ML17229B046

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr
ML17229B046
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/28/1999
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-061, L-99-61, NUDOCS 9903170219
Download: ML17229B046 (11)


Text

CATEGORY 1 REGULAT rcY INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9903170219 DOC.DATE: 99/02/28 NOTARIZED: NO DOCKET FACIL:5Q-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335

.. 50~389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH.NAYIiE'UTHORAFFILIATION ROGERS,Q'.A. Florida Power &, Light Co.

STAL'L,J.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Feb 1999 for St Lucie,Units 1 &

2.With 990310 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL .ID CODE/NAME LTTR ENCL 0 PD2-3 PD .1 1 GLEAVES,W 1 1 R

INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC NRC PDR 1 1 "C

in<%Kms NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON 'EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Florida Power 5 Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 March 10, 1999 L-99-061 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the February 1999 Operating Data Reports, Summary of Operating Experience Reports,

/

and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours,

. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant 9903i702i9 9'70228 <

PDR ADOCK 05000335 !'

l PDR an FPL Group company

4 ~

L J

K

DOCKET NO 50 - 335 UNIT NAME ST. LUCIE UNIT 1 DATE 03/04/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: FEBRUARY 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 672 1416 153385.5
4. Number of Hours Generator On Line 672 1416 151749.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 571026 1211475 123132013

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: Mar. 4, 1999 COMPLETED BY: J.A.ROGERS .

TELEPHONE: (561) 467-7296 SEPORTMONTH Unit 1 operated at essentially full power for the entire month of February.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: Mar. 4, 1999 COMPLETED BY J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Februarv 1999 Number Date Type Duration Reason Method of Cause & Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit l operated at essentially full power for the entire month of February.

1 2 F Forced Reason Method A - Equipment S Scheduled

- MaintenanceFailure (Explain) 1 Manual B

C - Refueling or Test 2 Manual Scram 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Exes.nation 5 - Load Reduction F - Administrative 9 Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091587 1PL

I pl

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 03/04/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTlNG PERIOD: FEBRUARY 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 672 1416 116715.7
4. Number of Hours Generator On Line 672 1416 115066.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 569842 1207536 94213380

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie 82 DATE: Mar. 4, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 BE P OR T MD N TH ~

Unit 2 operated at essentially full power for the entire month of February.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie N2 DATE: Mar. 4, 1999 COMPLETED BY J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Februarv 1999 Number Date TYPe Reason Method of Cause 6 Corrective 1 Duration 2 Shutting Action to (Hours) Down Prevent Recurrence Reactor3 Unit 2 operated at essentially full popover for the entire month of February.

1 2 3 F Forced Reason Method

- 1 - Manual S Scheduled A

- MaintenanceFailure Equipment tExplain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training a License Examination 5 Load Reduction F - Administrative 9 - Other tExplain)

G - Operational Error tExplain)

H - Other tExplain) 091ddd FN

y, a C wQ l%