ML20127G537

From kanterella
Revision as of 07:35, 10 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Exam Rept 50-321/OL-85-01 of Exam Administered on 850311-14
ML20127G537
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/08/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20127G540 List:
References
NUDOCS 8505210087
Download: ML20127G537 (2)


Text

. . . . _

April 8,1985 Georgia Power Company ATTN: Mr. R. J. Kelly Executive Vice President i

P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

EDWIN I. HATCH EXAMINATION REPORT 321/0L-85-01 g The NRC administered examinations on March 11-14, 1985, to employees of your company who had applied for licenses to operate the Edwin I. Hatch Nuclear Plant.

Additionally, the NRC administered examinations to employees of your company who currently hold licenses to operate the Edwin I. Hatch Nuclear Plant. At the conclusion of these examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1. =

A table summarizing the examination results for each examined individual is provided as Enclosure 2. Copies of the written examination questions and answer key are included in this report as Enclosures 3 and 4. A Requalification Program l Evaluation Report is included as Enclosure 5. JE 1

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1, 3, and 4 will be placed in NRC's Public Document Room unless you notify this office

  • by telephone within 10 days of the date of this letter and submit written y application to withhold information contained therein within 30 days of the i date of this letter. Such application must be consistent with the requirements n f of 10 CFR 2.790(b)(1). Enclosure 2 is exempt from public disclosure pursuant to y

10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

{

(Original signed by HCDance) h l Virgil L. Brownlee, Chief N l Reactor Projects Branch 2 5

Enclosures:

Division of Reactor Projects

{

1. Examination Report 50-321/0L-85-01 d

l s

2. Table of Examination Results F (Official Use Only-Privacy Act i Information)
3. SRO Exam Questions and Answer _

Key - Replacement Examination

4. R0/SR0 Exam Questions and Answer r_

Key - Requalification Examination r

5. Requalification Program Evaluation  ?

Report ,

cc w/encls: (See page 2)

~

8505210087 850408 PDR ADOCK 05000321  ?

G PDR i~

\ M y

9 l- Georgia Power Company 2 April 8,198s -

I.

L cc w/encls 1, 2, and 5:

J. T. Beckham, Vice President and General Manager-Nuclear Operation J. J. Badgett, Corporate Training Manager H. C. Nix,. Site General Manager

.P. E. Fornel, Site-QA Supervisor cc w/encls. 1, 2, 3, and 4:

C. T. Moore, Training Manager, Hatch bec w/ encl 1, 2, 3, & 4:

Senior Resident Inspector

.bcc w/ encl 1:

Project Manager, NRR State of Georgia bec w/encls 1, 3, & 4:

Operator Licensing Branch, NHFS, NRR Document Control Desk l

1

-RII RII RII RII RI ekman:dr son AGibson RBemis 1 era giues giu8s ysi8s ysies r Vfries

_