ML17342B179

From kanterella
Jump to navigation Jump to search
Corrected Operating Data Repts for Nov 1987
ML17342B179
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 11/30/1987
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17342B170 List:
References
NUDOCS 8802220145
Download: ML17342B179 (4)


Text

Corrected Copy OF'ERATXNG DATA REPORT OPERATXNG STATUS DOCI<ET NO 50 335 DATE 12/14/87 COMF'LETED BY N,

W.

GRANT TELEF'HONE 305/694/4432 1.

UNIT NAME:

ST.

LUCXE UNXT 1

2.

REPORTING PERXQD:NOVEMBER 1987 3 t LICENSED THERMAL POWER

( MWT):

2700 4t NAMEPlATE RATING (GROSS MWE)t 850 5

DESXGN ELECTRICAL RATXNG (NET MWE)'30 h.

'MAXIMUM DFPENDABLE CAPACITY <GROSS MWE) t 872 7.

MAXXMUM DEPENDABLE CAF'ACXTY (NET MWE)t'39

8. IF CHANGES OCCUR IN C*F'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT

~

GXVE RE*SONS:

POWER LEVEL TQ WHICH RESTRICTED~

XF ANY. (NET MWE) 10t RE*SONS FOR RESTRXCTIONSD XF ANY:

MONTHLY

-YTD-CUMULATIVE 1 1.

HOURS IN REPORT PERIOD l.

12.

NUMBER OF HOURS'EACTOR WAS CRITICAL 13t REACTOR RESERVE SHUTDOWN HOURS i4.

HOURS GENFRATQR ON-LINE 15, UNIT RESERVE SHUTDOWN HOURS 1'6.

GROSS THERMAL ENERGY, GENERATED (MWH) 17.

GROSS ELECTRICAL ENERGY GERERATED

.(MWH) 18.

NET ELECTRICAL ENERGY GENERATED (MWH) 19.

UNXT SERVICE. FACTOR 20, UNXT AVAXLABIL'XTYFACTOR 21t CAPACITY FACTOR (USING MDC,NET) 2.

CAPACXTY F*CTOR

<USXNG DER NET) 23.

UNIT FORCED OUTAGE RATE'4.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 e

0 OtO 728.0 0

1937190 647140

'14715 100tO 100tO 10it8 102t9 0

8016 6233t7 0.0 6079tO 0

16155399 53?7920 5088109 75.8 75t8 75t7 76.5 4.7 95928tO 70806.4 20~t3 70234t6 39t3 179374 90 58863065 55573932 73.2 73t3 72t2 70t9 I

40 I

25. IF SHUT DOWN AT END OF REPORT PERIOD~

ESTIMATED DATE OF STARTUP:

'8802220,145 880216'DR ADOCK 05000250 R

DCD

1l hl

OPERATXNG STATUS Corrected CopV OPERATING DATA REPORT DOCVET NO 50 389 DATE 12/14/87 COMPLETED BY N'.

W.

GRANT TELEPHONE 305/694/4432 io UNIT NAME:

STi LUCIE UNIT 2 REPORTXNG PERTOD:NOVEMBER 1987 3.

LICENSED THERMAL POWER (MWT)o

~700 NAMEPLATE RATXNG <GROSS MWE) ~

850 5.

DESIGN FLECTRXCAL RATING (NET MWE):

830 6.

MAXXMUM DEPENDABLE CAPACITY (GROSS MWE)o 882 7.

MAXXMUM DEPENDABLE CAPACITY <NET MWE)e 839

8. IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT~

GIVE REASONS',

POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE) 10m REASONS FOR RESTRICTIONS'F ANY+

MONTHLY

-YTD-CUMULATIVE 11.

HOURS XN REPORT PERIODS 12.

NUMBER OF HOURS REACTOR WAS CRITICAL 13.

REACTOR RESERVE SHUTDOWN HOURS 14m HOURS GENERATOR ON-LINE 15+

UNIT RESERVE SHUTDOWN HOURS lb.

GROSS THERMAL ENERGY GENERATED (MWH) 17.

GROSS ELECTRICAL ENERGY GERERATED (MWH) 18.

NET ELECTRXCAI ENERGY GENERATED (MWH) 19.

UNXT SERVICE FACTOR 20.

UNXT AVAXLABXLXTYFACTOR 21.

CAPACITY FACTOR (USXNG MDC NET) 22'*PACXTY FACTOR (USING DER NET)

3.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 104+4 OiO 44+9 0

44019 12610 "2005 6+2 6+2 Oi3 Oi3

.74. 3 8016 6640+9 OiO 6477o9 0

17046286 5652230 5341510 80i8 80+8 79i4 80i3 37825.0 32016.5 0+0 31305i7 0

81084187 27046380 25559114 82+8 82)8 82+6 82i4 2,.

XF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP l 12/3/87

0 Ql a ~