Corrected Copy OPERATING DATA REPORT OPERATING STATUS
'DOCVET NO 50 335 DATE 10/15/87 COMPLETED.BY N.
Wi GRANT
'EL'EPHONE 305/694/4432.
1+
UNXT NAME+
'STi LUCIE
'UNIT 1
2.
REPORTXNG PERIOD:SETEMBER 1987 3i LICENSED THERMAL POWER (MWT) o
~700 NAMEPLATE RATXNG (GROSS:MWE)e 850 5i DESIGN ELECTRICAL RATXNG (NET MWE)f 830 "6 i 'MAXIMUM,DEPENDABLE, CAPACITY (GROSS'WE)
+
872 7,
MAXXMUM DEPENDABLE CAPACITY (NET MWE):
839
- 8. IF 'CHANGES OCCUR IN. CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE, LAST REPORTS GIVE REASONS:
9,0 POWER, LEVEL TO WHICH RESTRICTED~ IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS'r IF.ANY:
MONTHLY
-YTD-CUMULATIVE five HOURS IN REPORT PERIOD:
1'2 o NUMBER OF 'HOURS REACTOR WAS CRITICAL 130 REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS'ENERATOR ON-LINE 15.
UNIT RESERVE.
SHUTDOWN HOURS lb.
GROSS THERMAL ENERGY GENERATED (MWH) 17+
GROSS ELECTRICAL ENERGY'ERERATED (MWH) 18.
NET ELECTRXCAL ENERGY GENERATED (MWH) 19.
UNXT SERVXCE FACTOR 28 o UNIT AVAILABILITY.FACTOR i.
CAPACXTY FACTOR (USING MDC NET) 22'APACITY FACTOR (USING DER NET)
- 23. 'UNIT FORCED OUTAGE RATE'HUTDOWNS SCHEDUL'ED OVER,'EXT 6 MONTHS 720 72000 0+0
'720. 0 0
1933803 633310 600933 180.0 0
.100 0 0 99 '
10006 0:
6551 4983o7 0+0 486207 0
12931'692 4301500 4070015 7402 740 2 74+1 740 9-1'.1
)
94463.0 69556.4 205+3 69018o4 3
1'76 1'50883 57786645 54555838 73+1 73ii 72 i'0 70+7 3+8
.25. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED.D'ATE OF START'UP:
88022201'29 88021'8
'PDR,'
A'DOOk '05000250
.R......:.:
'DC 9
Al J
", W, tf "0
I, w*,
Corrected Copy OPERATING STATUS OPERATING DATA REPORT DOCVET HO 50 389 DATE 10/15/87 COMF'LETED BY H,
H.
GRANT TELEPHOHE 305/694/4432 1
~
UNIT HAME:
ST ~
LUCIE UNIT 2 2.
REPORTING F'ERIOD+ SETEMBER 1987 3+
I ICENSED THERMAL POHER (MWT)t
~700 NAMEPLATE RATING (GROSS MME):
850 5.
DESIGN ELECTRICAL RATXNG (NET MHE) '
830 6,
MAXIMUM DEPENDABLE CAPACXTY (GROSS MWE):,
882 7.
MAXIMUM DEPENDABLE CAPACITY <HET MHE) f 839 8.
XF CHANGES OCCUR IN C*F'ACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LA'ST REPORT
~
GIVE REASONS+
9i POHER LEVEL TO WHICH RESTRICTEDr IF AHY <HET MHE) 10.
REASONS FOR RESTRICTIONS~ IF ANY'ONTHLY
-YTD-CUMULATIVE 1 1.
HOURS IH REPORT PERIOD:
12.
NUMBER OF HOURS REACTOR HAS CRXTICAL 13, REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS GENERATOR ON-LINE 15'+
UHIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED
<MHH) 17.
GROSS ELECTRICAL ENERGY. GERERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MHH)
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYF*CTOR 21+
CAP*CITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USING DER NET)
.3, UNIT FORCED OUTAGE'ATE SHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 720'20)0 OoO 720iO 0
1865652 597 30 564141 100iO 100 i 0'3' 94 i 4 0
6551 6488',2 OiO
'384i8 0
16894864 5606280 5310853 97i5 97o5 96i6 97+7 2.s l
363'60.0 31863i8 0.0 31212.6 0
80932765 27000430 5528457 85.8 85i8 85.9 85 i 7 7'1 l
25+
XF SHUT DOHN. AT EHD OF REPORT PERIOD ~
ESTIMATED D*TE OF STARTUP+
0 4l All:
LI I>>