ML17342B183
| ML17342B183 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, 05000000 |
| Issue date: | 11/30/1987 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17342B170 | List: |
| References | |
| NUDOCS 8802220161 | |
| Download: ML17342B183 (2) | |
Text
QF'ERATXNG STATUS Corrected, Copy OPERATING DATA REPORT DOC)(ET NO 50 250 DATE 12/14/87 COMPLETED BY No W.
GRANT TELEPHONE 305/694/4432 UNXT,NAME 'e TURYEY POIN T IJNXT 3 REFORTING FERXQD:NOVEMBER 1987 3.
LICENSED THERMAL POWER (MWT')t 2200 4
NAMEPLATE RATING (GROSS'WE)'60 5.
DESIGN El ECTRXCAL RATING (NET MWE):
693 6.
MAXXMUM DEPENDABLE CAF'ACITY (GROSS MWE) +
699 7 s MAXIMUM DEPENDABI E CAPACITY
( NET MWE )
o 666.
'Go XF CHANGES OCCUR XN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SXNCE LAST REF'QRT 9 GIVE REASONS i 9o POWER LEVEL TO 'WHICH 'RESTRICTED~ IF ANY (NET MWE) 10 i REASONS FOR RESTRICTIONS.9 IF ANYi MONTHLY
-YTD-CUMULATIVE ii, HOURS IN REF'ORT PERIOD:
12 i NUMBER QF HOURS REACTOR WAS CRXTICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14 t HOURS GENERATOR ON-LINE 15'NIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 17.,GROSS ELECTRXCAL ENERGY GERERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19 o UNIT SERVXCE FACTOR 20, UNIT AVAXLABILITYFACTOR 21.
CAPACITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USXNG DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 OoO 0.0 OiO 0
0 0
-5074 OiO 0.0 0 '
0+0 100. ()
- 8016, 1747o4 OiO
,i426+5 0
2831092 928210 833099 17 '
17.8 15,i 6 15iO 58.6 I
131385.6 87813+2 844i4 86693+9 121 i8 179676499 57563061 54455739 66oO 66.1 63.6 59'.
9.8 I
25.
XF SHUT DOWN AT END OF REPORT PERIOD 9 ESTIMATED DATE OF STARTUP: 12/17/ 87
'8802220161 880216
- PDR,
'ADOCK 05000250
",R
.. =.
~...,.D.CD.
Il 0
e; C
C;4 q4 J