Corrected Copy OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 335 DATE 11/16/87 COMPLETED BY Ne Wi GRANT TELEPHONE 305/694/4432 1 ~ UNIT NAMEt ST+
LUCXE UNIT 1 2
REPORTING PERIOD'CTOBER 1987 3o LICENSED THERHAL POWER (MWT)!
2700 4o NAMEPLATE RATING'GROSS MWE)o 856 5o DESIGN ELECTRICAL RATZNG (NET MWE) !
830 6 ~
HAXXHUM DEPENDABLE CAPACITY (GROSS MWE)f 872 7 ~
MAXIMUM DEPENDABLE CAPACITY (NET MWE) !
839 8 o IF CHANGES OCCUR ZN CAPACITY RATINGS
( ITEMS NUHBER 3 THROUGH 7)
SINCE LAST REPORTS GIVE REASONS!
9o POWER LEVEL TO WHICH 'RESTRICTED ~ IF ANY (NET MWE)
'10+
REASONS FOR RESTRICTIONS'F ANY'ONTHLY
-YTD-CUMULATIVE iio HOURS IN REPORT PERIODS 12m NUMBER OF HOURS REACTOR WAS CRITICAL 13+
REACTOR'ESERVE SHUTDOWN HOURS'4
'OURS GENERATOR ON-LXNE 15+
UNIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED (HWH) 17'ROSS ELECTRICAL ENERGY GERERATED (MWH) 18'ET ELECTRICAL ENERGY GENERATED (MWH) 19+
UNIT SERVICE FACTOR 20+
UNIT AVAILABXLITYFACTOR 21'APACXTY FACTOR (USING HDC NET) 22+
CAPACITY FACTOR (USING DER NET)'3+
UNIT 'FORCED OUTAGE RATE 24+
SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS 745 529iO 496+2 0
1286517 429288 403379 66+6 66+6 64o5 65i2
- 33. 0 7296 5513+7 eiO 5359oO 0
14218209'730788 4473394 7305 7315 73+i 73i9 95208+0 70086o4 205 '
69514+6 39'i 3 177437400 58215925 54959217 73oO 73oi 71+9 70i7 25+ IF SHUT DOWN AT END OF REPORT PERIOD~
ESTIMATED DATE OF STARTUP ~
'8802220143 880216 PaR ADOCt< 05000250
- R
,9,CD,
L'g 5 P>e 4
OPERATING STATUS Corrected Copy OPERATING DATA REPORT DOCKET NO 50 389 DATE ii/16/87 COMPLETED BY No Wo GRANT TELEPHONE 305/694/4432 1o UNIT NAME)
ST+
LUCZE UNIT 2 2 t REPORTING PERIOD ~. OCTOBER 1987 3o LICENSED THERMAL POWER (MWT) ~
2700 4i NAMEPLATE RATING (GROSS MWE)t
- 850, So DESXGN ELECTRZCAL RATXNG, (NET MWE)o 830 6+
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)o
.882.
7o MAXIMUM DEPENDABLE CAPACITY (NET MWE) e
'839 So IF CHANGES OCCUR IN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORTS GIVE REASONS!
9o POWER LEVEL TO WHXCH RESTRICTED ~
ZF ANY (NET-MWE) 10 ~
REASONS FOR RESTRICTIONS r IF ANY!
MONTHLY
-YTD-CUMULATIVE 11 ~
HOURS XN REPORT PERIOD!
12 o NUMBER OF HOURS REACTOR WAS CRITICAL 13+
REACTOR RESERVE SHUTDOWN HOURS 14 o HOURS GENERATOR ON-LINE 15 o UNIT RESERVE SHUTDOWN HOURS ibo GROSS THERMAL ENERGY GENERATED (MWH) 17+
GROSS ELECTRXCAL ENERGY GERERATED (MWH) 18'ET ELECTRXCAL ENERGY GENERATED (MWH) 19 o UNIT SERVICE FACTOR 20'NXT AVAILABXLITYFACTOR 2lo CAPACITY fACTOR (USING MDC NET) 22'APACITY FACTOR (USING DER 'NET) 23'NIT FORCED OUTAGE RATE 24m SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 745 48+3 9+8 48+i 0
107404 33340 28652 bo5 bo5 4+6 4ob 0
7296 6536e5 0 '
6432i9 0
17002268 5639620 5339505 88+2 88+2 8?+2 88+2 37105iO 31912'oi 0 '
31260'?
0 81040169 27033770 25557109 84+2 84+2 84iZ 84+ 0
?iO 25'F SHUT DOWN AT END OF REPORT PERIODS ESTIMATED DATE OF STARTUP$ 12/5/87
4l
~I t~