Text
A ~
GE DAILY UNIT POWER LEVEL DOCKET NO.50-26O UNIT Turke Point Unit 3 DATE ar CONPLETED BY N.W. Grant TELEPHONE 305 694-4432 Januar DAY AVERAGE DAILY POWER LEVEL
'(N Me-Net) 1/ 1/88 1/ 2/88 1/ 3/88 1/ 4/88 1/ 5/88 1/ 6/88 1/
7/88'/8/88 1/ 9/88 1/10/88'/11/88 1/12/88 1/13/88 1/14/88 1/15/88 1/1'6/88 1/17/88 1/18/88 1/19/88 1/20/88 1/21/88 1/22/88 1/23/88 1/24/88'/25/88 1/26/88 1/27/88 1/28/88 1/29/88 1/30/88 1/31/88 29 222 454 496 659
'62
- 558 571 568 572 650 687 145 7
-4
-2 2
-2
-2
-3
-3
-3
-4 5
5 5
,'8802220117 8802}6
.'PDR
.ADOCK, 05000250
.R,
...,,,,...;...,..'DGQ,
OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 250
,DATE 2/ 8/88 COMPLETED BY Ni W+
GRANT TELEPHONE 305/694/4432 1 t UNIT NAME+ TURKEY POINT UNIT. 3 2 o REPORTING PERIOD+
JANUARY 1988 3,
.LXCENSED THERM*L POWER (MWT):
2200 4o NAMEPLATE R*TXNG (GROSS MWE):
760 5i DESIGN ELECTRIC*L RATXNG (NET MWE) o 693 6+
MAXIMUM DEPENDABLE CAPACITY (GROSS.MWE):
- 699, 7i MAXIMUM DEPENDABLE CAPACITY (NET MWE) e 666 8+ IF 'CHANGES OCCUR IN CAP*CITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT r 'GXVE REASONS
'OWER LEVEL TQ WHICH RESTRXCTEDr IF ANY (NET MWE) 10 i REASONS FOR RESTRICTIONS r XF ANY+
MONTHLY
-YTD-CUMULATIVE ii HOURS IN REPORT PERIOD:
12 NUMBER OF HOURS REACTOR 'WAS CRXTICAL 13i REACTOR RESERVE SHUTDOWN HOURS 14+
HOURS GENER*TOR ON-LINE 15'NXT RESERVE SHUTDOWN HOURS 16+
GROSS THERMAL ENERGY GENERATED (MWH) 17+
GROSS ELECTRICAL ENERGY GERERATED (MWH) 18+
NET ELECTRICAL ENERGY GENERATED (MWH) 19+
UNIT SERVICE FACTOR 20 o UNIT AVAILABILITYFACTOR 2'1+
CAPACITY 'FACTOR (USXNG MDC NET) 22'APACITY FACTOR (USXNG DER NET) 23r UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
+
744 301 i 4 OiO 279+7 0
518378 160368 147931 37+6 37+6 29i9 282' 744 301i4 OoO 279i7 0
518370 160360 147931 37i6 37o6 29+9 28i7 62+ 4 124113 i 6 86367o2 844i4 85547+2 121+8 177363777 56795211 53778571 68o9 69+0 66+5 62o5 10+9 25+ IF SHUT DOWN AT END OF REPORT PERXODr ESTIMATED DATE OF STARTUPi
t t
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
UNIT
~ DATE COMPLETED BY TELEPHONE Tur Pi t Februar 16 1988 N.
W.
Gr ant 305 694-4432 REPORT MONTH See the "Unit 'Shutdowns and Power Reductions" report.
Page 1 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.
50-'250 UNiT NAME Turke Poillt Unit 3 DATE February, 16, 1988 COMPLETED BY TELEPHONE No.
Date Type Duration (Hours)
Reason~
Method of Shutting Down Reactor.
Licensee Event Report¹ System Code4 Component odes Cause &Corrective Actionto Prevent Recurrence 1
880101 15.9 B
HA TUR'BIN~ The unit was shutdown for main turbine balancing.
Upon return to operation, power was limited for chemistry control and flux mapping.
2 880113 448.4 RB CRDRVE Unit 83 experienced a turbine runback to approximately 70% power due to a dropped control rod.
IUhen the cause of the dropped rod could not be determined immediately a controlled shutdown was commenced.
IUhile shutting down, trouble shooting of dropped rod continued and resulted in the dropping of 2 additional rods.
A subcritical manual trip was then initiated.
F Forced S Scheduled Reason A - Equipment Failure (Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &License Examination F - Administrative G - Operational Error (Explain)
H - Other(Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain) 4 ExhibitG-Instructions forPreparation of Data Entry Scheets Ucensee Event Report(LER) File (NUREG%161) 5 Exhibit1-Same Source
0 l
~%
Page 2 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE P
Date Type Duration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Report¹ System Code 4 Component Codes Cause &Corrective Actionto Prevent Recurrence While trouble-shooting the dropped rods,
. a small weld leak in the CRDM canopy was discovered and repaired.
Additional work on a leaking "C" reactor coolant pump seal is:ongoing.
F Forced S Scheduled Reason A - Equipment Failure (Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &License Examination F - Administrative G - Operational Error (Explain)
H - Other(Explain) 3 Method 1 - Manual 2-ManualScram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain) 4 ExhibitG-Instructions forPreparation'of Data Entry Scheets Licensee Event Report(LER) File (NUREG%161) 5 Exhibit1-Same Source 0915Sr
0
RAOE OAILV'NITPONER LEVEL DOCKET NO.
- UNIT Turke
'Point Unit 4 DATE Februar CONPLETED BY N.W. Grant TELEPHONE NNTH'anuar 1988 DAY AVERAGE DAILY POMER LEVEL (m We-Set);
1/ 1/88 1/ 2/88
,1/
3/88'/4/88, 1/ 5/88 1/
6/88'/7/88 1/ 8/88 1/ 9/88
.1/10/88 1/ii/88 1/12/88 1'/13/88 1/1'4/88 1/15/88 1/16/88 1/17/88 1/18/88 1/19/88 1/20/88
,1/21/88 1/22/88 1/23/88 1/24/88 1/25/88 1/26/88.
1/27/88 1'/28/88 1/29/88 1/30/88 1/31/88 704 703 700 695 694'01 702'97 694 693 697.-
622 646 695 698 695 699 698 694'90 692 693 65!8 702 697 701 703.
706 706'.
708 705
ll 5
OPERATING STATUS OPERATING DATA REPORT DOCKET:NO 5P
~51 DATE 2/ 8/88 COMPLETED BY No Hi GRANT TELEF'HONE 305/694/4432 i o UNIT NAME+ TURKEY POINT UNIT 2i 'REPORTXNG PERIOD+ JANUARY'988 3+,L'ICENSED THERMAL POHER
( MHT) i
'2~88 NAMEPLATE RATING (GROSS MME)+
760
'5, DESIGN ELECTRXCAL RATXNG (NET MWE>;
693 6+ MAXIMUM'EPENDABLECAPACITY (GROSS MME>!
699 7i MAXIMUM,DEPENDABLE CAPACITY (NET. MME)66
'+
IF CHANGES OCCUR XN 'CAF'ACXTY RATINGS (ITEMS 'NUMBER '3 THROUGH 7)
SXNCE LAST REPORT GIVE REASONS:
9+
POWER LEVEL TO HHICH,RESTR1CTEDr XF ANY (NET MHE) f8+.REASONS FOR RESTRICTIONS'F ANY
MONTHLY
-YTD-CUMULATIVE ii, HOURS XN'EPORT F'ERIOD; 12':NUMBER OF 'HOURS REACTOR:HAS CRITICAL i.3+
REACTOR RESERVE SHUTDOHN HOURS 14':HOURS GENERATOR ON-LINE 15i UNIT, RESERVE SHUTDOWN HOURS.
16'ROSS THERMAL ENERGY GENERATED (MHH) 17+
GROSS 'ELECTRICAL ENERGY GERER*TED
( MHH) 18'ET ELECTRICAL ENERGY GENERATED (MHH>
19+.UNXT SERVXCE FACTOR 28 o UNXT AVAXLABIL'XTYFACTOR 21 i CAPACITY. FACTOR
( USING MDC.NET )
.22+
CAPACITY'ACTOR (USING,DER NET)
,23+ 'UNIT FORCED OUTAGE RATE 24+
SHUTDOWNS SCHEDULED OVER NEXT. 6 MONTHS 744 744+8 8i8 744+8 0
1632551 540840 516636 188'i 8 188i8 184+3 188i2 0
744 744o8 8i8 744+8 0
1632551 540840 516636
.188+0 188o8 184i3 188+2 0
117845 i 8
'81427+3 166+6 78631+2 32ti 166396139 53025688 50199348 66o7 66+8 65+4 61+5 11+3 25 i IF SHUT DOWN AT'ND 'OF REPORT 'PERIOD ~
ESTIMATED DATE OF STARTUP!
2/19/88
Ik 0
r~
SUMMARY
OF'OPERATING EXPERIENCE DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 5
6 REPORT MONTH Unit ¹4 operated at essentially full power and,had no "unit shut-downs or significant power reductions."'
41
~I
UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE Date Type'uration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Reports System Code4 Component Codes Cause &Corrective Actionto PreventRecurrence Unit ¹4 had no shutdowns.or signi-ficant power reductions.
F Forced S Scheduled Reason A - Equipment Failure(Explain) 8 - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)
ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG%161)
Exhibit1-Same Source
0 41
RAGE DAILY UNIT PONER LEVEL OOCKET ND.'NIT DATE CONPLETED BY TELEPHONE DAY AVERAGE DAILY PSKR LEVEL (N Qt-Net) 1/ 1/88 1/ 2/88 1/ 3/88 1/ 4/88 1/ 5/88 1/ 6/88 1/ 7/88 1/ 8/88 1/ 9/88 1/10/88 1/11/88 1/12/88 1/13/88 1/14/88 1/15/88 1/16/88 1/17/88
~
1/18/88 1/19/88 1/20/88 1/21/88 1/22/88 1/23/88 1/24/88 1/25/88 1/26/88 1/27/88 1/28/88 1/29/88 1/30/88 1/31/88 865 863 862 864 865 865 864 862 862 864 866
- 866, 851 849 867 867 866 864 861 861 862 862 864 865 864 866 869 871 870 870 868
Oi J ~
OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 335 DATE 2/ 8/88 COMPLETED BY Ni Ho GR*NT TELEPHONE 305/694/4432 1 t UNIT NAME+
ST+ LUCIE UNIT 1 2+
REPORTING PERIOD+
J*NUARY 1988 3+
LICENSED THERMAL PONER (MHT)i 2700 4+
NAMEPLATE RATING (GROSS MME) t 850 5i DESIGN ELECTRICAL RATING (NET MHE) +
830 6o MAXIMUM DEPENDABLE CAPACITY (GROSS MME) o 872 7o MAXXMUM DEPENDABLE CAPACITY (NET MME)t 839 8+ IF CHANGES OCCUR IN CAPACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT~
GIVE REASONS'o POHER LEVEL TO WHICH RESTRICTED'F ANY (NET MHE) 10'E*SONS FOR RESTRICTIONS'F ANY)
MONTHLY
-YTD-CUMULATIVE 11, HOURS IN REPORT PERIOD; 12 NUMBER OF HOURS REACTOR HAS CRITICAL 13i REACTOR RESERVE SHUTDOHN HOURS 14'OURS GENERATOR ON-LXNE 15+
UNIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED '(MHH) 1.7+
GROSS ELECTRIC*L ENERGY GERERATED (MHH) 18m NET ELECTRICAL ENERGY GENERATED (MHH) 19'NXT SERVICE FACTOR 20'NXT AVAXL*BILITYFACTOR Zi+ CAPACITY FACTOR (USING MDC NET) 22'APACITY 'FACTOR (USXNG DER NET) 23'NIT FORCED OUTAGE RATE 24'HUTDOHNS SCHEDULED OVER.NEXT 6 MONTHS 744 e
OiO 744+0 0
2807107 676298 642871 100 i0 100+0 103+0 104ii 0
744 744+0 0+0 744+0 0
2007187 676290 642871 180iO 100iO 103iO 104+1 0
88656 i 0 65316o7 205+3 64899i7 39+3 165226298 54161435 51128694 7342 73+2 72' 70' 4+4 25+
XF SHUT DOHN'T,END OF REPORT PERIODs ESTIMATED DATE OF STARTUP i
0
0 0
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.'NIT DATE COMPLETED BY N.
W. Grant TELEPHONE 305 694-4432 REPORT MONTH Januar 19 Unit 81 operated at essentially full power and had no, "Unit shut-downs or significant power. reductions."
In accordance with requirements of Technical Specifications 6.9. 1.6, there were no chal.lenges to PORV or safety valves during the report month.
0 4l
.r
UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.
50-335 UNITNAME DATE COMPLETED BY W
TELEPHONE Date Duration Type'Hours)
Reason~
Method of Shutting
.Down Reactor Ucensee Event Report¹ System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence Unit ¹1 had no shutdowns or signi-ficant poker reductions, F Forced S Sche'duled 2
Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training 8 Ucense Examination F - Administrative il G - Operational Error(Explain)
H - Other (Explain)
Method 1 - Manual 2-Manual Scram 3 - Automatic Scram 4-Continued 5-Load Reduction
, 9 - Other(Exphin)
ExhibitG-Instructhns forPreparation ofData Entry Scheets Ucensee Event Report(LER) Rle (NUBEG4161)
Exhibit1-Same source
4I II
A RAGE DAILY UNIT POMER LEVEL DOCKET NO.
UNIT DATE 50-389 St.
Lucie Unit 2 CONPLETED BY N.ll. Grant TELEPHONE 305 6
- 432 MONTH DAY
'AVERAGE DAILY POMER LEVEL (I Qe-Net) 1/ 1/88 1/ 2/88 1/ 3/88 1/ 4/88 1/ 5/88 1/ 6/88 1/ 7/88 1/ 8/88 1/ 9/88 1/10/88
~
1/11/88 1/12/88 1/13/88 1/14/88 1'/15/88 1/16/88 1/17/88 1/18/88 1/19/88 1/20/88 1/21/88 1/22/88 1'/23/88 1/24/88 1/25/88 1/26/88 f.'/27/88 1/28/88 1/29/88 1/30/88 1/31/88 864 862 862 863 864 866 866 864 864 867 867 867 867
'867-866 867 867 865 862 863 861 862 864 865 849 830 866 868 868 867 867
0
OPERATXNG STATUS QF'ERATXNG DATA REPORT DOCVET NO 50 389
.DATE 2/ 8/88 COMPLETED BY No W+
GRANT TELEPHONE 305/694/4432 li UNIT NAMEi ST+
LUCXE UNIT 2 2+
REPORTING PERIOD+
JANUARY 1988 3i LICENSED THERM*L POWER (MWT)+
2700 4i NAMEPLATE R*TING (GROSS MWE) t 850 5+
DESIGN ELECTRXCAL RATXNG (NET MWE) +
830 6i MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
882 7+
MAXXMUM DEPENDABLE CAPACITY (NET MWE):
839 8+ IF CHANGES OCCUR XN CAF'ACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT r GIVE REASONS
'+
POWER LEVEL TO WHICH RESTRICTEDr IF ANY (NET MWE)'0'EASONS FOR RESTRICTXONSr XF ANY)
MONTHLY
-YTD-CUMULATIVE li+ HOURS IN REPORT PERIOD:
12+
NUMBER OF HOURS REACTOR WAS CRITICAL 13i REACTOR RESERVE 'SHUTDOWN HOURS 14'OURS GENERATOR ON-LINE 15+
UNXT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED (MWH) 17+
GROSS ELECTRXCAL ENERGY'ERERATKD (MWH) 18+
NET EL'ECTRICAL ENERGY GENERATED (MWH)
UNIT SERVICE FACTOR 28+
UNIT *VAILABILITYFACTOR 21 'AF'ACITY FACTOR (USING MDC NET) 22'*PACITY FACTOR (USING DER NET) 23+
UNIT FORCED OUTAGE RATE 24+
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS o
744 744+8 ewe 744+8 0
2005297 676230 642468 188+8 leeie 102o9 184oe 0
744 744+8 eoe e
0 2885297 676230 642460 ieeoe ieeoe ie2,9 184ie 0
38553ie 26119+6 8 i 8 25571+8 8
66043198 Z2070380 20860064 83+7 83i7 84'+ 0 83+5 8o9 25+
XF SHUT DOWN *T END OF REF'ORT PERIODr ESTIMATED DATE OF STARTUPo
Cl
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-389 St.
REPORT MONTH Januar 1988.
Unit ¹2 operated at essentially full power and had no "Unit shut-downs or significant power reductions."
In accordance with requirements of Technical Specifications 6.9. 1.6, there were no challenges to PORV or safety'alves during the report month.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH.
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE Date Type'uration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Report¹ System Code 4 Component Codes Cause &Corrective Actionto Prevent Recun ence Unit ¹2 had no shutdowns or signi-ficant power reductions.
F Forced S Scheduled Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &LIcense Examination F - Administrative G - Operational Error (Explain)
H -'ther (Explain)
Method 1 - Manual 2-ManualScram 3 - Automatic Scram 4-Continued 5-Load Reduction 9 - Other (Explain)
ExhibitG-Instructions forPreparation ofData EntryScheets Ucensee Event Report(LER) File (NUREG4161)
Exhibit1-Same Source
0 J