Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr
ML17229A770
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/31/1998
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-160, NUDOCS 9806190046
Download: ML17229A770 (9)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTXON 'SYSTEM (RIDS)

ACCESSION NBR:9806190046 DOC.DATE: 98/05/31 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 8 Light Co. 05000335 50-3)P St. Lucie Plant, Unit 2, Florida Power &. Light Co. 05000389 AUTH.NAME "'" AUTHOR AFFILIATION ROGERS,J.X. Florida Power S Light Co.

STALL,J.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for May 1998 for St Lucie,Units 1 &

2.W/980612 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ~ ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 GLEAVES,W 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 ENTER. Oi 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H NOAC 1 1-NRC PDR D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Florida Power & Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 June 12, 1998 L-98-160 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 hfanthl~peratingdkeport Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the May 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector', USNRC, St. Lucie Plant

~yg'806i90046 98053i PDR ADQCK 05000335 R PDQR an FPL Group company

I.

DOCKET. NO 50 - 335 UNIT NAME ST. LUCIE UNIT 1

DATE, COMPLETED BY 06/07/98 J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: MAY 1998
1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 3306.2 146832.5
4. Number of Hours Generator On Line 744 3256.5 145196.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 637521 2728184 117613243

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.:

UNIT: St. Lucie Ni DATE: June 7, 1998 TELEPHONE'0-335 COMPLETED BY: J.A.ROGERS (561) 467-7296 Unit 1 operated at essentially full power for the entire month of May.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

DOCKET NO 50 - 389 UNIT NARK ST. LUCIE UNIT 2

DATE, COMPLETED BY 06/07/98 J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: MAY 1998
1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 3623 110864.5
4. Number of Hours Generator On Line 744 3593.9 109234.5
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MVBQ 626013 3081275 89347668

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie N1 DATE: June 7, 1998.

COMPLETED BY: J.A.ROGERS ~

TELEPHONE: (561) 467-7296 REPORT MONTH M~a1998 Number -

Date Type Duration Reason Method of Cause F8 Corrective (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor>

Unit 1 operated at essentially full power for the entire month of Ma .

1 2 3 F Forced Reason Method A - Equipment 1 - Hanual S Scheduled

- NaintenanceFailure tExplain) 2 - Nanual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory Restriction - Continued E - Operator Training & License Exand.nation 4

5 - Load Reduction F - Administrative 9 Other (Explain)

G - Operational Error tExplain)

H - Other tExplain) 098889 EPr

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie 02 DATE June 7, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH M~a 1998 Unit 2 operated at essentially full power for the entire month of May.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie g0 DATE: June 7, 1998 COMPLETED BY J.A. ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Mav 1998 Number Date T/$ e Duration Reason Method of Cause tx Corrective (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor>

Unit 2 operated at essentially full popover for the entire month of Ma .

2 3 F Forced Reason Method

- l - Manual S Scheduled A

- MaintenanceFailure Equipment tExplain) 2 - Manual Scram B

- Refueling or Test -

C D - Regulatory Restriction 3 4 - Automatic Continued Scram E - Operator Training & License Examination 5 - 'Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091557 TPL