ML17342B179

From kanterella
Revision as of 10:30, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Corrected Operating Data Repts for Nov 1987
ML17342B179
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 11/30/1987
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17342B170 List:
References
NUDOCS 8802220145
Download: ML17342B179 (4)


Text

Corrected Copy'OF'ERATXNG DATA REPORT OPERATXNG STATUS DOCI<ET NO 50-335 DATE 12/14/87 COMF'LETED BY N, W.GRANT TELEF'HONE 305/694/4432 1.UNIT NAME: ST.LUCXE UNXT 1 2.REPORTING PERXQD:NOVEMBER 1987 3 t LICENSED THERMAL POWER (MWT): 2700 4t NAMEPlATE RATING (GROSS MWE)t 850 5 DESXGN ELECTRICAL RATXNG (NET MWE)'30 h.'MAXIMUM DFPENDABLE CAPACITY<GROSS MWE)t 872 7.MAXXMUM DEPENDABLE CAF'ACXTY (NET MWE)t'39 8.IF CHANGES OCCUR IN C*F'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GXVE RE*SONS: POWER LEVEL TQ WHICH RESTRICTED~

XF ANY.(NET MWE)10t RE*SONS FOR RESTRXCTIONSD XF ANY: MONTHLY-YTD-CUMULATIVE 1 1.HOURS IN REPORT PERIOD l.12.NUMBER OF HOURS'EACTOR WAS CRITICAL 13t REACTOR RESERVE SHUTDOWN HOURS i4.HOURS GENFRATQR ON-LINE 15, UNIT RESERVE SHUTDOWN HOURS 1'6.GROSS THERMAL ENERGY, GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GERERATED.(MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNXT SERVICE.FACTOR 20, UNXT AVAXLABIL'XTY FACTOR 21t CAPACITY FACTOR (USING MDC,NET)2.CAPACXTY F*CTOR<USXNG DER NET)23.UNIT FORCED OUTAGE RATE'4.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 e 0 OtO 728.0 0 1937190 647140'14715 100tO 100tO 10it8 102t9 0 8016 6233t7 0.0 6079tO 0 16155399 53?7920 5088109 75.8 75t8 75t7 76.5 4.7 95928tO 70806.4 20~t3 70234t6 39t3 179374 90 58863065 55573932 73.2 73t3 72t2 70t9 I 40 I 25.IF SHUT DOWN AT END OF REPORT PERIOD~ESTIMATED DATE OF STARTUP: '8802220,145 880216'DR ADOCK 05000250 R ,.DCD 1l hl OPERATXNG STATUS Corrected CopV OPERATING DATA REPORT DOCVET NO 50-389 DATE 12/14/87 COMPLETED BY N'.W.GRANT TELEPHONE 305/694/4432 io UNIT NAME: STi LUCIE UNIT 2 REPORTXNG PERTOD:NOVEMBER 1987 3.LICENSED THERMAL POWER (MWT)o~700 NAMEPLATE RATXNG<GROSS MWE)~850 5.DESIGN FLECTRXCAL RATING (NET MWE): 830 6.MAXXMUM DEPENDABLE CAPACITY (GROSS MWE)o 882 7.MAXXMUM DEPENDABLE CAPACITY<NET MWE)e 839 8.IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GIVE REASONS', POWER LEVEL TO WHICH RESTRICTED.

IF ANY (NET MWE)10m REASONS FOR RESTRICTIONS'F ANY+MONTHLY-YTD-CUMULATIVE 11.HOURS XN REPORT PERIODS 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14m HOURS GENERATOR ON-LINE 15+UNIT RESERVE SHUTDOWN HOURS lb.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GERERATED (MWH)18.NET ELECTRXCAI ENERGY GENERATED (MWH)19.UNXT SERVICE FACTOR 20.UNXT AVAXLABXLXTY FACTOR 21.CAPACITY FACTOR (USXNG MDC NET)22'*PACXTY FACTOR (USING DER NET): 3.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 104+4 OiO 44+9 0 44019 12610"2005 6+2 6+2 Oi3 Oi3.74.3 8016 6640+9 OiO 6477o9 0 17046286 5652230 5341510 80i8 80+8 79i4 80i3 37825.0 32016.5 0+0 31305i7 0 81084187 27046380 25559114 82+8 82)8 82+6 82i4 2,.XF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP l 12/3/87 0 Ql a~