ML17342B180
| ML17342B180 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 12/31/1987 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17342B170 | List: |
| References | |
| NUDOCS 8802220147 | |
| Download: ML17342B180 (4) | |
Text
Corrected Copy OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 335 DATE 1/12/88 COMPLETED BY Ne Wo GRANT TELEPHONE 305/694/4432 1
UNXT NAME'T LUCIE UNXT 1
2 i REPORTING PERIOD+ DECEMBER 1987 3i LICENSED THERMAL POWER (MWT) i 2700 4
o NAMEPL'ATE RATING (GROSS MWE) i 850 5,
DESXGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUM DEF'ENDABLE CAPACITY (GROSS MWE):
872 7o MAXIMUM DEPENDABLE CAPACITY (NET MWE) o 839 8+ IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SXNCE LAST REPORT~
GXVE REASONS'i POWER LEVEL TO WHXCH RESTRICTED~ IF ANY (NET MWE) 10'EASONS FOR RESTRICTIONS'F ANY+
MONTHLY
-YTD-CUMULATXVE five 12'3.
15 t 16'7+
iso 19
'0
'1'2.
23'4.
HOURS XN REPORT PERIOD'UMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON-LXNE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)
GROSS ELECTRICAL ENERGY GERERATED (MWH)
NET ELECTRICAL ENERGY GENERATED
( MWH)
UNIT SERVICE FACTOR UNXT AVAILABXLXTYFACTOR CAPACITY FACTOR (USXNG MDC NET)
CAF'ACITY FACTOR (USING DER NET)
UNIT FORCED OUTAGE RATE SHUTDOWNS, SCHEDULED OVER NEXT 6 MONTHS o
744 738ii OiO 735t3 0
1973080 660520 627235 98os 98o8 100o5 10ii6 1 o2.
8760 6971is OiO 6814o3 0
18128479 6038440 5715344 77' 77' 77' 78 4.3 96672iO 71544i4 205i3 70969o9 39.3 181347670 59523585 56~01167 73+4 73
2.4 71+2 s.e 25'F SHUT DOWN AT END OF REPORT PERIOD~
ESTIMATED DATE OF STARTUPi
(
SSO222O14i 880216
'PDR
.ADOCK 05000250 R
.,DCD
41 0
r I
k F
Corrected Copy OPERATXNG STATUS OPERATING DATA REPORT DOC):ET NO 50 389 DATE 1/12/88 COMPLETED BY N4 W4 GRANT TELEPHONE 305/694/4432
- l. UNIT NAMEi STi LUCIE UNXT 2 2,
REPORTING PERXOD: DECEMBER 1987 3o LICENSED THERMAL POWER (MWT) i 2700 4+
NAMEPLATE RATING (GROSS MWE) 4 850 5.
DESXGN ELECTRICAL RATING (NET MWE) i 830 6+
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)e 882 7
MAXIMUM DEPENDABLE CAPACXTY (NET MWE) '
839 84 IF CHANGES OCCUR XN CAPACITY RATINGS ('TEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT
~
GIVE REASONS f POWER LEVEL TO WHICH'ESTRICTED~
XF ANY (NET MWE) 10,,
REASONS FOR RESTRICTIONS~
XF ANY:
MONTHLY
-YTD-CUMULATIVE 1 1 4 HOURS XN REPORT PERIOD t 12+
NUMBER OF HOURS REACTOR WAS CRITICAL 13+
REACTOR RESERVE, SHUTDOWN HOURS 14.
HOURS GENERATOR ON-LXNE 15'NIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GERERATED (MWH) 18.
NET El ECTRICAL ENERGY GENERATED
<MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21+
CAPACITY FACTOR
<USING MDC NET) 224 CAPACITY FACTOR (USXNG DER NET) 23, UNIT FORCED OUTAGE RATE 244 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 74145 0+0 731+9 0
1912453 642280 608674 9844 9844 9745 9846 146 8760 738244 040 720948 0
18958739 6294510 5950184 8243 8243 81+0 8148 4.1 38569 4 0 3275840 0 '
3203746
'0 82996640 27688660 26167788 83 i 1 8341 8249 82+7 25+ IF SHUT DOWN *T END OF REPORT PERIOD ~
ESTIMATED DATE OF STARTUP i
~I 41 t
(