ML17342B184
| ML17342B184 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, 05000000 |
| Issue date: | 12/31/1987 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17342B170 | List: |
| References | |
| NUDOCS 8802220164 | |
| Download: ML17342B184 (2) | |
Text
OPERATING STATUS Corrected Copy OPERATING DAT* REPORT DOCKET NO 50 250 DATE 1/12/88 COMPLETED BY Ni Hi GRANT TELEPHONE 305/694/4432 UNIT NAME'URKEY POINT UNXT 3 Zo REPORTING PERXODoDECEMBER 1987 3 i L'ICENSED THERMAL POWER
( MHT )
o 2200 4.
NAMEPLATE RATXNG (GROSS MHE):
760 5+
DESXGN ELECTRICAL RATING <NET MHE) o 693'o MAXIMUM DEPENDABLE CAPACITY (GROSS MHE)i 699 7i MAXIMUN DEPENDABLE CAPACITY (NET 'MWE) $'66 8o XF CHANGES OCCUR XN CAPACXTY RATINGS (XTEMS NUMBER 3 THROUGH 7)
SXNCE LAST ',REPORT~ 'GIVE REASONS'i POWER LEVEL TO HHICH RESTRICTED~
.XF ANY (NET MWE) 10 REASONS'OR RESTRICTIONS~ IF ANY:
MONTHLY
-YTD-CUMULATIVE 1 1 i HOURS IN REPORT PERIOD i 12+
NUMBER OF HOURS REACTOR HAS CRITICAL 13'.
REACTOR RESERVE SHUTDOHN HOURS 14.
HOURS GENERATOR ON-LXNE 15, UNIT RESERVE, SHUTDOWN, HOURS 16'ROSS THERMAL ENERGY GENERATED'MHH) 17+
GROSS ELECTRICAL ENERGY GERERATED
<MHH) 18+
NET ELECTRICAL ENERGY GENERATED
<MHH) 19.
UNIT SERVICE FACTOR 0,
UNIT AVAXLABILXTYFACTOR 21 i CAPACITY FACTOR,'USING MDC NET) 22, CAPACITY FACTOR (USXNG DER NET) 23.
UNXT FORCED OUTAGE RATE 24'HUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 744 162i4 OoO 141o2 0
127764 34940 23047 19i0 19o0 4i7 4o5 81 i0 87.60 1909' OiO 1567i7 0
2958856 963150 856146 17+9 17i9 14o7 14oi 62.6 132129i6 87975.7'44i4 86835oi 12ii8 179804263 57598001 54478786'5i7 65i8 63oZ 59t5
- 10. 3
- 25. IF SHUT DOHN AT END OF REPORT PERIOD~
ESTIMATED DATE OF STARTUPi I., '88022201"64
.88021'6
'PDR ADOCK 05000250
,R, DCD
0 0