ML17229A581

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr
ML17229A581
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/31/1997
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-009, L-98-9, NUDOCS 9801160016
Download: ML17229A581 (12)


Text

CATEGORY 1 REGULA Y INFORMATXON DISTRIBUTI YSTEM (RIDS)

ACCESSION NBR:9801160016 DOC.DATE: 97/12/31 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-,389 gt. Lucie Plant, Unit 2, Florida- Power &. Light Co. 05000389 AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power & Light Co.

STALL,J.A. Florida Power &.'Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Dec 1997 for St Lucie,Units 1 &

2.W/980108 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 WIENS,L. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTE 1 OC/DBA/PAD 1 1 EXTERNAL: LITCO BRYCE,J H NOAC NRC PDR D

0 U

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

P C

Florida Powers Light Company,6351 S. Ocean Drive, Jensen Beach, FL34957 January 8, 1998 L-98-009 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

~LR Re: St. LucieUnits 1and2 Docket Nos. 50-335 and 50-389 Wa Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the December 1997 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us.'ery truly yours, .

J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 980iihOOi6 97i23i PDR ADQCK 05000335 I R PDR LI lllllll gglllllllllllllllllIII an FPL Group company

I

DOCKET NO 50 - 335 UNIT NAME ST. LUCIE UNIT 1 DATE 01/05/98 COMPLETED BY J. A. ROGERS TELEPHONE, 561/467/7296 REPORTING PERIOD: DECEMBER 1997

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 0.0 6858.7 143526.3
4. Number of Hours Generator On Line 0.0 6843.1 141940.2
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 0.0 5717746 114885059

UMMARY OP OPERATI G EXPERIE CE DOCKET NO.: 50-335 UNIT: St. Lucie 51 DATE: January 5, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH December 1 Unit 1 remained out of service for the entire month of December for steam generator replacement/refueling activities.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST. LUCIE UNIT 1 DATE: Jan. 5, 1998 COMPLETED BY: J.A. Rogers REPORT MONTH Number Date Type~ Duration Reason'ethod of & Corrective (Hours)

Reactor'ause Shutting Down Action to Prevent Recurrence 10/20/97 S 744.00 Unit I remained offline for the entire month for steam generator replacement/refueling activities.

F Forced Reason Method S Scheduled A - Equipment failure (explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training k License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091S17 FN

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 01/05/98 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: DECEMBER 1997

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 7795.3 107241.5
4. Number of Hours Generator On Line 744 7756.4 105640.6
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 637787 6498923 86266393

RY F OPERATI G EXPERIE CE DOCKET NO.: 50-389 UNIT: St. Lucie 52 DATE: J'anuary 5, 1998 COMPLETED BY: J'.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Decembe Unit 2 operated at essentially full power for the entire month of December.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~ : 50-389 UNIT NAME: ST LUCIE UNITi 2 DATE: Jan. 5, 1998 COMPLETED BY: J. A. Rogers TELEPHONE: (561) 467-7296 REPORT MONTH e mber 1 7 Number Date Type Duration Reason'ethod of & Corrective (Hours)

Reactor'ause Shutting Down Action to Prevent Recurrence Unit 2 operated at essentially full power for the entire month of December.

F Forced Reason Method S Scheduled A - Equipment failure (explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Sc~am D - Regulatory restriction 4 - Continued E - Operator Training k License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)