ML17342B175

From kanterella
Jump to navigation Jump to search
Corrected Operating Data Repts for Jul 1987
ML17342B175
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 07/31/1987
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17342B170 List:
References
NUDOCS 8802220129
Download: ML17342B175 (4)


Text

i Corrected Copy OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 335 DATE 8/11/87 COMPLETED BY Ni 'Wi GRANT TELEPHONE 305/694/4432 a i UNXT NAHE:

ST.

LUCIE UNIT 1

2.

REPORTING PERIOD:

JULY r 1987 3o LICENSED THERHAL POWER (HWT)!

2700 4'.

NAHEPLATE. RATXNG (GROSS HWE)o 850 5 ~

DESIGN ELECTRICAL RATING (NET HWE) o 830 5o HAXIHUH DEPENDABLE CAPACITY (GROSS MWE)+

872 7.

HAXIHUH 'DEPENDABLE CAPACXTY (NET MWE):

839 8

IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH')

SXNCE LAST REPORT ~

GIVE REASONS i 9e POWER LEVEL TO WHXCH RESTRICTED~ IF ANY (NET HWE) 10'EASONS FOR RESTRICTIONS~ IF ANY+

MONTHLY

-YTD-CUMULATIVE iii 12'3, 14'5'6'7m 18m 19.

200 21'2'73 24'OURS IN REPORT PERIOD f NUMBER OF HOURS REACTOR WAS CRITXCAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

GROSS ELECTRICAL ENERGY GERERATED (HWH)

NET ELECTRICAL ENERGY GENERATED (HWH)

UNIT SERVXCE FACTOR UNIT AVAILABILITYFACTOR CAPACITY FACTOR (USING HDC NET)

CAPACITY FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 744+0 0+0 744oO 0

2003731 668439 635149 100oo 100o0 101i8 102 '

0 5087 3519i7 OoO 3398+7 0

8994255 3004670 2838990 66 i 8 66o8 66+5 67o2 1.5 92999 '

68092.4 205i3 67554i4 39i3 172213446 56489815 53324813 72o6 72+7 71i5 70+2

)

3s) 25'F SHUT DOWN AT END OF REPORT PERIODS ESTIMATED DATE OF STARTUPo 8802220129 880216

.PDR

  • DOCK 05000250 R

DCD"

~I ll

OPERATING STATUS Corrected Copy OPERATING DATA REPORT DOCKET NO 50 389 DATE 8/1 1/87 COMPLETED BY Ni HE GRANT TELEPHONE 305/694/4432 UNIT NAME:

STo, LUCIE

. UNIT 2 REPORTING PERIOD; JULY~ 1987 3.

LICENSED THERMAL POHER (MWT) f 2700 4o NAMEPLATE RATXNG (GROSS MME)o 850 5o DESIGN ELECTRICAL RATING (NET MME) o 830 6..MAXIMUM'EPENDABLECAPACXTY (GROSS MME)'82 7.

MAXIMUM DEPENDABLE CAPACITY (NET MME):, 839 8

IF CHANGES OCCUR IN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT GIVE REASONS:

POWER LEVEL TO WHICH RESTRICTED>

XF ANY (NET MME) 10'EASONS FOR RESTRICTIONS'F ANY:

MONTHLY

-YTD-CUMULATIVE ili HOURS IN REPORT PERIOD+

12.

NUMBER OF HOURS REACTOR'AS CRITICAL 13+

REACTOR RESERVE SHUTDOWN HOURS

'4 i

HOURS GENERATOR ON-LINE 15m UNIT RESERVE SHUTDOHN HOURS'6m GROSS THERMAL ENERGY GENERATED (MMH) 17.

GROSS ELECTRICAL ENERGY GERERATED (MHH) 1'8.

NET ELECTRICAL ENERGY GENERATED (MHH) 19.

UNXT SERVICE FACTOR 20'NXT AVAILABILITYFACTOR 21+

CAPACITY FACTOR (USING MDC NET) 22'APACITY FACTOR (USING DER NET) 23.

UNXT FORCED OUTAGE RATE 24m SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING 10/17/87~

63 DAYS 744 744oO OiO 667i5 0

1683283 552570 520403 89+7 89o7 83+4 84o3 1,0+3 5087 5024i2 OoO 4920o8 0

13033744 4357170 4128826 96o7 96+7 96i7 97i8 3.3 34896 '

30399 '

OiO 29748 i 6 0

77071645 25751320 24346430 85.2 85)2 85+5 8502 25 IF SHUT DOWN AT END OF REPORT PERIOD r ESTIMATED DATE 'OF STARTUP f

0