ML17342B176
| ML17342B176 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 08/31/1987 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17342B170 | List: |
| References | |
| NUDOCS 8802220133 | |
| Download: ML17342B176 (3) | |
Text
OPERATING STATUS'orrected Copy
'PERATING DATA REF'ORT DOCKET NO 50
'35'ATE 9/14/87 COMPLETED BY N+
Wo GRANT TELEPHONE 305/694/4432 1+
UNIT. NAME+
ST+ LUCIE'NIT 1 2,
REPORTXNG PERIOD:
AUGUST 1987 3i
. LICENSED THERMAL POWER, (HWT) o
~700 4.
NAHEPLA'TE RATING
( GROSS MWE):
850 5 i DESXGN ELECTRICAL RATING
( NET'WE):o 830.
6.o MAXIMUM'.DEF,'ENDABLE CAF'ACZTY
( GROSS MWE) o 872',
.HAXXHUH DEPENDABLE CAPACITY (NET HWE);
839'i IF CHANGES OCCUR ZN CAPACITY RATINGS (ZTEHS NUMBER 3 THROUGH 7.)
,SXNCE LAST REPORT r GIVE REASONS!
9,,
POWER LEVEL TO 'WHICH RESTRICTED~ IF ANY (NET MWE)'0m REASONS FOR RESTRICTIONS'F
'ANY'ONTHLY
-YTD-CUMULATIVE 1 1, HOURS IN REPORT 'PERIOD
,'2,
.NUMBER OF HOURS REACTOR WAS CRXTICAL f.'3i REACTOR RESERVE SHUTDOWN HOURS 14i HOURS GENERATOR ON-LINE 15'UNIT:RESERVE SHUTDOWN 'HOURS 1'6i GROSS THERMAL ENERGY GENERATED (HWH) 17, GROSS ELECTRICAL ENERGY'ERERATED (HWH) 18'ET ELECTRICAL ENERGY GENERATED '(HWH)
.19 o UNIT'ERVICE FACTOR, 20 UNIT'VAILABILXTYFACTOR 21.
CAPACITY FACTOR (USING HDC NET) 22.
CAF'.ACITY. FACTOR (USXNG DER NET) 23'NIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 744iO OiO 744oO 0
2004'433 663520 630092 100i0 100iO 100 '
102+0
~
0'831 4263i7 OiO 4142o7 0
10998689 3668190 3469082 7ioO 71iO 70i9 71o7 93743 i0 68836+4 205+3 68298+4 39+3 174217880, 57153335 53954905 72o9 72i9 7ii8 70 o'5 3i8'5'F,
'SHUT DOWN AT END OF 'REPORT.PERIODS ESTXMATED DATE OF STARTUP'802220133,:8802lg
'BR
- DOCK 05000250 tj I
.R,
>DCD
lI4 r>
OPERATING STATUS Corrected Copy OPERATING DATA REPORT DOCV(ET NO 50 389 DATE 9/14/87 COMPLETED BY No Wo GRANT TELEPHONE 305/694/4432 ii UNIT NAME:"
STi LUCXE UNXT 2 2,
REPORTING PERXOD:
AUGUST 1987 3,
LXCENSED THERMAL POWER
<MWT):
2700 4
o NAMEPLA'TE RATING (GROSS MWE) e 850 5i DESIGN El ECTRICAL RATING (NET MWE) $
830 6i MAXIMUM DEPENDABLE CAPACITY <GROSS MWE) i 882 7.
MAXIMUM DEPENDABLE CAPACITY
< NET MWE) o 839 8+ IF CHANGES OCCUR ZN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT
~
GIVE REASONS+
9o POWER LEVEL TO WHICH RESTRICTED ~ IF ANY (NET MWE) 10'EASONS FOR RESTRICTIONS'~
ZF ANY'ONTHLY
-YTD-CUMULATIVE 1 1, HOURS IN REPORT PERIOD:
12m NUMBER OF HOURS REACTOR WAS CRITICAL 13'EACTOR RESERVE SHUTDOWN HOURS 14 o HOURS GENERATOR ON-LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED
<MWH) 17'ROSS ELECTRICAL ENERGY GERERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED.
( MWH) 19 o UNIT SERVICE FACTOR 20'NIT AVAILABILITYFACTOR 21'APACITY FACTOR (USING MDC NET) 22'APACITY FACTOR (USING DER NET) 23 o UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING 10/3/87 z
63 DAYS 744'44' OoO 744'i 0 0
1995468 651880 617886 100iO 100iO 99,+0 100ii 0
5831 5768i2 OoO 5664o8.
0 15029212 5009050 4746712 97ii 97+1 97+0 98ii 35640iO 31143i8 OiO
'30492 '
0 79067113 26403200 24964316 85i6 85+6 85+8 85 '
z.z i 25 IF SHUT DOWN *T END OF REPORT PERIOD i ESTIMATED DATE OF STARTUP:
I