AECM-90-0106, Forwards Rev 9 to GGNS-TOP-1A, Operational QA Manual, for Evaluation

From kanterella
(Redirected from ML20043G334)
Jump to navigation Jump to search
Forwards Rev 9 to GGNS-TOP-1A, Operational QA Manual, for Evaluation
ML20043G334
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/11/1990
From: Cottle W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20043G336 List:
References
AECM-90-0106, AECM-90-106, NUDOCS 9006200163
Download: ML20043G334 (3)


Text

_ __________

1

'l v

Ent8r9 no a',e rai: av ca '::aw 'a>-

a.

'c =-

Operat ons

% a== =

U (01-437 f43 W. T. Cottle w %.w N K'4W UCQ%

June 11, 1990 1

U.S. Nuclear Regulatory Commission

{

Mail Station P1-137 l

Washington, D.C.

20555 Attention:

Document Control Desk i

Gentlemen

SUBJECT:

Grand Gulf Nuclear Station l

Unit 1 i

Docket No. 50-416 License No. NPF-29 Operational Quality Assurance Manual AECM-90/0106 i

As required by 10CFR50.54(a)(3), the Entergy Operations, Inc.

Operational Quality Assurance Manual (OQAM), GGNS-TOP-1A, Revision 9, is being submitted for your evaluation.

j To aid you in your review, we have submitted the OQAM in a format to clearly show all changes to the previously accepted version (Revision 8)..

The material which has been deleted is shown hy'phenated-through (example); the new material has been shown in light italie (example). This format is used in Attachment "B".

Attachment C is the identical Manual with the overstruck material deleted and the light italic material incorporated.

This format is the actual record copy of our submittal. A revision bar and the number "9" in the right-hand margin identifies each change.

i Based on a review and evaluation by the Quality Programs Department, the OQAM continues to satisfy the requirements of 10CFR50, Appendix B and the Regulatory Guides and ANSI Standards referenced in Appendix A of the OQAM.

The program described in OQAM, Revision 9 will be implemented upon NRC approval or 60 days after the date of this submittal.

If you should have any question, please contact the Manager, Quality Services, Stephen F. Tanner (601-437-6711).

Yours truly, 9006200163 900611 7 PDR ADOCK 05000416 7

p PNV g

WTCitkm Attachments:

A.

Description of Proposed Changes and their Disposition B.

OQAM, Revision 9, Highlight Format C.

OQAM, Revision 9, Official Submittal per 10CFR50.54(a)(3)

)

f cci (See Next Page)

-A9006071/SNLICFLR - 1 4

s

A-AECM-90/0106 P:g3 2 t ';

cc:

Mr. D. C.=Hintz-(w/o)

Mr. T. H. Cloninger (w/L)

Mr. R. B. McGehee (w/o)

Mr. N.

S. Reynolde (w/o)

Mr. H. L. Thomas (w/o)

Mr. H. O. Christensen (w/a)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St.,

N.W., Suite 2900 Atlanta, Gevrgia 30323 Mr. L. L. Kintner, Project Manager (w/a) office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop llD21 Washington, D.C.

20555 3

l 4

j I

l I

1 9

A9006071/SNLICFLR - 2

.- t -

i t

r"~

g O

tI.

(;

l s(p -

I i

P k

P At.t.achment. A to AECM-90/0106 A9006071/SNLICFLR - 4 Sh.