PLANT OPERATIONS MANUAL g
t h
volume 05 05-1-02-11-2 Section 02 Revision:
10 Date: 3-19-82 j
OFF-NORMAL EVENT PROCEDURE OFF GAS ACTIVITY HIGH SAFETY RELATED
?
Prepared:
e
(
Reviewed:
/
Nuclear Planul Qualit/ Superintendent V Tei:hnical Review Reviewed:
Mh Operati s Su erintendent Approved:
M, 1t
/>
PSRC:
/_
/*
3 p
~
y
(--
i List of Ef fective Pages:
I Page:
Revis ion:
1-2 10 b-8206300254 820625 PDR ADOCK 05000416 P
r
... ~. -...
,.5_
e e
.ss GRAND GULF NUCLEAR STATION OFF-NORMAL EVENT PROCEDURE l
Title:
Of f Cas Activity High lNo.:
05-1-02-11-2 l Revision: 10 iPage: 1 1
l l
l l
l 1.0 PURPOSE / DISCUSSION 1.1 To provide instructions to the operator in the event of high or increasing activity La the Of f Gas System.
1.2 This procedure may interface with the Emergency Plan.
1.3 Condenser off gas high radiation may be indicative of a fuel element failure and fission product release. This procedure covers the period
}
from the discovery of an increasing Off Gas Activity, to the entrance into the emergency plan and a resulting plant shutdown if necessary.
j 2.0 SYMPTOMS 2.1 Increasing activity in the reactor vessel water samples.
2.2 Increasing main steam line radiation monitor readings.
r#
2.3 Increasing off gas pretreatment radiation monitor readings.
2.4 Increasing off gas post-treatment radiation monitor readings.
2.5 Annunciators,. High or High-High, on any of the above monitors.
3.0 AUTOMATIC ACTIONS
~
~
~
3.1 If the main steam line radiation monitor reaches 2.5 times normal background, the reactor will scram and a Group I isolation will occur.
3.2 If the of f gas post-treatment radiation monitor reaches the High-High-High setpoint, the following valves will close, isolating the off gas train:
3.2.1 IN64-FV-ET)60, OFF GAS DISCHARGE TO VENT.
3.2.2 F054, PREFILTER INLET DRAIN.
i 3.2.3 F034A(B), CONDENSER DRAIN.
3.2.4 F023, HOLDUP LINE DRAIN.
4.0 IMMEDIATE OPERATOR ACTIONS 4.1 Verify the appropriate automatic actions have occurred.
4.2 If the reactor scrammed, carry out actions of ONEP 05-1-02-1-1, Reactor Scram.
If MSIV closure occurred, enter EP-1, Level Control.
b
.