Actuation Circuitry for Plants.Nrc Requested to Be Notified Upon Completion of Human Factors Review ML20245H5331989-08-0202 August 1989 Advises That 890519 Changes to QA Program Described in CPC-2A Acceptable.Issues Addressed Listed IR 05000282/19890211989-07-26026 July 1989 Forwards Enforcement Conference Repts 50-282/89-21 & 50-306/89-21 on 890713 Re Apparent Violations Noted in Insp Repts 50-282/88-200 & 50-306/88-200 ML20247H6891989-07-25025 July 1989 Requests Proposed Design Change to Containment Hydrogen Monitoring Sys,W/Schedule for Implementing Change or Justification for Existing Configuration ML20247B1041989-07-17017 July 1989 Forwards Exam Repts 50-282/OL-89-01 & 50-306/OL-89-01 on 890613-15 ML20246N4351989-07-13013 July 1989 Forwards Safety Insp Repts 50-282/89-18 & 50-306/89-18 on 890528-0701 & Notice of Violation ML20246E3871989-07-0606 July 1989 Forwards Enforcement Conference Insp Repts 50-282/89-19 & 50-306/89-19 on 890608.Violations Discussed ML20246A2951989-06-29029 June 1989 Forwards Request for Addl Info Re NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs ML20245L2071989-06-29029 June 1989 Forwards SALP 8 Board Repts 50-282/89-01 & 50-306/89-01 for Dec 1987 - Apr 1989.Improvements Needed in Areas of Security,Surveillance & Engineering/Technical Support ML20245K9231989-06-27027 June 1989 Confirms Arrangements for 890727 Meeting at Plant Site to Discuss SALP 8 Rept ML20246L2211989-06-26026 June 1989 Forwards Amends 118,33,142 & 36 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Revise Tech Specs by Removing Tech Spec Figures 6.2-1 & 6.2-2 Re Organizations Functional Requirements ML20245J3301989-06-22022 June 1989 Provides Background Info on Regulatory Analysis Supplementing NRC Proposed Backfit,Per 890413 Request.Util Expected to Provide Schedule for Implementation of Required Improvements ML20245G8321989-06-21021 June 1989 Forwards Safety Insp Repts 50-282/89-04 & 50-306/89-04 on 890606.No Violations Noted ML20245F1181989-06-20020 June 1989 Forwards Insp Repts 50-282/89-17 & 50-306/89-17 on 890416- 0526 & Notice of Violation 1990-09-10 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217M3801999-10-21021 October 1999
[Table view]Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217M3371999-10-20020 October 1999 Forwards Notice of Docketing of License SNM-2506 Amend Application.Notice Has Been Forwarded to Ofc of Fr for Publication ML20217M1111999-10-19019 October 1999 Forwards Insp Repts 50-282/99-14 & 50-306/99-14 on 990920- 22.One Violation Noted & Being Treated as Ncv.Insp Focused on Testing & Maint of Heat Exchangers in High Risk Sys ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20217C2351999-10-0606 October 1999 Forwards Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Insp Consisted of Selected Exam of Procedures & Representative Records,Observation of Activities & Interviews with Personnel ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20212J8811999-09-28028 September 1999 Forwards Preliminary Accident Sequence Precurson Analysis of Operational Event That Occurred at Plant,Unit 1 on 990105, for Review & Comment.Comment Requested within 30 Days of Receipt of Ltr IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML20216G4341999-09-24024 September 1999 Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F0901999-09-21021 September 1999 Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability ML20212D8401999-09-16016 September 1999 Discusses 990902 Telcon Between D Wesphal & R Bailey Re Administeration of Retake Exam at Prairie Island During Wk of 991206.NRC May Make Exam Validation Visit to Facility During Wk of 991116 ML20217H2331999-09-10010 September 1999 Forwards Security Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12.Two Findings,Each of Low Risk Significance Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212B0511999-09-0909 September 1999 Forwards Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.One Issue of Low Safety Significance Was Identified & Being Treated as Ncb ML20212A9241999-09-0909 September 1999 Discusses Plans Made During 990902 Telephone Conversation to Inspect Licensed Operator Requalification Program at Prairie Island During Weeks of 991101 & 991108.Requests That Written Exams & Operating Tests Be Submitted by 991022 ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20217A5751999-09-0909 September 1999 Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls ML20211Q7641999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant Operator License Applicants During Wk of 000515,in Response to D Westphal ML20211Q6981999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 ML20211L1981999-09-0101 September 1999 Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted ML20211D3541999-08-24024 August 1999 Discusses GL 95-07 Re Pressure Locking & Thermal Binding of safety-related Power Operated Gate Valves.Forwards SE Re Response to GL 95-07 ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20211C7371999-08-17017 August 1999 Discusses Closure of Staff Review Re Generic Implication of Part Length Control Rod Drive Mechanism Housing Leak on 980123.Enclosed NRC 980811 & 1223 Ltrs Responded to WOG Positions Re Corrective Actions ML20211B2621999-08-17017 August 1999 Forwards Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22.No Violations Noted.Insp Included Review & Evaluation of Current Emergency Preparedness Performance Indicators ML20210R7021999-08-12012 August 1999 Forwards Insp Repts 50-282/99-06 & 50-306/99-06 on 990601- 0720.One NCV Occurred,Consistent with App C of Enforcement Policy ML20210T5661999-08-12012 August 1999 Forwards RAI Re & Suppl ,which Requested Exemptions from TSs of Section III.G.2 of 10CFR50 App R,To Extent That Specifies Separation of Certain Redundant Safe Shutdown Circuits with fire-related Barriers ML20210P5191999-08-11011 August 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & NSP Responses for PINGP & 951117. Staff Reviewed Info in Rvid & Released Info as Rvid Version 2.Requests Submittal of Comments Re Revised Rvid by 990901 ML20210Q0341999-08-0404 August 1999 Forwards SE Granting Licensee 980724 Relief Request 10 Re Third 10-year Interval ISI Program Plan,Entitled, Limited Exam ML20210H0861999-07-28028 July 1999 Forwards Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted.Licensee Conduct at Monticello Facility Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML20209J0941999-07-15015 July 1999 Forwards SER Finding Rev 7 to Topical Rept NSPNAD-8102, Reload Safety Evaluation Methods for Application to PI Units, Acceptable for Ref in Plant Licensing Actions ML20209G5621999-07-14014 July 1999 Forwards Insp Rept 50-263/99-11 on 990621-24.No Violations Noted.Objective of Insp,To Determine Whether Monticello Nuclear Generating Station Emergency Plan Adequate & If Station Personnel Properly Implemented Emergency Plan ML20196J5351999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950515 & NSP Responses & 980917 for Monticello Npp.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 ML20209H8361999-07-0202 July 1999 Forwards Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) for Tests Administered During Week of 990517-21.Two Applicants Passed All Sections of Exam & Issued Reactor Operator Licenses to Operate Pings ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20209F0391999-06-30030 June 1999 Forwards Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531.Violation Noted.Notice of Violation or Civil Penalty Will Not Be Issued,Based on NRC Listed Decision to Exercise Discretion ML20196D5501999-06-18018 June 1999 Forwards Individual Exam Results for Licensee Applicants Who Took May 1999 Initial License Exam.In Accordance with 10CFR2.790,info Considered, Proprietary. Without Encls ML20196A6741999-06-17017 June 1999 Refers to 990517-20 Meeting with Util in Welch,Minnesota Re Licensee Initiatives in Risk Area & to Establish Dialog Between SRAs & Licensee PRA Staff ML20207D0641999-05-26026 May 1999 Informs of Plans to Conduct Meeting on 990614 in Red Wing,Mn,To Present Planned Changes to NRC Regulatory Processes & Pilot Plant Program for Prairie Island Nuclear Generating Station ML20207B5841999-05-26026 May 1999 Forwards SER Concluding That Licensee 990412 Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Reactor Vessel Head Penetrations for part-length CRDMs Will Provide Acceptable Quality & Safety ML20207B7941999-05-25025 May 1999 Forwards Insp Repts 50-282/99-05 & 50-306/99-05 on 990426- 30.No Violations Noted.Overall Plant Radiological Controls Effective in Maintaining Reasonable Collective Dose for Work Being Conducted During Unit 1 Refueling Outage ML20207B3281999-05-24024 May 1999 Informs That in May 1999,Region III Received Rev 20 to Portions of Prairie Island Nuclear Generating Center Emergency Plan.Rev Submitted Under Provisions of 10CFR50.54(q) ML20207A1491999-05-20020 May 1999 Forwards Request for Addl Info Re Areas of Seismic,Fire,High Winds,Floods & Other External Events for IPEEE Submittals for PINGP Dtd Dec 1996,March 1998 & Dec 1998 ML20206N5601999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Monticello Npp.Organization Chart Encl ML20206N4581999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created. Reorganization Chart Encl ML20206S0891999-05-13013 May 1999 Informs That on 990505 NRC Staff Held Planning Meeting for Plant to Identify Insp Activities at Facility Over Next 6 to 12 Months ML20206G2181999-05-0505 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Dtd 960110,for Plant ML20206G4901999-05-0404 May 1999 Forwards Staff Review of Licensee 960508 Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Sf,Over Fuel in Rc or Over Safety-Related Equipment, .Overall, Responses Acceptable.Tac M95610 Closed ML20206J2101999-05-0404 May 1999 Forwards Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.During Insp Period,Sf Casks 08 & 09 Successfully Loaded & Cask 08 Transported & Placed in ISFSI 1999-09-09 |
See also: IR 05000263/1987008
Text
. -
.
.
JUN 101987
Docket No. 50-263
Docket No. 50-282
Docket No. 50-306
Northern States Power Company
ATTN: Mr. C. E. Larson
Vice President, Nuclear
Generation
International Centre Building
920 Second Avenue South
Minneapolis, MN 55401
Gentlemen: -
This refers to the management meeting held on May 26, 1987, at the NRC offices
in Glen Ellyn, Illinois, between you and members of your staff and Mr. A. Bert
Davis and members of this office regarding Northern States Power Company
concerns related to the-NRC Operator licensing process. Operator licensing
activities by this office discussed during this meeting were documented in
Examination Report No. 50-263/0L-87-01; No. 50-282/0L-87-01; No. 50-306/0L-87-01.
The enclosed copy of our report of this meeting identifies those matters
discussed. .
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this meeting.
Original Signe'd By C. W. Hehl
,
'
Charles W. Hehl, Chief
Operations Branch
l Division of Reactor Safety
Enclosure: Reports .
No. 50-263/0L-87-01;
No. 50-282/0L-87-01;
No. 50-306/0L-87-01
See Attached Distribution
8706160618 870610
PDR ADOCK 05000263
G PDR
R RII R
Burdi /abl Gu dp ond He 1
V' hW\ Gl N
3
1\ /
c X
be
, . _ . . . ._ __ . _ .-
.
.
-
.
Northern States Power Company 2
JUN 101987
,
Distribution
cc w/ enclosure:
E. L. Watzl, Plant Manager
- W. A. Shamla, Plant Manager
DCS/RSB (RIDS)
-
Licensing Fee Management Branch
. Resident Inspector, RIII Prairie
Island
Resident Inspector, RIII Monticello ,
John W.-Ferman, Ph.D.,
Nuclear Engineer, MPCA
State Liaison Officer, State
of Minnesota
.
J s
- I
t
.
>
.
>
1
.__ ,____ _,. . . - _ . _ - . _ . . , . _ _ , . . _ _ . _ . . . . _ . - . . - . _ _ _ , _ _ . . _ _ . - ~ . , _ . _ _ _ _ _ _ _ _ _ . _ . . _ . . _ _ _ _ - , _ , . . _ .