L-99-177, Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With

From kanterella
(Redirected from ML17241A430)
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With
ML17241A430
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/31/1999
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-177, NUDOCS 9908110208
Download: ML17241A430 (9)


Text

ACCESSION &BR FACIL;50 335

~~6-.389 AUTH:i4Q2$

'OGERS,J.A.

STALK,J.A.

RECIP.NAME CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

.St. Lucie Plant, Unit 1, Florida Power

&, Light Co.

St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTHOR AFFILIATION" Florida Power

& Light Co.

Florida Power

&: Light Co.

RECIPIENT AFFILIATION DOCKET I 05000335 05000389

SUBJECT:

Mo.With 990805 ltr pts for Jul-. 1999 for St Lucie Units 1

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME GLEAVES,W COPXES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME COPIES LTTR ENCL 0

INTERNAL: ACRS OC/DBA/PAD RGN2 1

1 1

1 1

1 CENTER 01 RES DRAA OERKB EXTERNAL: LMITCO,MARSHALL NRC PDR 1

1 1

1 NOAC 1

1 D

,..-qn(5~33

, i',

)Q

'E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

I

Florida Power 5 Light Company, 6501 South Ocean Orive, Jensen Beach, FL 34957 August 5, 1999 L-99-177 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the July 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/tlt Attachments cc:

Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant g2 f 9908i10208 95000335 PDR ADQCK 0 R

anFPLGroup company

0 I

~'

'j',

> ) Q F,

DOCKETNO 50 - 335 UNITNAME ST. LUCIEUNIT 1 DATE 08/03/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD:

JULY 1999

1. Design Electrical Rating (Mwe-Net) 830 2; Maximum Dependable Capacity (Mwe-Net) 839 MONTH

-YTD-CUMULATIVE

3. Number ofHours Reactor Critical
4. Number ofHours Generator On Line
5. Unit Reserve Shutdown Hours
6. Net Electrical Energy (MWH) 744 744 0.0 632072 5087 157056.5 5087 155420.7 0.0 0.0 4338977 126259515

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie Pl Aug. 3, 1999 J.A.ROGERS (561) 467-7296 REPORT MONTH J~ul 1999 Unit 1 operated at essentially fullpower for the entire month ofJuly.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated reliefvalves or the safety valves during the report period.

UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie I1 Aug. 3, 1999 Z.A.ROGERS (561) 467-7296 REPORT MONTH J~ul 1999 Number Date Typei Duration (Hours)

Reason2 Method of Shutting Down Reactor 3

Cause

& Corrective Action to Prevent Recurrence Unit 1 operated at essentially fullpower for the entire month ofJuly.

1 F

Fozced S

Scheduled 2

Reason A - Equipment failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training S License Examination F Administrative G - Operational Erzor (Explain)

H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4

Continued 5 - Load Reduction 9 - Other (Explain) 091589 ZPL

DOCKET NO UNITNAME DATE COMPLETED BY TELEPHONE 50- 389 ST. LUCIEUNIT2 08/03/99 J. A. ROGERS 561/467/7296 REPORTING PERIOD:

JULY 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839
3. Number ofHours Reactor Critical
4. Number ofHours Generator On Line
5. Unit Reserve Shutdown Hours MONTH

-YTD-CUMULATIVE 744 4919.6 120219.3 744 4910.7 118561.4 0.0 0.0 0.0

6. Net Electrical Energy (MWH) 633951 4088983 97094827

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-3S9 St. Lucie 82 Aug. 3, 1999 J.A.ROGERS (561) 467-7296 REPORT MONTH~Jul 1999 Unit 2 operated at essentially fullpower for the entire month ofJuly.

In accordance with the requirements ofTechnical Specification 6.9.1.6, there were no challenges to the power operated reliefvalves or the safety valves during the report period.

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNXT:

DATE:

COMPLETED BY TELEPHONE:

50-389 St. Lucie I2 A119. 3, 1999 Z.A.ROGERS (561) 467-7296 REPORT MONTHJ~ul 1999 Number Date Type 1

Duration (Hours)

Reason 2

Method of Shutting Down Reactor3 Cause

& Corrective Action to Prevent Recurrence Unit2 operated at essentially fullpower for the entire month ofJuly.

F Forced S

Scheduled Reason A - Equipment failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training a License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)