May 3, 1999
Mr. M. Wadley
'
' President, Nuclear Generation
1 Northern States Power Company
414 Nicollet Mall
Minneapolis, MN 55401
' SUBJECT:
MONTICELLO INSPECTION REPORT 50-263/99002(DRP)
Dear Mr. Wadley:
On April 8,1999, the NRC completed an inspection at the Monticello reactor facility. The
enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Monticello
l
facility was professional and safety conscious. Evolutions such as surveillance testing and
plant power changes were well controlled, deliberate, and performed in accordance with
procedures.
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred. This violation is being treated as Non-Cited Violation (NCV), consistent
with Appendix C of the Enforcement Policy. The NCV is described in the subject inspection
report. If you contest the violation or severity level of the NCV, you should provide a response
within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with
copies to the Regional Administrator, Region lil, and the Director, Office of Enforcement, United
States Nuclear Regulatory Commission, Washington, DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
Document Room.
Sincerely,
/s/ R. D. Lanksbury
Roger D. Lanksbury, Chief
Reactor Projects Branch 5
Docket No. 50-263
License No. DPR-22
Enclosure: Inspection Report 50-263/99002(DRP)
cc w/ encl:
Plant Manager, Monticello
S. Minn, Commissioner, Minnesota
)
Department of Public Service
DOCUMENT NAME: G:\\MONT\\ MON 99002.DRP
To receive a co w of this document, Indicate in the box *C" = Copy w/o attach /end "E" = Cooy w/ attach /enci "N" = No copy
'
OFFICE
Rill:DRP
t-
Rlli:DRP
l0
l
NAME
Kunowski/co AY
LanksburyFa f
DATE
F g /99
6 3 /99
OFFICIAL RECORD COPY
9905100139 990503
F
ADOCK 05000263
C
j
f
)
Vg,ik; *
)
l
.
-
!
M. Wadley
-2-
i
1
i
Distribution:
CAC (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
i
l
J. Caldwell,' Rlll w/enci
B. Clayton, Rill w/ enc!
l
SRI Monticello w/enci
'
DRP w/enci
DRS w/enci
Rill PRR w/enci
l
l
PUBLIC IE-01 w/enci
{
- Docket File w/ encl
l
GREENS
l
IEO (E-Mail)
DOCDESK (E-Mail)
t .-
(
l
l
'
i
l
l
)1
>
P
l
100018
h*
1
,
'