ML17342B180

From kanterella
Jump to navigation Jump to search
Corrected Operating Data Repts for Dec 1987
ML17342B180
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 12/31/1987
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17342B170 List:
References
NUDOCS 8802220147
Download: ML17342B180 (4)


Text

Corrected Copy OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 335 DATE 1/12/88 COMPLETED BY Ne Wo GRANT TELEPHONE 305/694/4432 1

UNXT NAME'T LUCIE UNXT 1

2 i REPORTING PERIOD+ DECEMBER 1987 3i LICENSED THERMAL POWER (MWT) i 2700 4

o NAMEPL'ATE RATING (GROSS MWE) i 850 5,

DESXGN ELECTRICAL RATING (NET MWE):

830 6.

MAXIMUM DEF'ENDABLE CAPACITY (GROSS MWE):

872 7o MAXIMUM DEPENDABLE CAPACITY (NET MWE) o 839 8+ IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SXNCE LAST REPORT~

GXVE REASONS'i POWER LEVEL TO WHXCH RESTRICTED~ IF ANY (NET MWE) 10'EASONS FOR RESTRICTIONS'F ANY+

MONTHLY

-YTD-CUMULATXVE five 12'3.

15 t 16'7+

iso 19

'0

'1'2.

23'4.

HOURS XN REPORT PERIOD'UMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON-LXNE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

GROSS ELECTRICAL ENERGY GERERATED (MWH)

NET ELECTRICAL ENERGY GENERATED

( MWH)

UNIT SERVICE FACTOR UNXT AVAILABXLXTYFACTOR CAPACITY FACTOR (USXNG MDC NET)

CAF'ACITY FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE SHUTDOWNS, SCHEDULED OVER NEXT 6 MONTHS o

744 738ii OiO 735t3 0

1973080 660520 627235 98os 98o8 100o5 10ii6 1 o2.

8760 6971is OiO 6814o3 0

18128479 6038440 5715344 77' 77' 77' 78 4.3 96672iO 71544i4 205i3 70969o9 39.3 181347670 59523585 56~01167 73+4 73

2.4 71+2 s.e 25'F SHUT DOWN AT END OF REPORT PERIOD~

ESTIMATED DATE OF STARTUPi

(

SSO222O14i 880216

'PDR

.ADOCK 05000250 R

.,DCD

41 0

r I

k F

Corrected Copy OPERATXNG STATUS OPERATING DATA REPORT DOC):ET NO 50 389 DATE 1/12/88 COMPLETED BY N4 W4 GRANT TELEPHONE 305/694/4432

l. UNIT NAMEi STi LUCIE UNXT 2 2,

REPORTING PERXOD: DECEMBER 1987 3o LICENSED THERMAL POWER (MWT) i 2700 4+

NAMEPLATE RATING (GROSS MWE) 4 850 5.

DESXGN ELECTRICAL RATING (NET MWE) i 830 6+

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)e 882 7

MAXIMUM DEPENDABLE CAPACXTY (NET MWE) '

839 84 IF CHANGES OCCUR XN CAPACITY RATINGS ('TEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT

~

GIVE REASONS f POWER LEVEL TO WHICH'ESTRICTED~

XF ANY (NET MWE) 10,,

REASONS FOR RESTRICTIONS~

XF ANY:

MONTHLY

-YTD-CUMULATIVE 1 1 4 HOURS XN REPORT PERIOD t 12+

NUMBER OF HOURS REACTOR WAS CRITICAL 13+

REACTOR RESERVE, SHUTDOWN HOURS 14.

HOURS GENERATOR ON-LXNE 15'NIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GENERATED (MWH) 17.

GROSS ELECTRICAL ENERGY GERERATED (MWH) 18.

NET El ECTRICAL ENERGY GENERATED

<MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 21+

CAPACITY FACTOR

<USING MDC NET) 224 CAPACITY FACTOR (USXNG DER NET) 23, UNIT FORCED OUTAGE RATE 244 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 74145 0+0 731+9 0

1912453 642280 608674 9844 9844 9745 9846 146 8760 738244 040 720948 0

18958739 6294510 5950184 8243 8243 81+0 8148 4.1 38569 4 0 3275840 0 '

3203746

'0 82996640 27688660 26167788 83 i 1 8341 8249 82+7 25+ IF SHUT DOWN *T END OF REPORT PERIOD ~

ESTIMATED DATE OF STARTUP i

~I 41 t

(