Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr
ML17241A495
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/30/1999
From: Rogers J, Staff J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, L-99-220, NUDOCS 9910210115
Download: ML17241A495 (10)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET ¹ FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power S Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATXON Florida Power E Light Co.

'OGER,J.A.

STAFF,J.A. Florida Power 8 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl crating repts for Sept 1999 for St Lucie,Units 1

.With 991014 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR EiVCL ID CODE/NAME LTTR ENCL GLEAVES,W 1 INTERNAL: ACRS 1 LE CENTER Ol 1 1 OC/DBA/PAD 1 1 DRAA OERAB 1 1 RGN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 'BOA C NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OE COPIES REQUIRED: LTTR 9 ENCL 9

Florida Power 5 Light Company. 6351 S. Ocean Drive, Jensen Beach, FL34957 October 14, 1999 L-99-220 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the September 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/grm Attachments cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant 99i02iOii5 990930 PDR ADGCK 05000335-"

R PDR an FPL Group company

l d M W K h > 4 lI

'tl

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: Oct. 4, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ~MP 1999 Unit 1 operated at essentially full power through September 11. On September 12, the unit downpowered to approximately 68% power for main steam safety valve testing. The unit then commenced further downpowering for refueling. On September 13, the unit was removed from service at 0001 for refueling. Hurricane Floyd preparations and recovery preempted the refueling outage work for five days. On Septmeber 18, at 0001, the unit entered refueling outage status.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

DOCKET NO 50 - 335 UNIT NAME ST. LUCIE UNIT 1 DATE October 4, 1999 COMPLETED BY J. A. ROGERS TELEPHONE (561) 467-7296 REPORTING PERIOD: SEPTZMBER 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUM3IA11VE
3. Number of Hours Reactor Critical 288 6048.5 158018
4. Number of Hours Generator On Line 288 6034.3 156368
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (hPÃH) 235714 5093481 127014019

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Pl DATE: Oct.4, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 RHPORTMONTH~Sb 1999 Number Date Type'uration Reason' Method of & Corrective (Hours) Reactor'ause Shutting Down Action to Prevent Recurrence 9/12/99 Unit 1 downpowered to perform Main Steam Safety Valve 0.0 Testing.

9/13/99 0.0 Unit 1 downpowered for refueling and maintenance.

9/13/99 120.0 Unit 1 oNine due to Hurricane Floyd.

9/18/99 312.0 Unit I ofHine for refueling and maintenance.

1 2 F Forced Reason Method S Scheduled A - Equipment failure (explain) 1- Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training 8c License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091M1 re@

SU ARY OF OPERATING EXPKRIK DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: Oct. 4, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 t

REPORT MOII ~Sb Unit 2 operated at essentially full power through September 13. On September 14, the unit downpowered to approximately 33% power due to Hurricane Floyd. On September 14, the unit returned to full power by end of day.

Unit 2 operated at essentially full power for the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE October 4, 1999 COMPLETED BY J. A. ROGERS TELEPHONE (561) 467-7296 REPORTING PERIOD: SEPTEMBER 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATlVB
3. Number of Hours Reactor Critical 720 6383.6 121683.3
4. Number of Hours Generator On Line 720 6374.7 120025.4
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (hPiVH) 602169 5324124 98329968

UNIT SHVIDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: Oct.4, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 llaPDRT MONTH s~bl999 Method of Shutting & Corrective Number Date Duration (Hours)

Reason Reactor'ause Down Action to Prevent Recurrence 9/14/99 0.0 H Unit 2 downpowered due to Hurricane Floyd.

1 2 F Forced Reason Method S Scheduled A - Equipment failure (explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training &, License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091587 Epl