Forwards 37 Offnormal Event Procedures in Response to ACRS Subcommittee Request at 810917-18 Meeting
ML20054J948
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 06/25/1982
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20054J949 List:
References
AECM-82-280, NUDOCS 8206300231
Download: ML20054J948 (3)


Text

_

MISSISSIPPI POWER & LIGHT COMPANY

]

Helping Build Mississippi P. O. B O X 16 4 0. J A C K S O N. MISSISSIPPI 39205 NUCLEAH PHODUCTION DEPARTMENT U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 At t en t. ion : tir . Harold R. Denton, Director

Dear tir. Denton:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0260/L-360.0 Off-Normal Evrnt Procedures -

ACRS Request AECtt-82/280 In response to your request at the ACRS Subcommittee meeting held September 17-18, 1981, tfississippi Power & Light Company is submitting to you copies of the Grand Gulf Nuclear Station ' Of f-Normal Event Procedures" (ONEP's) which are a part of the emergency operating instructions for personnel at the Grand Gulf facility.

I f you have any questions or require additional information, please contact this office.

Yours truly, ,

,  ?

/

t- f-c l, ', : / ,

Mr ~ '~ s u

ll' L. F. Dale "

/  ?!anager of Nuclear Services RFP/JGC/JDR: 1m Attachments cc: tir . N. L. Stampley (w/o)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/o) g{

Office of Inspection & Enforcement O U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (Continued on Next Page) 8206300231 820625 PDR ADOCK 05000416 P PDR AE3T1 Member Middle South Utilities System

t MISSISSIPPI POWER O LICHT CCMPANY AECM-82/280 Page 2 i

cc: (Continued)

Mr. J. P. O'Reilly, Regional Administrator (w/o)

Office of Inspection & Enforcement

, Region II 101 Marietta Street, N.W., Suite 3100 Atlanta, Georgia 30303 Mr. Herman Alderman (w/2)

Advisory Committee on Reactor Safeguards 1717 H. Street Room H 1016 Washington, D.C. 20555 4

i f

l

(

1 I

l i

r l

AE3T2

r

~

Attachment to AECM-82/280 OFF-NOPJfAL EVENT PROCEDURES LISTING Procedure Number Description Revision 05-1-02-I-1 Reactor Scram 11 05-1-02-I-2 Turbine and Generator Trips 10 05-1-02-I-3 Single MSIV Closure 10 05-1-02-I-4 Loss of Offsite Power 11 05-1-02-I-5 Resin Intrusion Into the Reactor Vessel 11 05-1-02-II-1 Shutdown from the Remote Shutdown Panel 11 05-1-02-II-2 Off Gas Activity High 11 05-1-02-11-3 Offsite Gaseous Releases 10 05-1-02-II-8 High Radiation During Fuel Handling 10 05-1-02-II-9 High Airborne 11 05-1-02-II-11 Liquid Radwaste System Leak or Failure 10 05-1-02-II-12 Solid Radwaste Spill 10 05-1-02-III-1 Inadequate Decay ifeat Removal 10 05-1-02-III-2 Loss of One or Both RPS Buses 10 05-1-02-III-3 Decrease in Recirculation System Flow Rate 11 05-1-02-III-5 Automatic Isolations 12 05-1-02-III-11 Containment Hydrogen Control 11 05-1-02-IV-1 Control Rod / Drive Malfunctions 11 05-1-02-IV-6 Loss of RPIS 11 05-1-02-V-1 Loss of Component Cooling Water 10 05-1-02-V-2 Loss of Turbine Building Cooling Water 11 05-1-02-V-3 Pressure Control Failure - Reactor Pressure Decreasing 10 05-1-02-V-4 Pressure Control Failure - Reactor Pressure Increasing 11 05-1-02-V-5 Loss of Feedwater Heating 11 05-1-02-V-6 Feedwater Control Failure Max Demand 11 05-1-02-V-7 Loss of Feedwater Flow II 05-1-02-V-8 Loss of Condenser Vacuum 10 05-1-02-V-9 Loss of Instrument Air 10 05-1-02-V-10 Loss of Standby Service Water Loop A, B, or C 10 05-1-02-V-11 Loss of Plant Service Water 10 05-1-02-V-12 Condensate High Conductivity 10 05-1-02-V-13 Hydrogen Explosion in the Off Gas System 11 05-1-02-V-14 Main Generator Primary Water High Conductivity 11 05-1-02-V-15 Low System Frequency 10 05-1-02-VI-1 Flooding 10 05-1-02-VI-2 Hurricanes, Tornados, and Severe Weather 10 05-1-02-VI-3 Earthquake 10 AE3T3