ML17342B172
| ML17342B172 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 04/30/1987 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML17342B170 | List: |
| References | |
| NUDOCS 8802220122 | |
| Download: ML17342B172 (4) | |
Text
OPERATXNG STATUS Corrected Copy OPERAT1NG DATA REPORT DOCKET NO 50 335 DATE 5/12/87 COMPLETED BY No Wo GRANT TELEPHONE 305/694/4432 1.
UNXT NAME:
ST ~
LUCXE UNIT 1
REF ORTING PERIOD:
APRIL 1987 3+
LICENSED THERMAL POWER (MWT)o'700 4i NAMEF'LATE RATXNG (GROSS MWE)o 850 5
DESIGN ELECTRICAL RATXNG (NET MWE)'30 6i MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) ~
872 7.
MAXXMlJM DEPENDABLE CAPACITY (NET MWE) i 839 8
XF CHANGES OCCUR XN CAPACXTY RATXNGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT ~
GIVE REASONS:
9i POWER LEVEL TO WHXCH RESTRICTED'F ANY (NET MWE>
iOi REASONS FOR RESTRICTIONS~ IF ANY+,
MONTHLY
-YTD-CUMULATIVE i.ii HOURS XN REPORT PERIOD+
12 o NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14 i HOURS GENERATOR ON-LINE 15, UNXT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GENERATED (MWH) 17, GROSS ELFCTRXCAL ENERGY GERERATED (MWH)
- 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19+
UNXT SERVICE FACTOR 20'NIT AVAXLABXLXTYFACTOR 21.
CAF'ACITY FACTOR (USXNG MDC NET)
+2, CAPAC1TY FACTOR. (USXNG DER NET) 23, UNIT FORCED OUTAGE RATE 24+
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 7-19 431i8 0+0 354i9 0
832420 276860 255319 49i4 49o4 42o3 42o8 0
2879 1320i4 OiO 1243o4 0
3221412 1072660 1004940 43+2 43o2 4io6 42oi I
o I
90791 i0
,65893' 205i3 65399+1 39o3 166440603 54557805 51490763 72' 72' 70+8 69i5 25.
XF SHlJT DOWN AT END OF REPORT PERIOD ~
ESTIMATED DATE OF STARTUP:
- 8802220122 880216
,P.DR,*DOCK, 0.500.0250
- R
..'.....'DCD.,
0 t
C
QPFRATTNG STAT!JS Corrected Copy QPERATXNG DATA'EPORT DOCVET NO 50 389 DATE 5/12/87 COMPLETED BY Ni Ho GRANT TELEPHONE 305/694/4432 io Ul'!:KT NAME:
ST.
LUCXE UNXT 2 F;FPQRTXNG PER:KQD;,
APRXL 1987 3
I T.'CENSED THERMAL PQ~AER (HHT)'700 NAMEPL'ATE RATING (GROSS HWE):
850 5.
DES'KGN EL.ECTRXCAL RATING (NET MME):
830 6o HAXXHIJH DEPENDABLE CAPACITY'GROSS HHE) o 882 7 ~
MA'~~:KHlIH DI:.PEh!DABLE CAP'ACXTY (NET MME) +
839 8.
TF I';HANGES 0!:CLJP XN CAPACITY RATXNGS (XTEMS NUMBER 3 THROUGH 7)
SINfE LAS I REPORT GIVE REASONS'.
POWDER LI=VFL TO
'WHICH RESTRICTED~ IF ANY (NET MME) 10 ~
REASOhjS FOR F<ESTFcICTXQNS ~
XF ANY
'ONTHLY
-YTD-CUM!JLATXVE 1 1 o HOURS XN REPORT PERIOD:
12'IJHBER OF HOURS PEACTOR HAS'RITICAL 13, RFACTOR I'ESERVE SHIJTDQHN HOURS 14 o
HOlJRS GENERATOR QN-LINE 15 UNIT RESERVE SHUTDO'AN 'HOURS 16 'ROSS Tl-IEPHAL ENERGY GENERATED (MHH) 17.
GROSS EL.ECTRICAL ENERGY. GERERATED (MNH) 18, hlET ELECTRICAL ENFRGY GENERATED (MMH) 19.
I Jh/I'1 SERVICE FACTOR 2eo UNIT AVAILABILITYFACTOR 21.
CAPACITY FACTOR (USING MDC NET) 22.
CAPAC:KTY FACTOR
(!JSING DER NET)
,':.3, l,lh!TT FORCED.
OLJTAGE RATE 24.
SHiJTOOWNS SrHEDULED OVER NEXT 6 MONTHS ;,
719 699+3
,OiO 692e7 0
1815961 607870
.575632 96i3 96+3 95o4 96o5 3.7 2879 2828.2 OiO 2808' 0
7467711 2513800 2384166 97i6 97+6
'98o7 99+8 2.4 32688+0 28203i8 OiO 27636+7 0
71505612 23907950'2601'770 84i5 84i5 84+9 84 i 5 25,i
'.!;F SHlJ!
I>Q'4N *T END OF RFPORT PERIOD ~
ESTXHATED DATE OF STARTUP:
0
'1W I
rP'