ML17342B173
| ML17342B173 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 05/31/1987 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17342B170 | List: |
| References | |
| NUDOCS 8802220125 | |
| Download: ML17342B173 (4) | |
Text
OPERATING STATUS Corrected Copy OPERATING DATA REPORT DOCYET NO 50 335 DATE 6/11/87 COMPLETED BY'o Wo GRANT TELEPHONE 305/694/4432 1 o UNIT NAME+
ST o LUCXE UNIT 1
2+
REPORTING PERIOD o MAY 1987 3.
LICENSED THERMAL PONER
<MHT>:
2700 NAMEPLATE RATING <GROSS MME> o 850 5i DESIGN ELECTRICAL RATING (NET MME> t 830 bi MAXIMUM DEPENDABLE CAPACITY <GROSS MME> o 872 7
MAXIMUM DEPENDABLE CAPACITY (NET MME>:
839 Si XF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SXNCE'AST REPORT~
GIVE REASONS!
POWER LEVEL TO WHICH RESTRICTED~ XF'NY (NET MME) 10'EASONS FOR RESTRICTIONS'F ANY'ONTHLY
-YTD-CUMULATXVE 1'1 HOURS IN 'REPORT PERXOD'2 NUMBER'F HOURS REACTOR WAS CRXTXCAL 13'EACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LXNE 15'NIT RESERVE SHUTDOHN HOURS 16'ROSS THERMAL ENERGY GENERATED
<MHH) 17'ROSS ELECTRICAL ENERGY GERERATED
<MNH) 18'ET ELECTRXCAL ENERGY GENERATED (MHH>
19'NIT SERVICE FACTOR 20.
UNIT AVAXLABXLXTYFACTOR 21, CAPACITY FACTOR'USING MDC NET) 22'APACITY FACTOR (USXNG DER NET) 23+
UNIT FORCED OUTAGE RATE
.4, SHUTDOVNS SCHEDULED OVER NEXT 6 MONTHS :
744 739'i 1 OoO 71ii2 0
1891173 634380 601558 95i6 95i6 96 '
97+4 4+4 3623 2059+5 OoO 1954 i 7 0
5112585 1707040 1606498 54iO 54iO 52i9 53i4 1.7 91535 i 0 66632+2.
205+3 66110o4 39i3 168331776 55192185 52092321 72o2 721iO 69i7 3.9 25.
XF SHUT DOHN AT END OF REPORT PERIODS ESTXMATED DATE OF STARTUP:
8802220125 880216 PDR ADOCK 05000250, R
.....DCD
41 I'
'f
OPERATING STATUS Corrected Copy OPERATING DATA REPORT DOCKET NO 50 389 DATE 6/ii/87
" COMPLETED BY
'No Ho GRANT TELEPHONE 305/694/4432 li UNIT NAME+
STi LUCXE UNIT 2 2 o REPORTING PERIODo, MAY 1987 3i LICENSED THERMAL POWER (MWT) +
~700 4o NAMEPLATE RATXNG (GROSS MHE)+
850 5.
DESXGN ELECTRICAL RATXNG (NET MHE) i 830 6,
MAXIMUM DEPENDABLE CAPACXTY (GROSS MME):
882 7.
MAXIMUM DEPENDABLE CAPACXTY (NET MHE) o 839 Be XF CHANGES OCCUS IN CAPACITY RATXNGS '(XTEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT ~
GXVE REASONS!
9i POHER LEVEL TO HHICH RESTRICTED ~ IF ANY (NET MME) 10'EASONS'FOR'RESTRICTIONSr XF ANY'ONTHLY
-YTD-CUMULATIVE iio HOURS IN REPORT PERIOD!
12 o NUMBER OF HOURS REACTOR HAS CRXTICAL 13+
REACTOR RESERVE SHUTDOHN HOURS 14'OURS GENERATOR ON-LXNE 15, UNIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED (MHH) 17.
GROSS ELECTRICAL ENERGY GERERATED'MHH) 18'ET ELECTRICAL ENERGY GENERATED (MHH) 19 o
UNIT SERVICE FACTOR
- 20. -UNIT AVAILABILITYFACTOR 21'APACITY, FACTOR (USXNG MDC NET) 22'APACITY FACTOR (USING DER NET) 23'NIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING 10/17/87~
63.DAYS 744 731i9 0+0 724i4 0
1945723 647920 614255 97 i4 97 i 4 98+4 99+5 2o6 3623 3560o2 OoO 3533t3 0
9413434 3161720 2998421 97+5 97i5 98o6 99o7 2.5 33432iO 28935i8 0 ~ 0 2836ioi 0
73451335 24555870 23216025 84i8 84+8 85+2 84+8 25'F, SHUT DOWN AT END OF REPORT PERIOD~
ESTIMATED DATE OF STARTUP"
0 t
V t
, 4