ML17229A729

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr
ML17229A729
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/30/1998
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-129, NUDOCS 9805210323
Download: ML17229A729 (9)


Text

CATEGORY 1 REGULATO INFORMATION DXSTRIBUTIO STEM (RIDS)

ACCESSION NBR:9805210323 DOC.DATE: 98/04/30 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power &. Light Co.

DOCKET 05000335 I

50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILXATXON ROGERS,J.A. Florida Power & Light Co.

STALL,J.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1998 for St Lucie,Units 1 &,

2.W/980512 ltr. A i DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

G RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 GLEAVES,W 1 1 R

INTERNAL: ACR 1 1 AEOD/SPD/RRAB 1 1 ILE CE~ 1 1 OC/DBA/PAD 1 1 Y RGN2 1 1 EXTERNAL: LITCO BRYCE,J H NOAC 1 '1 NRC PDR D

0 C

U E

NOTE TO ALL "RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

0 '

I

~

~

'Il I

Florida Powers Light Company,6351 S. Ocean Drive, Jensen Beach, FL34957 May 12, 1998

%PI L-98-129 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Month~peratingdb:port Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the April 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 980Mi0323 980480 PDR ADOCK 05000335 R PDR an FPL Group company

DOCKET NO 50 - 335 DATE,,

UNIT NAME COMPLETED BY ST. LUCIE UNIT 1 05/07/98 J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: APRIL 1998

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 719 2562.2 146088.5
4. Number of Hours Generator On Line 719 2512.5 144452.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 650620 2090663 116975722

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 May 7, 1998 DATE'OMPLETED J.A.ROGERS BY'ELEPHONE:

(561) 467-7296 REPORT MONTH April 1998 Unit 1 operated at essentially full power for the entire month of April.

In accordance with the requirements of Technical Specification 6.9.1.6,-

there were no challenges to the power operated relief valves or the safety valves during the report period.

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie 01 DATE: May 7, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH April 1998 Number Date Type Duration Reason Method of Cause E Corrective (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor>

Unit 1 operand at essentially full popover for thc cntirc month of A ril.

1 2 3 F Forced Reason Hethod A - Equipment'Failure l - Hanual S Scheduled B - Haintenance or Test(Explain) 2 - Hanual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operato'r Training a License Examination 5 - Load Reduction F - AdMnistrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091589 EP1

DOCKET NO 50 - 389 UNIT NARK ST. LUCIE UNIT 2

DATE, COMPLETED BY 05/07/98 J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: APRIL 1998
1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE 3.'umber of Hours Reactor Critical 719 2879 110120.5
4. Number of Hours Generator On Line 719 2849.9 108490.5
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (hSVH) 648710 2455262 88721655

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie 02 DATE May 7, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: . (561) 467-7296 REPORT MONTH April 1998 Unit 2 operated at essentially full power for the entire month of April.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie 02 DATE May 7, 1998 COMPLETED BY: Jr A. ROGERS TELEPHONE: (561) 4 67-7296 REPORT MONTH April 1998 Number Date Duration Reason Method of Cause tx Corrective Targe (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit 2 operated at essentially full power for the entire month of A ril.

1 F Forced Reason Method A - Equipment l Manual S Scheduled

- MaintenanceFailure tExplain) 2 - Manual Scram B

C - Refueling or Test 3 Automatic Scram n - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other tExplain) 091589 rpr