ML20054J972

From kanterella
Jump to navigation Jump to search
Offnormal Event Procedure 05-1-02-II-2, Offgas Activity High,Safety-Related, Revision 11
ML20054J972
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 06/12/1982
From:
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20054J949 List:
References
05-1-02-II-2, 5-1-2-II-2, NUDOCS 8206300252
Download: ML20054J972 (3)


Text

-. ____ -_______ _ __

. ., f . , ,

PLANT OPERATIONS FANUAL Volume 05 ,

05-1-02-II-2 Section 02 kevision: 11 Date: 6-12-82 OFF-NORMAL EVENT PROCEDURE OFF CAS ACTIVITY HIGH SAFETY RELATED

/

~~ ~

Prepared: -- _ 472 _ , , * - - ' ' _' I ' * ~ i -

~~

" Reviewed: / /- 4h' -

,_ Nuclear Plant Quality 'Superintdndent ' ' Technical Review Approved: M$

~ - - - -

6pe ratiojt a Superintendent - - - - -

Concurrence: -

Assistanf Plaint Nanaf '~'

PSRC: / g//f/Fc

< u -- ,,

. .. .. ,..( . .

List of Effective Pages: .. .' ;.. . i 6 . . . --

Page: - *

  • l-2 List of TCN's Incorporated:

Revision TCN No.

. 10 None 11 None 8206300252 820625 PDR ADOCK 05000416 p PDR ,

< GRAND CULF NUCLEAR STATION

  • .. OFF-NORMAL EVENT PROCEDURE

Title:

Off Cas Activity High No.: 05-1-02-11-2 P.evis ion : 11 Page: 1 1.0 PURPOSE / DISCUSSION 1.1 To provide instructions to the operator in the event of high or increasing activity in the Off Gas System.

1.2 This procedure may interface with the Emergency Plan.

1.3 Condenser of f gas high radiation may be indicative of a fuel element failure and fission product release. This procedure covers the period from the discovery of an increasing Off Gas Activity, to the entrance I

into the emergency plan and a resulting plant shutdown if necessary.

2.0 SYMPTOMS 2.1 Increasing activity in the reactor vessel water samples.

2.2 Increasing main steam line radiation monitor readings. ft 2.3 Increasing off gas pretreatment radiation monitor readings.

_ . .. . - ~ . - -

2.4_ Increasing off gas post-treatment radiatiod"bonitor readings.

', Z2" h

  • 2.5 Annunciators, High or High'~Eigh, on any of the above monitors.

~

3.0 AUTOMATIC ACTIONQ .

~

3.1~ If the main steam line radiation monitor reaches 3.0 times normal background, the reactor will scram and a Group I isolation will occur.

~

I'f' the of f gas pos t-treatment radiation monitor reaches the~

~

3.2 $

High-High-High setpoint, the following valves will close, isolating the

. .off gas train: _

3.2.1 IN64-FV-F060, OFF GAS DISCHARGE TO VENT.

. 3.2.2 F054, PREFILTER INLET DRAIN. i 3.2.3 F034A(B), CONDENSER DRAIN.

3.2.4 F023, HOLDUP LINE DRAIN.

4.0 IMMEDIATE OPERATOR ACTIONS 4.1 Verify the app opriate automatic actions have occurred.

4.2 If the reactor scrammed, carry out actions of ONEP 05-1-02-I-1, Reactor Scram. If MSIV closure occurred, enter EP-1, Level Control. -

1 e

, GRAND GULF HUCLEAR STATION OFF-NORMAL EVENT PROCEDURE

Title:

Off Gas Activity High No.: 05-1-02-II-2 Revision: 11 Page: 2 I

4.3 Reduce power using recirculation pumps in step changes as per power and flow limitation to lower of f gas pretreatment and main steam line radiation levels below the alarm setpoint.

4.4 Contact chemistry to draw an off Fas sample and reactor vessel sample.

4.5 Notify Health Physics of the increasing readings or alarms.

5.0 FUBSEQUENT ACTIONS 5.1 Proceed to implement the Emergency Plan if directed by the Shift Supervisor or Shift Superintendent.

5.2 kfareductioninpowerdoesnotcauseadecreaseinoffgaspretreatment equilibrium activity, the reactor should be manually scrammed to prevent reaching the main steam line radiation monitor high setpoint and Greup I isolation. This will prevent'the more severe transient caused by the isolation.

5.3 If off gas pos t-treatment .tadiation levels are.below th.e .High-High . ,

- s'etpoint and the reactor is still operating 7, operation may continue 'to 1 allow the Reactor Engineers to perform an evaluation to determine the location of the faulty fuel.

5.4 If it can be determined that the problem is not related to fuel failure, increase power in' accordance with IOI 03-1-02-2, Power Operation, as

.-- desired.

5.5 If off gas or reactor coolant samples exceed Technical Specification Sections 3.4.4 Reactor Coolant Sys tem Chemist ry, or 3.11.2.1 Gaseous Effluents, shutdown the reactor if req'uired in accordance with 101 03-1-01-3, Plant Shutdown.

5.6 Verify the RWCU System is operating properly.

$~^ ~

57f If a Group 1 isolation occurs, from main steam line radiation monitor reaching 3.0 times normal background, keep MSIV's closed if fuel failure is evident. Do not start the mechanical vacuum pumps to prevent the loss of condenser vacuum, since they release directly to the Turbine Building roof. Refer to ONEP 05-1-02-V-8, Loss of Condenser vacuum.

4

_ - - _ _ - _ - _ . _ _ _ _ - - _ _ _ _ _ _ _ _ . . _ _ _ - _ - __ . _ - _ _ _ _ _ - - _ _ _ _ . - - _