ML20202B719
| ML20202B719 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 01/26/1999 |
| From: | Leach M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wadley M NORTHERN STATES POWER CO. |
| References | |
| NUDOCS 9901290178 | |
| Download: ML20202B719 (2) | |
Text
f e
-i January 26, 1999 Mr. M. Wadley President, Nuclear Generation
. Northem States Power Company 414 Nicollet Mall
- Minneapolis, MN 55401
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Wadley:
, in a telephone conversation on January 25,1999. Timothy Witschen, Operations Training Superintendent, and Dell McNeil, Reactor Engineer, made arrangements for the NRC to inspect the 'icensed operator requalification program at the Monticello Nuclear Generating Station. The inspection is planned for the week of March 8,1999, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved -
requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please fumish the written examinations and operating tests scheduled for the week of the inspection to the NRC by March 1,1999. Mr. Witchen has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, includin'g the time for reviewing instructions, gathering and maintaining the data
' needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Intemet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503.
~ The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it dispisys a currently valid OMB control number.
[:
9901290178 990126 L
PDR ADOCK 05000293 e
PDR I..
..m 4
d i
M. Wadley,
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Hironori Peterson at 630-829-9707, or me at 630-829-9705.
Sincerely, Original signed by Dell R. McNeil (for)
Melvyn N. Leach, Chief Operator Licensing Branch Docket No.: 50-263 License No.: DPR-22 cc:
Plant Manager, Monticello State Liaison Officer, State of Minnesota T. A. Witschen, Training Department Distribution:
Docket File
~ PUBLIC IE-421 DRS~
Rlli PRR R. M. Gallo, NRR/HOLB SRI, Monticello T. J. Kim, LPM, NRR B. Burgess, DRP M. A. Bies, DRS O
DOCUMENT NAME:G:\\DRS\\ MON 012b9.WPD vgp. e.....
- m. ins,c.w in me wr 'c. c#m.m.ch=w. cm,. v. ce e n.ew==.ncw-. v. % em OFFICE Rill 83 Rlli lN l
l 3ME McNeil:jp P Leach b.(fer4of QA,TL',01/lk/99 01//k/99 OFFICIAL RECORD COPY 20003G