Requests That Encl List of Ref Matl Be Furnished at Least 60 Days Prior to Operator & Senior Operator Licensing Exams Scheduled for Wk of 880606.Requirements for Administration & Review of Written Exams & Rules & Guidelines Also Encl
ML20149J354
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/18/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
References
NUDOCS 8802230005
Download: ML20149J354 (11)


Text

_-_ __ ____ ______ __ __ _ _ ____ .

L

(

I FEB t a BSa Docket No. 50-263 Northern States Power Company ATTN: Mr. C. E. Larson Vice President, Nuclear 4

Generation 6

414 Nicollet Mall -

Minneapolis, MN 55401 .

Dear Mr. Larson:

SUBJECT:

OPERATOR AND SENIOR OPERATOR LICENSING EXAMIRATIONS

\

$2n a telephone conversation between Mr. J. Shriver, and Mr. D. E. Hills, o arrangements were made for the administration of examinations at the Monticello Nuclear Generasing Station.

The written and oral examinations are scheduled for the week of June 6,1988.

In order for us to meet this schedule, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1 "Reference s Material-Requirements for Reactor / Senior Reactor Operator Licensing Examinations" at least 60 days prior to the examination date. Any delay in receiving properly bound and indexed reference material will result in a delay in administering the examinations. Our examinations are scheduled far in advance with considerable planning to best utilize our limited examiner manpower and to meet the examina-tion dates requested by the various facilities. Therefore, missing tne deadline, even by a few days, will liksly result in a long delay since it may not be possible to reschedule examinations at other facilities. Mr. R. C. McGillic has been advised of our reference material requirements, the number of reference material sets that are required, and the examiners' names and addresses where each set is to be mailed.

The facility management is responsible for providing adequate space and accommodations in order to properly conduct the written examinations.

Enclosure 2 "Administration of Reactor / Senior Reactor Operator Licensing Written Examinations," describes our requirements for concucting these esaminations. Mr. R. C. McGillic has also been infonned of these requirements.

In addition, to better document simulator examinations, the chief examiner will have the facility simulator operator record prespecified plant conditions (i.e., plant pressure, temperature, pressurizer level, etc.), for each simulator scenario. The candidate will be responsible for providing this information, along with any appeal of his simulator operating examination. Therefore, the facility training staff should retain the s'mulator examination scenario infor-mation until all candidates taking the examination have either passed the operating examination or all appeals filed by the candidates who failed the epitrating examination have been completed.

Dk geeo e \k 4 - q?T ge

k s .

Northern States Power Company 2 FEB 181988 P

Enclosure 3 contains the Rules and Guidance that will be in effect during-the administration of the written examination. The facility management is responsible for ensuring that all-candidates are aware of these Rules.

All reactor operator and senior reactor operator licensei pplications should normally be submitted at least 60 days prior to the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate eligibility has been determined. If the applications are not, received at least 30 days prior to the examination dates, it is likely that a postponement will be necessary.

This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.- Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C.

20503.

The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4, "Requirements for Facility Review of Written Examination." Mr. R. C. McGillic'hfs been informed of these requiremer.ts.

Thank you for your consideration in this matter. If ycu have any questions regarding the examination procedures and requirements, please contact Mr. D. Hills at (312) 790-5600.

Sincerely, Geoffrey C. Wright, Chief Operations Branch 1

l

Enclosures:

l

1. Reference Material Requirements I

for Reactor / Senior Reactor Operator Licensing Examinations

2. Reluirements f ar Administration of Written Examinations i 3. NRC Rules and Guidelines For l

License Examinations

4. Facility Review Requirements l

See Attached Distribution R I R II III J

l et -lis/mb ,' rdick ight l / /88 ,-

i l

Of .

Northern-States, Power' 3 FEB 181988

. -r - ,

- cc w/ enclosures:

4 W. A. Shamla, Plant Manager DCD/DCB(RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Monticello Resident Inspector, RIII Prairie L Island John'W. -Ferman, Ph.D. ,

Nuclear Engineer, MPCA E. Earney, Plant Training Manager cc w/o enclosures:

D. Scaletti, Project Manager, NRR J. N. Hannon, Branch Chief, OLB I. N. Jackiw, Section Chief, DRP t-

i. l hv'

- f' m.

I E

e t

b____..____=__ ._ __ . . _ _ _ _ _ . __ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l ENCLOSURE 1 Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations l

1. Failure to provi- complete, properly bound and indexed plant reference material will ressit in canceling and rescheduling of the examinations. I
2. Training material should include all substantive written material used for preparing candidates for initial R0 and SRO licensing.
3. The written material should include learning objectives and the details presented during lectures, rather than outlines.
4. Training material and procedures should be identified by plant and unit along with appropriate indexes or table of contents.
5. The reference material and procedures should be approved, final issues, and should be so marked.
6. If the facility is in the process of revising some of the material, the material received by the Coninission will be used for the examination.

Any material under revision, upon receipt of this letter, must be finalized when the required material is submitted.

7. The following training r:sterials shall be provided:
a. System descriptions.

System descriptions should include descriptions of all operationally relevant flow paths, components, controls, and instrumentation,

b. Existing system learning objectives and lesson plans.

System training material should draw parallels to the actual procedures used for operating the applicable system,

c. Complete and operationally useful descriptions of all safety-system interactions.
d. Where available, Balance-of-Plant system interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
e. Comprehensive theory material that includes fundamentals in the area of theory of reactor operations, heat transfer and fluid flow, and specific application to actual in-plant components.

Themodynamics learning objectives and lesson plans.

For example, mechanical theory material on pumps should include pump theory as well as descriptions of how these principles actually apply to major plant pumps and systems in which they are installed i.e., Reactor Coolant pumps, all ECCS pumps, Recirculation pumps, Feedwater pumps, and Emergency Feedwater pumps.

Reactor theory learning objectives and lesson plans.

For example, Reactor Theory material should include descriptions that draw explicit ties between the fundamentals and actual operating limits followed in the plant i.e.,

reactor theory material should contain explanations of how principles relate to the actual curves used by operators to verify shutdown margin or calculate an ECP.

f. Training manuals.
g. Plant orientation manual,
h. Training material and learning objectives used to clarify and strengthen understanding of emergency operating procedures,
i. Procedure index (alphabetical by subject).
j. All applicable reactor operating and safety administrative procedures.
k. A table of contents for all facility administrative procedures.
1. All integrated plant operati /rocedures (normal and general operating procedures),
m. Emergency procedures (emergency instructions, abnormal or special procedures).
n. Standing orders (important orders that are safety-related and may supersede the regular procedure),
o. Fuel handling and core loading procedures (initial core loading procedures, when appropriate).
p. Annunciator procedures (alarm procedures, including set points).
q. Radiation protection manual (radiation control manual or procedure),
r. Emergency plan implementing procedures.
s. Technical specifications.
t. System operating procedurcs.
u. Piping diagrams or flow charts.
v. Instrumentation diagrams or flow charts.
w. Electrical diagrams or flow charts.
x. Technical data book and/or plant curve information as used by operators.
y. Facility precautions, limitations and set points.
z. Questions and answers prepared by the facility (voluntary by the facility).

aa. ECCS system Surveillance procedures required by Technical Specifications.

bb. The following information on the plant referenced simulator:

List of all available initialization points.

List of all present malfunctions with a clear identification number. This list should include cause and effect infomation and a list of which annunciators are to be initially expected.

Specifically, for eadh malfunction, a concise description of I the expected result, or range of results, that will occur upon implementation.

A description of simulator failure capabilities for valves, l breakers, indicators and alams.

Where the capability exists, an explanation of the ability to vary the severity of a particular malfunction should be l provided,1. e., ability to vary the size of a LOCA or steam l

leak, or the ability to cause a slow failure of a compenent l

such as a feed water pump, turbine generator or major valve.

! For example , the drifting shut of a main feed water regulating I valve.

I A list of modeling conditions or simulator problems that n.ay impact the examination.

  • Identification of any known performance test failures not yet completed.

Copies of facility generated scenarios that expose the candidates to situations of degraded pressure control (PWR),

degraded heat removal capacity (PWR and BWR), and containment l challenges (BWR).

Simulator instructor's manual. (voluntary by the facility)

  • Description of the scenarios used for the training class.

1 1

j l

a

8. Additional material required by the examiners to develop examinations that meet the requirements of these standards and the regulations.

1 1

l

\

i ENCLOSURE 2 Requirements for Administration of Written Examinations Operator Licensing Branch requirements are:

1. A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.

2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with 3 foot spacing between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
3. Suitable arrangements are to be made by the facility if the candidates are to have lunch, coffee, etc. These arrangements shall comply with Item 1 above. These arrangements will be reviewed by the examiner and/or proctor.
4. The facility staff shall be provided a copy of the written examination and answer key af ter the last candidate has completed and handed in his written examination. The facility staff shall then have five working days to provide formal written comments with supporting documentation on the examination and answer key to the chief examiner or to the regional office section chief.
5. The facility licensee will provide pads of 8-1/2 x 11" lined paper in unopened packages for each candidate's use in completing the examination.

The examiner will distribute these pads to the candidates. All reference material needed to complete the examination will be furnished u'y the examiner. Candidates can bring pens, pencils, calculators or slide rules into the examination room and no other equipment or reference material will be allowed.

6. Only black ink or dark pencils should be used for writing answers to questions.

ENCLOSURE 3 NRC Rules and Guidelines for License Examinations During the administration of this examination the following rules apply:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
3. Use black ink or dark pencil only to facilitate legible reproductions.
4. Print your name in the blank provided on the cover sheet of the examination.
5. Fill in the date on the cover sheet of the examination (if necessary).
6. Use only the paper provided for answers.
7. Print your name in the upper right-hand corner of the first page of each section of the answer sheet.
8. Consecutively number each answer sheet, write "End of Category "-as appropriate, start each category on a new page, write on only one side of the paper, and write "Last Page" on the last answer sheet.
9. Number each answer as to category and number, for example,1.4, 6.3.
10. Skip at least three lines between each answer.
11. Separate answer sheets from pad and place finished answer sheets face down on your desk or table.
12. Use abbreviations only if they are commonly used in facility literature.

l 13. The point value for each question is indicated in parentheses after the question and can be used as a guide for the depth of answer required.

14. Show all calculations, methods, or assumptions used to obtain an answer to mathematical problems whether indicated in the question or not.

l

15. Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION AND 00 NOT LEAVE ANY ANSWERS BLANK.
16. If parts of the examination are not clear as to intent, ask questions of the examiner only.

t l

17. You must sign the statement on the cover sheet that indicates that the a work is your own and you have not received or been given assistance in completing the examination. This must be done after the examination has been completed.
18. When you complete your examination, you shall:
a. Assemble your examination as follows:

(1) Exam questions on top.

(2) Exam aids - figures, tables, etc.

(3) Answer pages including figures which are a part of the answer.

b. Turn in your copy of the examination and all pages used to answer the examination questions.
c. Turn in all scrap paper and the balance of the paper that you did not use for answering the questions.
d. Leave the examination area, as defined by the examiner. If after leaving, you are found in this area while the examination is still in progress, your license may be denied or revoked.

i

.. *l ENCLOSURE 4 REQUIREMENTS FOR FACILITY REVIEW 0F WRITTEN EXAMINATION

1. There shall be no review of the written examination by the facility staff before or during the administration of the examination. Following the administration of the written examination, the facility staff shall be provided a marked-up copy of the examination and the answer key.
2. The facility will have five (5) working days from the day of the written examination is given to provide fomal comment submittal. The submittal will be made to the responsible Regional Office by the highest level of corporate management for plant operations, e.g., Vice President for Nuclear Operations. A copy of the submittal will be forwarded to the chief examiner, as appropriate. Coments not submitted within five (5) working days will be considered for inclusion in the grading process on a case by case basis by the Regional Office section chief. Should the comment submittal deadline not be met, a long delay for finalization of the examination results may occur.
3. The following format should be adhered to for submittal of specific comments:
a. Listing of NRC Question, answer and reference,
b. Facility comment
c. Supporting documentat ,

NOTES: (1) No change to the examination will be made without submittal of complete, current, and approved reference material.

(2) Comments made without a concise facility recomendation will not be addressed.

1 l

C

~' : h

$ f

\

+

~

- i\ .

a y;

} -- .

o

\

\

/

.e%

'f[o<dwk' k:~' f

+ f*

fNe '@d 'efg 5 <

c 4 $s */~ *  ?

s s

d# g/ c <$fQ. , lk$. +/ #: $f f S, 4y;$ c / e f S

n 'e

  • 2

,'*e//f'";e/at k g, o

%q

^

ss k /*'

8+.{ a ]~s g ? r. k f~/ e g 4 k"' 5,[$

gU s

'9

,e//aAm'[, s e

b l4f$ g+

s

,gRJ?/q/yO,ok t

p e e

~ s g

d f

O  ;[h %e<#?'f.6N & ,-

$ $;zl'/> b ls e# " l $*fv

~

7

,f #

  • e$

e[( N ^~~g$ < -

S s

O " ~ s' f 5 5 i

$s 'r f z

  1. f;&tpfp44 . Q$9$

c'

{.

  • hp !/ ',& 8 f l$' k d/$ & Gf c f e (

s 2 / f S" f' ,f b / r ' &$

O s "9-

', ' ;>,/'

/f O+h.s .f"x#e# &

'n ,8 f e d4* f$&e e

g$$.

D

$f#g jpf d

'v, b

l

.f ,

.,f

.y .

y',

<.1

> t- 'N \

t' f1I L\ ks