ML17342B178

From kanterella
Jump to navigation Jump to search
Corrected Operating Data Repts for Oct 1987
ML17342B178
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 10/31/1987
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17342B170 List:
References
NUDOCS 8802220143
Download: ML17342B178 (4)


Text

Corrected Copy OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 335 DATE 11/16/87 COMPLETED BY Ne Wi GRANT TELEPHONE 305/694/4432 1 ~ UNIT NAMEt ST+

LUCXE UNIT 1 2

REPORTING PERIOD'CTOBER 1987 3o LICENSED THERHAL POWER (MWT)!

2700 4o NAMEPLATE RATING'GROSS MWE)o 856 5o DESIGN ELECTRICAL RATZNG (NET MWE) !

830 6 ~

HAXXHUM DEPENDABLE CAPACITY (GROSS MWE)f 872 7 ~

MAXIMUM DEPENDABLE CAPACITY (NET MWE) !

839 8 o IF CHANGES OCCUR ZN CAPACITY RATINGS

( ITEMS NUHBER 3 THROUGH 7)

SINCE LAST REPORTS GIVE REASONS!

9o POWER LEVEL TO WHICH 'RESTRICTED ~ IF ANY (NET MWE)

'10+

REASONS FOR RESTRICTIONS'F ANY'ONTHLY

-YTD-CUMULATIVE iio HOURS IN REPORT PERIODS 12m NUMBER OF HOURS REACTOR WAS CRITICAL 13+

REACTOR'ESERVE SHUTDOWN HOURS'4

'OURS GENERATOR ON-LXNE 15+

UNIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED (HWH) 17'ROSS ELECTRICAL ENERGY GERERATED (MWH) 18'ET ELECTRICAL ENERGY GENERATED (MWH) 19+

UNIT SERVICE FACTOR 20+

UNIT AVAILABXLITYFACTOR 21'APACXTY FACTOR (USING HDC NET) 22+

CAPACITY FACTOR (USING DER NET)'3+

UNIT 'FORCED OUTAGE RATE 24+

SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS 745 529iO 496+2 0

1286517 429288 403379 66+6 66+6 64o5 65i2

33. 0 7296 5513+7 eiO 5359oO 0

14218209'730788 4473394 7305 7315 73+i 73i9 95208+0 70086o4 205 '

69514+6 39'i 3 177437400 58215925 54959217 73oO 73oi 71+9 70i7 25+ IF SHUT DOWN AT END OF REPORT PERIOD~

ESTIMATED DATE OF STARTUP ~

'8802220143 880216 PaR ADOCt< 05000250

R

,9,CD,

L'g 5 P>e 4

OPERATING STATUS Corrected Copy OPERATING DATA REPORT DOCKET NO 50 389 DATE ii/16/87 COMPLETED BY No Wo GRANT TELEPHONE 305/694/4432 1o UNIT NAME)

ST+

LUCZE UNIT 2 2 t REPORTING PERIOD ~. OCTOBER 1987 3o LICENSED THERMAL POWER (MWT) ~

2700 4i NAMEPLATE RATING (GROSS MWE)t

850, So DESXGN ELECTRZCAL RATXNG, (NET MWE)o 830 6+

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)o

.882.

7o MAXIMUM DEPENDABLE CAPACITY (NET MWE) e

'839 So IF CHANGES OCCUR IN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORTS GIVE REASONS!

9o POWER LEVEL TO WHXCH RESTRICTED ~

ZF ANY (NET-MWE) 10 ~

REASONS FOR RESTRICTIONS r IF ANY!

MONTHLY

-YTD-CUMULATIVE 11 ~

HOURS XN REPORT PERIOD!

12 o NUMBER OF HOURS REACTOR WAS CRITICAL 13+

REACTOR RESERVE SHUTDOWN HOURS 14 o HOURS GENERATOR ON-LINE 15 o UNIT RESERVE SHUTDOWN HOURS ibo GROSS THERMAL ENERGY GENERATED (MWH) 17+

GROSS ELECTRXCAL ENERGY GERERATED (MWH) 18'ET ELECTRXCAL ENERGY GENERATED (MWH) 19 o UNIT SERVICE FACTOR 20'NXT AVAILABXLITYFACTOR 2lo CAPACITY fACTOR (USING MDC NET) 22'APACITY FACTOR (USING DER 'NET) 23'NIT FORCED OUTAGE RATE 24m SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 745 48+3 9+8 48+i 0

107404 33340 28652 bo5 bo5 4+6 4ob 0

7296 6536e5 0 '

6432i9 0

17002268 5639620 5339505 88+2 88+2 8?+2 88+2 37105iO 31912'oi 0 '

31260'?

0 81040169 27033770 25557109 84+2 84+2 84iZ 84+ 0

?iO 25'F SHUT DOWN AT END OF REPORT PERIODS ESTIMATED DATE OF STARTUP$ 12/5/87

4l

~I t~