ML17229A554

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr
ML17229A554
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/1997
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-97-310, NUDOCS 9712170434
Download: ML17229A554 (8)


Text

CATEGORY 1 REGULA Y INFORMATION DXSTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9712170434 DOC.DATE: 97/11/30 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS<( J.'A.' Florida Power &, Light Co.

STALL.J.A. Florida Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Nov 1997 for St Lucie,Units 1 &

2.W/971211 ltr.

DXSTRIBUTXON CODE: XE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 WIENS,L. 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 E CEN R 1 1 OC/DBA/PAD 1 1 RGN 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Florida Power 5 Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 December 11, 1997 L-97-310 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 MontM~peratingdkeport Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the November 1997 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant

, ."-6 97'~<>QQQCK PDR

~gq 9vxxso 0500Q335 pDR I

8

'llllllllllllllIlfiiiillllllII IIIIIII an FPL Group company

DOCKET NO 50 - 335 UNIT NAME ST. LUCIE UNIT 1 DATE 12/04/97 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: NOVEMBER 1997 1

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH - YTD- CUMULATIVE
3. Number of Hours Reactor Critical 0.0 6858.7 143526.3
4. Number of Hours Generator On Line 0.0 6843.1 141940.2
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 0.0 5717746 114885059

RATI EXPERIE E DOCKET NO.: 50-335 UNIT: St. Lucie g1 DATE: December 4, 1997 COMPLETED BY: aT.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH o ember 1 Unit 1 remained out of service for the entire month of November for steam generator replacement/refueling activities.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNlT NAME: ST. LUClE UNlT 1 DATE: Dec. 4, 1997 COMPLETED BY: J.A. Rogers REPORT MONTH N v mb r Number Date Type'uration Reason'ethod of & Corrective (Hours)

Reactor'ause Shutting Down Action to prevent Recurrence 10/20/97 720.00 Unit 1 remained offline for the entire month for steam generator replacement/refueling activities.

1 3 F Forced Reason Method S Scheduled A - Equipment failure (explain) l - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 Continued E - Operator Training a License Examination 5 Load Reduction F - Administrative . 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 09X$ $ 1 FPL

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 12/04/97 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: NOVEMBER 1997

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH - YTD- CUMULATIVE
3. Number of Hours Reactor Critical 720 7051.3 106497.5
4. Number of Hours Generator On Line 720 7012.4 104896.6
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 615292 5861136 85628606

SUMMARY

OF OPERATI G EXPERIE CE DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: December 4, 1997 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH November 19 7 Unit 2 operated at essentially full power for the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~ 50-389 UNIT NAME ST LUCRE UNlT 2 DATE Dec.4, 1997 COMPLETED BY J. A. Rogers TELEPHONE (56K) 467-7296 REPORT MONTH N v b r Number Date Duration Reason Method of Cause & Corrective (Hours) Shutting Action to Down Prevent Recurrence Reactor Unit 2 operated at essentially full potver for the entire month of November.

3 F Forced Reason Method S Scheduled A - Equipment failure (explain) l - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)