Corrected Operating Data Repts for Jul 1987
ML17342B175
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 07/31/1987
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17342B170 List:
References
NUDOCS 8802220129
Download: ML17342B175 (4)


Text

i Corrected Copy OPERATING DATA REPORT DOCKET NO DATE 50 335 8/11/87 COMPLETED BY Ni 'Wi GRANT TELEPHONE 305/694/4432 OPERATING STATUS a i UNXT NAHE: ST. LUCIE UNIT 1

2. REPORTING PERIOD: JULY r 1987 3o LICENSED THERHAL POWER (HWT)! 2700 4'. NAHEPLATE. RATXNG (GROSS HWE)o 850 5 ~ DESIGN ELECTRICAL RATING (NET HWE) o 830 5o HAXIHUH DEPENDABLE CAPACITY (GROSS MWE)+ 872
7. HAXIHUH 'DEPENDABLE CAPACXTY (NET MWE): 839 8 IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH')

SXNCE LAST REPORT ~ GIVE REASONS i 9e POWER LEVEL TO WHXCH RESTRICTED~ IF ANY (NET HWE) 10'EASONS FOR RESTRICTIONS~ IF ANY+

MONTHLY - YTD- CUMULATIVE iii NUMBER IN OF REPORT PERIOD f HOURS REACTOR WAS CRITXCAL 744 744+0 5087 3519i7 92999 '

68092.4 12'3, REACTOR RESERVE SHUTDOWN HOURS 0+0 OoO 205i3 HOURS GENERATOR ON-LINE 744oO 3398+7 67554i4 14'5'6'7m UNIT RESERVE SHUTDOWN HOURS 0 0 39i3 GROSS THERMAL ENERGY GENERATED (MWH) 2003731 8994255 172213446 24'OURS GROSS ELECTRICAL ENERGY GERERATED (HWH) 668439 3004670 56489815 18m NET ELECTRICAL ENERGY GENERATED (HWH) 635149 2838990 53324813

19. UNIT SERVXCE FACTOR 100oo 66 i 8 72o6 200 UNIT AVAILABILITYFACTOR 100o0 66o8 72+7 CAPACITY FACTOR (USING HDC NET) 101i8 66+5 71i5 21'2'73 CAPACITY FACTOR (USING DER NET) 102 ' 67o2 70+2 UNIT FORCED OUTAGE RATE SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 0 1.5 ) 3s) 25'F SHUT DOWN AT END OF REPORT PERIODS ESTIMATED DATE OF STARTUPo 8802220129 880216 .

.PDR *DOCK 05000250 R -. DCD"

~I ll Corrected Copy OPERATING DATA REPORT DOCKET NO 50 389 DATE 8/1 1/87 COMPLETED BY Ni HE GRANT TELEPHONE 305/694/4432 OPERATING STATUS UNIT NAME: STo, LUCIE . UNIT 2 REPORTING PERIOD; JULY~ 1987

3. LICENSED THERMAL POHER (MWT) f 2700 4o NAMEPLATE RATXNG (GROSS MME)o 850 5o DESIGN ELECTRICAL RATING (NET MME) o 830 6..MAXIMUM'EPENDABLE CAPACXTY (GROSS
7. MAXIMUM DEPENDABLE CAPACITY (NET MME)'82 MME):, 839 8 IF CHANGES OCCUR IN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT GIVE REASONS:

POWER LEVEL TO WHICH RESTRICTED> XF ANY (NET MME) 10'EASONS FOR RESTRICTIONS'F ANY:

MONTHLY -YTD- CUMULATIVE ili 12.

HOURS IN REPORT PERIOD+

NUMBER OF HOURS REACTOR'AS CRITICAL 744 744oO 5087 5024i2 34896 '

30399 '

13+ REACTOR RESERVE SHUTDOWN HOURS OiO OoO OiO HOURS GENERATOR ON-LINE 667i5

'4 i 4920o8 29748 i 6 15m UNIT RESERVE SHUTDOHN HOURS'6m 0 0 0 GROSS THERMAL ENERGY GENERATED (MMH) 1683283 13033744 77071645

17. GROSS ELECTRICAL ENERGY GERERATED (MHH) 552570 4357170 25751320 1'8. NET ELECTRICAL ENERGY GENERATED (MHH) 520403 4128826 24346430
19. UNXT SERVICE FACTOR 89+7 96o7 85.2 20'NXT AVAILABILITYFACTOR 89o7 96+7 85)2 21+ CAPACITY FACTOR (USING MDC NET) 83+4 96i7 85+5 22'APACITY FACTOR (USING DER NET) 84o3 97i8 8502
23. UNXT FORCED OUTAGE RATE 1,0+3 3.3 24m SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING 10/17/87~ 63 DAYS 25 IF SHUT DOWN AT END OF REPORT PERIOD r ESTIMATED DATE 'OF STARTUP f

0