Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr
ML17229A528
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/31/1997
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-288, NUDOCS 9711200115
Download: ML17229A528 (10)


Text

CATEGORY 1 sj REGULA . Y INFORMATION DISTRIBUTI . SYSTEM (RIDS)

I ACCESSION NBR:9711200115 DOC.DATE: 97/10/31 NOTARIZED: NO DOCKET ¹ FACIL:50-335t':St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335

~~94383,; St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH.NAME AUTHOR AFFXLIATION ROGERS,J.A. Florida Power & Light Co.

STALL,J.A. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Oct 1997 for St Lucie, C, Units 1 & 2.W/971113 ltr. A' DISTRXBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 WIENS,L. 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTE 1 1 NRR/DRPM/PECB 1 1 0 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 C,

U E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

Florida Power & Light Company, 6351 S. Ocean Drive. Sensen Beach, FL 34957 November 13, 1997 L-97-288 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6,9.1.6 and the guidance of Generic Letter 97-02, attached are the October 1997 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments

, cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant

<.G.'.t Pi'3 q7 PDR jj PQQ$ $ 5 +7%03%

ADOCK Q llllllllllllllllllllllllllllIIIIIIIIIIII R 4 an FPL Group company C

DOCKET NO, UNITNAME DATE

'T. 50 - 335 LUCIE UNIT 1 11/04/97 COMPLETED BY J. A. ROGERS TELEPHONE, 561/467/7296 REPORTING PERIOD: OCTOBER 1997

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 457.2 6858.7 143526.3
4. Number of Hours Generator On Line 456.1 6843.1 141940.2
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 379653 5717746'14885059

Y F ERA G EXPERIENCE C

7 DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: November 4, 1997 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH b r 1 Unit 1 operated at essentially full power through October 18. On October 19 the unit began downpowering. At 0008 on October 20 the unit was removed from service for Cycle 15 refueling and maintenance.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST. LUCIE UNIT.1 DATE: Nov. 4, 1997 COMPLETED BY: J.A. Rogers REPORT MONTH Number Date Type'uration Reason'ethod of & Corrective (Hours)

Reactor'ause Shutting Down Action to Prevent Recurrence 10/19/97 0.0 Unit 1 doivnpowered for refueling and maintenance.

10/20/97 288.9 Unit 1 offline for Cycle 15 refueling and maintenance.

F Forced Reason Method S Scheduled A - Equipment failure (explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Sera~

D - Regulatory restriction 4 - Continued E - Operator Training a License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)

OMSS1 PPL

DOCKET NO. 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 11/04/97 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: OCTOBER 1997

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 745 6331.3 105777.5
4. Number of Hours Generator On Line 745 6292.4 104176.6
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 633899 5245844 85013314

~ ~

RY OF PERATI EXPER E E DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: November 4, 1997 COMPLETED BY: Z.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Oct r Unit 2 operated at essentially full power for the entire month of October.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

A"

~ ~

r II 4,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT.2 DATE: Nov.4, 1997 COMPLETED BY: J. A. Rogers TELEPHONE: (561) 467;7296 REPORT MONTH 0 tober Number Date Type~ Duration Reason'ethod of Cause & Corrective (Hours) Shutting Action to Down Prevent Recurrence Reactor*

Unit 2 operated at essentially full power for the entire month of October.

1 2 F Forced Reason Method S Scheduled A - Ecgxipment failure (explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)