ML17342B181
| ML17342B181 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, 05000000 |
| Issue date: | 09/30/1987 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17342B170 | List: |
| References | |
| NUDOCS 8802220150 | |
| Download: ML17342B181 (2) | |
Text
OPERATING STATUS OPERATING DATA REPORT DOCVET HO 50 250 DATE 10/15/87 COMPLETED BY N.
W.
GRANT TELEPHONE 305/694/4432 1 t UHIT NAME ~
TURl'(EY POIHT UHXT 3 REPORTING PERIOD l SETEMBER 1987
'3+
LXCENSED THFRMAL POWER (MWT)t 2200 NAMEPLATE RATING (GROSS MWE):
760 5.
DESIGN'LECTRXCAL'ATXNG (NET MWE) f '93 6.
MAXXMUM DEPENDABLE CAPACITY (GROSS MWE)".
699.
7.
MAXIMUM DEPENDABLE CAF'ACITY (NET MWE) t 666 8 o XF CHANGES OCCUR IN CAF'ACITY RATXNGS
< ITEMS NUMBER 3 THROUGH 7)
SIHCE LAST REPORT r GIVE REASOHS
'+
POWER LEVEL TO WHICH RESTRICTED'F AHY (NET MWE) 10'EASONS
'FOR RESTRICTIONS,~
XF ANY'ONTHLY
-YTD-CUMULATIVE 11 i HOURS IN REPORT PERIOD:
12'UMBER OF HOURS REACTOR WAS CRITICAL 13i REACTOR RESERVE SHUTDOWN HOURS 14 i HOURS GENERATOR ON-LINE 15m UNIT RESERVE SHUTDOWN HOURS lb.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GERERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR Zing CAPACITY FACTOR (USING MDC NET) 22'APACITY FACTOR
<USING DER NET) 23'NIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 319o4 OiO 100iO 0
69494 1'7500 1919 13' 13i9 Oo4 Oi4 69.4 6551 1747o4 OiO 1426i5 0
2831092 928210 844443 21i8 21 i8 19' 18i6 129920+6 87813 '
844o4 86693o9 121+8 179676499 57563061 54467083 66i7 66.8 64+3 60' 25+
XF SHUT DOWN AT END OF REPORT PERIOD ~
ESTIMATED DATE OF STARTUP o 10/27/87 j,
'8502220150 880216 PVR AZOCK O5OOO25O R-'CD
0
'(
1'