ML20137Z045

From kanterella
Revision as of 03:59, 2 September 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-412/85-23 on 851028-1101 & Notice of Violation
ML20137Z045
Person / Time
Site: Beaver Valley
Issue date: 12/06/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20137Z051 List:
References
NUDOCS 8512110210
Download: ML20137Z045 (2)


See also: IR 05000412/1985023

Text

_ _.

.

1

~.

.

4

4

DEC 8 Ess

,

Docket No. 50-412

Duquesne Light Company

I ATTN: Mr. J. J. Carey

Vice President

Nuclear Group

Robinson Plaza Building No. 2

Suite #210, PA Route 60

'

.

Pittsburgh, Pennsylvania 15205

Gentlemen:

,

Subject: Inspection Report Number 50-412/85-23

This refers to the routine safety inspection conducted by M. J. Schaeffer of

this office on October 28 - November 1,1985 at Beaver Valley Power Station,

j Unit 2, Shippingport, Pennsylvania of activities authorized by NRC License Num-

'

ber CPPR-105 and to the discussions of our findings held by Mr. M. J. Schaeffer

i with Mr. D. Denning at the conclusion of the inspection.

,

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

'

inspection consisted of selective examinations of procedures and representative

,

records, interviews with personnel, and observations by the inspector.

,

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A. This violation has been

categorized by severity level in accordance with the revised NRC Enforcement

.

Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR

>

8533) dated March 8, 1984. You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in thic matter is appreciated.

1

Sincerely,

Origia.: .: vs EYs

> JacqueP.Darr

!

Stewart D. Ebneter, Director

gpqg $$p

O

" ' ""^ " S*'" "

!

0FFICIAL RECORD COPY IR BV2 85-23 - 0001.0.0 h

12/02/85 '\\

j

ZE0$

_ - - . -.. __ _ - - .. - . -

. . . ._ _ . _ . . _ ._ _ _ . -__-_ .- . .

-

1

t

-

Duquesne Light. Company 2

<

. . Enclosures:

j 1. Appendix A, Notice of Violation

<

2. NRC Region I Inspection Report Number 50-412/85-23

i cc w/encls:

, E. J. Woolever, Vice President, Nuclear Construction Division

i E. Ewing, Quality Assurance Manager

1

'

R. J. Swiderski, Manager, Startup Group

R. E. Martin, Manager, Engineering

'

E. F. Kurtz, Jr. , Manager, Regulatory Affairs

P. RayStrcar, Stone and Webster Engineering Corporation

Public Document Room (PDR)

Local Public Document Room (LPDR)

1 Nuclear Safety Information Center (NSIC)

7

NRC Resident Inspector

l Commonwealth of Pennsylvania

f

'

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl) DRP Section Chief

T. Rebelowski, SRI, Millstone 3

.

W. Troskoski, SRI, BV-1

i B. Singh, LPM, NRR

i

k

4

i

i

1

I

i

l

1 .

a

c4

1

RI:DRS9mj/- RI:DRf RI:DRS RI:DRS

Cheune([/ Anderson

'

Schaeffer/mjh Durr

12/3 /85 12/jp/85 12/3'785

12/3/85

0FFICIAL RECORD COPY IR BV2 85-23 - 0002.0.0

+

12/02/85

., _ -- __. _ _ . . _ . . _ . . . . _ . . - _ . . _ _ . . _ . . . . , _ _ , _ . . . . . . - . - _ . _ . _ _ _

. . . _ , _ - , . - . . - -