ML17342B177

From kanterella
Jump to navigation Jump to search
Corrected Data Operating Repts for Sept 1987
ML17342B177
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 09/30/1987
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17342B170 List:
References
NUDOCS 8802220139
Download: ML17342B177 (4)


Text

Corrected Copy OPERATING DATA REPORT

'DOCVET NO 50 335 DATE 10/15/87 COMPLETED .BY N. Wi GRANT

'EL'EPHONE 305/694/4432.

OPERATING STATUS 1+ UNXT NAME+ 'STi LUCIE 'UNIT 1

2. REPORTXNG PERIOD:SETEMBER 1987 3i LICENSED THERMAL POWER (MWT) o ~700 NAMEPLATE RATXNG (GROSS:MWE)e 850 5i DESIGN ELECTRICAL RATXNG (NET MWE)f 830 "6 i 'MAXIMUM,DEPENDABLE, CAPACITY (GROSS'WE) + 872 7, MAXXMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF 'CHANGES OCCUR IN. CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE, LAST REPORTS GIVE REASONS:

9,0 POWER, LEVEL TO WHICH RESTRICTED~ IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS'r IF .ANY:

MONTHLY - YTD- CUMULATIVE five HOURS IN REPORT PERIOD: 720 6551 94463.0 1'2 o NUMBER OF 'HOURS REACTOR WAS CRITICAL 72000 4983o7 69556.4 130 REACTOR RESERVE SHUTDOWN HOURS 0+0 0+0 205+3

14. HOURS'ENERATOR ON-LINE '720. 0 486207 69018o4
15. UNIT RESERVE. SHUTDOWN HOURS 0 0 3

lb. GROSS THERMAL ENERGY GENERATED (MWH) 1933803 12931'692 1'76 1'50883 17+ GROSS ELECTRICAL ENERGY'ERERATED (MWH) 633310 4301500 57786645

18. NET ELECTRXCAL ENERGY GENERATED (MWH) 600933 4070015 54555838
19. UNXT SERVXCE FACTOR 180.0 0 7402 73+1 28 o UNIT AVAILABILITY.FACTOR .100 0 0 740 2 73ii
i. CAPACXTY FACTOR (USING MDC NET) 99 ' 74+1 72 i'0 22'APACITY FACTOR (USING DER NET) 10006 740 9- 70+7
23. 'UNIT FORCED OUTAGE 0: 1'.1 3+8 SCHEDUL'ED OVER,'EXT 6 MONTHS RATE'HUTDOWNS )

.25. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED .D'ATE OF START'UP:

88022201'29 88021'8

'05000250

.R......:.:

'PDR,' A'DOOk

'DC 9

Al J $ ", W, tf "0 ' """ I, w*,

Corrected Copy OPERATING DATA REPORT DOCVET HO 50 389 DATE 10/15/87 COMF'LETED BY H, H. GRANT TELEPHOHE 305/694/4432 OPERATING STATUS 1 ~ UNIT HAME: ST ~ LUCIE UNIT 2

2. REPORTING F'ERIOD+ SETEMBER 1987 3+ I ICENSED THERMAL POHER (MWT)t ~700 NAMEPLATE RATING (GROSS MME): 850
5. DESIGN ELECTRICAL RATXNG (NET MHE) ' 830 6, MAXIMUM DEPENDABLE CAPACXTY (GROSS MWE):, 882
7. MAXIMUM DEPENDABLE CAPACITY <HET MHE) f 839
8. XF CHANGES OCCUR IN C*F'ACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LA'ST REPORT ~ GIVE REASONS+

9i POHER LEVEL TO WHICH RESTRICTEDr IF AHY <HET MHE)

10. REASONS FOR RESTRICTIONS~ IF ANY'ONTHLY

- YTD- CUMULATIVE 1 1. HOURS IH REPORT PERIOD: 720'20)0 6551 363'60.0

12. NUMBER OF HOURS REACTOR HAS CRXTICAL 6488',2 31863i8 13, REACTOR RESERVE SHUTDOWN HOURS OoO OiO 0.0
14. HOURS GENERATOR ON-LINE 720iO '384i8 31212.6 15'+ UHIT RESERVE SHUTDOWN HOURS 0 0 0 16'ROSS THERMAL ENERGY GENERATED <MHH) 1865652 16894864 80932765
17. GROSS ELECTRICAL ENERGY. GERERATED (MWH) 597 30 5606280 27000430
18. NET ELECTRICAL ENERGY GENERATED (MHH) 564141 5310853 5528457 UNIT SERVICE FACTOR 100iO 97i5 85.8
20. UNIT AVAILABILITYF*CTOR 100 i 97o5 85i8 21+ CAP*CITY FACTOR (USING MDC NET) 0'3' 96i6 85.9
22. CAPACITY FACTOR (USING DER NET) 94 i 4 97+7 85 i 7

.3, UNIT FORCED OUTAGE'ATE 0 2.s l 7'1 l SHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 25+ XF SHUT DOHN. AT EHD OF REPORT PERIOD ~ ESTIMATED D*TE OF STARTUP+

0 4l All:

LI I>>