ML17229A905

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr
ML17229A905
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/31/1998
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-285, NUDOCS 9811180023
Download: ML17229A905 (9)


Text

CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9811180023 DOC.DATE: 98/10/31 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Floxida Power &. Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power &. Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power & Light Co.

STALL,J.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Oct 1998 for St Lucie,Units 1 2.With 981110 ltr. A DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR I ENCL I SIZE: T TITLE: Monthly Operating Report (per 'Tech Specs)

NOTES:

G RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR<ENCL PD2-3 PD 1 GLEAVES,W 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 TER 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 NOTEgTO ALT "RIDS" RECZPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

1 Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 November 10, 1998

, L-98-285 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the October 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, J. A. Stall Vice President St. Lucie Plant, JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant t04 98i03i 98iii80023 ADQCK 05000335 PDR PDR R

an FPL Group company

Docket No: 50-335 Unit Name St. Lucie Unit 1 Date: 11/03/98 Completed by: J. A. Rogers Telephone: (561) 467-7296 OPERATING DATA REPORT REPORT MONTH: OCTOBER 1998

1. Design Electrical Rating (MWe-Net) 830
2. Maximum Dependable Capacity (MWe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 745 6979.2 150505.5
4. Number of Hours Generator On Line 745 6929.5 148869.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWh) 634192 5788008 120673067

'. Docket No: 50-335 Unit Name St. Lucie Unit 1 Date: 11/03/98 Completed by: J. A. Rogers Telephone: (561) 467-7296 SU VIMARYOF OPERATING EXPERIENCE REPORT MONTH: OCTOBER 1998 Unit 1 operated at essentially full power for the entire month of October.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

Docket No: 50-335 Unit Name St. Lucie Unit 1 Date: 11/03/98 Completed by: J. A. Rogers Telephone: (561) 467-7296 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 1998 Number Date Type Duration Reason Method of Cause 0 Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit l operated at essentially full power for the entire month of October.

1 2 3 F Forced Reason Method A - Equipment 1 - Manual S Scheduled

- Maintenancefailure (explain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory restriction 4 Continued E - Operator Training 0 License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H Other (Explain)

Docket No:

Unit Name 50-389 t

St. Lucie Unit 2 Date: 11/03/98 Completed by: J. A. Rogers Telephone: (561) 467-7296 OPERATING DATA REPORT REPORT MONTH: OCTOBER 1998

1. Design Electrical Rating (MWe-Net) 830
2. Maximum Dependable Capacity (MWe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 745 7296 114537.5
4. Number of Hours Generator On Line 745 7266.9 112907.5
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWh) 627792 6153376 92419770

~ ~

, Docket No: 50-389 Unit Name St. Lucie Unit 2 Date: 11/03/98 Completed by: J. A. Rogers Telephone: (561) 467-7296

SUMMARY

OF OPERATING EXPERIENCE REPORT MONTH: OCTOBER 199S Unit 2 operated at essentially full power for the entire month of October.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

Docket No: 50-389 Unit Name St. Lucie Unit 2 Date: 11/03/98 Completed by: J. A. Rogers Telephone: (561) 467-7296 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH October 1998 Number Date Typel Duration Reason2 Method of . Cause 8c Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of October.

F Forced Reason Method S Scheduled A - Equipment failure (explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F Achninistratlve 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)