ML20216G434

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam
ML20216G434
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/24/1999
From: Dave Hills
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20216G428 List:
References
50-263-99-301, NUDOCS 9910010054
Download: ML20216G434 (2)


See also: IR 05000263/1999301

Text

September 24,1999

Mr. M. Wadley

President, Nuclear Generation

Northern States Power Compsny

414 Nicollet Mall

>

Minneapolis, MN 55401

SUBJECT:

OPERATOR LICENSING EXAMINATION REPORT 50-263/99301(OL)

Dear Mr. Wadley;

i

On August 25,1999, Nuclear Regulatory Commission (NRC) examiners completed initial

operator licensing examinations at your Monticello Nuclear Generating Station. The

performance evaluation for each license applicant was finalized on September 10,1999.

During the examination validation and administration, the NRC examiners observed control

room operations and reviewed several administrative and operating procedures. The enclosed

report presents the results of the examination and concurrent operations inspection.

The NRC approved examinations were administered to two reactor operator license applicants.

Both applicants passed all sections of their respective examinations and were issued reactor

operator licenses for your Monticello Nuclear Generating Station.

.

This examination was your training organization's second opportunity to prepare an operator

'

licensing examination in accordance with NUREG-1021," Operator Licensing Examination

Standards for Power Reactors," Interim Revision 8. A high percentage (22%) of the written

examination questions submitted by your staff did not meet the guidance contained in NUREG-

1021. All of the unsatisfactory questions were significantly modified or replaced with acceptable

questions prior to the test administration. The NRC examination team identified the area of

written question development as needing improvement for future NRC examinations developed

by your staff.

l

Based on the results of this examination and inspection, the NRC determined that a violation of

'

NRC requirements contained in 10 CFR 55.49, " Integrity of Examinations and Tests," occurred

on July 19,1999. This violation is being treated as a Non-Cited Violation (NCV) consistent v @.

Appendix C of the Enforcement Policy. The NCV is described in the subject inspection report.

If you contest the violation or severity levet of the NCV, you should provide a response within 30

days of the date of this inspection report, with the basis for you denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with a

copy to the Regional Administrator, Region Ill, and the Director, Office of Enforcement, United

States Nuclear Regulatory Commission, Washington, DC 20555-0001.

9910010054 990927

PDR

ADOCK 05000263

V

PDR

-

I

L

M. Wadley

-2-

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, its

enclosures, and your response to this letter, if you choose to respond, will be placed in the NRC

Public Document Room.

Sincerely,

Original Signed by Steven A. Reynolds (for)

David E. Hills, Chief

Operations Branch

Docket No. 50-263

License No. DPR-22

Enclosures:

1. Inspection Report 50-263/99301(OL)

2. Simulator Fidelity Report

3. Written Examination & Answer Key (RO)

cc w/encls 1& 2:

Site General Manager, Monticello

Plant Manager, Monticello

S. Minn, Commissioner, Minnesota

Department of Public Service

cc w/encis 1,2, & 3: Timothy A. Witschen, Superintendent, Operations Training

Db.abutio_3:

CAC (E-Mail)

RPC (E-Mail)

CFL (Project Mgr. )(E-Mail)

J. Caldwell, Rill w/encls 1 & 2

B. Clayton, Rlll w/encls 1 & 2

SRI Monticello w/encis 1 & 2

DRP w/encls 1 & 2

DRS w/encls 1 & 2

Rlli PRR w/encls 1 & 2

PUBLIC IE-42 w/encls 1,2 & 3

Docket File w/encls 1 & 2

j

j

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

M. Bies, Rlli w/encls 1 & 2

l

DOCUMENT NAME: G:DRS\\ MON 99301.WPD

To receM a copy of itne document, Indicate in the box: *C" * Copy ethout 6ttachm nvendosure T * Copy with attacmmntrendosure

  • N* = No copy

'

OFFICE

Rill

/ld

Rlli

V Rlli

lC

m

NAME

RBailey:jp W

RLanksburMID(.

DHills A

f, <

'

DATE

09/#199

09/2y99

09/11/99

OFFICIAL RECORD COPY

-%.%-

>