Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/88-30
ML20247K129
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/27/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8904050175
Download: ML20247K129 (2)


See also: IR 05000382/1988030

Text

{{#Wiki_filter:_ _ _ _ . _ _ _ _ _ - _ _ _ _ _ .

                                                                                                                    t
 .;                 . .
                          ,
                              .
              '
                                                                  MAR 27 G89                                        l
                                                                                                                    l
                        In Reply Refer To:                                                                          )
                        Docket:    50-382/88-30                                                                     l
                                                                                                                    1
                                                                                                                    l
                        Louisiana Power & Light Company
                        ATTN: J. G. Dewease, Senior Vice President                                                  i
                                Nuclear Operations                                                                  J
                        317 Baronne Street                                                                          l
                        New Orleans, Louisiana 70160
                        Gentlemen:
                              Thank you for your letter of March 9,1989, in response to our letter and
                                                                                                                    i
                        Notice of Viniation dated February 8, 1989.           We have reviewed your reply and       i
                        find it responsive to the concerns raised in our Notice of Violation. We will
                        review the implementation of your corrective actions during a future inspection

< f

                        to determine that full compliance has been achieved and will be maintained.                 l
                                                                                                                    l
                                                                                                                    l

l Sincerely, j

                                                                          Original Signed Ily,
                                                                              L. J. Caliau                          ;
                                                                                                                    1
                                                                         L. J. Callan, Director
                                                                         Division of Reactor Projec,-
                        cc:
                        Louisiana Power & Light Company
                        ATTN:   R. P. Barkhurst, Vice President
                                Nuclear Operations                                                                  j
                        P.O. Box B                                                                                  ;
                        Killona, Louisiana 70066                                                                    l
                        Louisiana Power & Light Company

l ATTN: N. S. Carns, Plant Manager

                        P.O. Box B
                        Killona, Louisiana 70066
                        (cc's continued)

l

                        RIV:FRPS:RPS                   C:SEPS:RP   C:RPB             C:RPS/A       D RPg
                        LRicketson/si'r              '
                                                       RBaer       CMurray           Chamberlain   Callan
                        3/25/89                        3 4 /89                       3g./89        341/89
                                                                   349)/89
                                 8904050175 890327
                                 PDR               ADOCK 03000382
                                 Q                           PDC

t TCOc'

                                                                               ___ ____ __-
 ,   , ,
                                 ,
   .
                 Louisiana Power & Light Company                           -2-
                Louisiana Power & Light Company
               ATTN:                       R. F. Burski, Manager, Nuclear
                                             Safety & Regulatory Affairs
               317 Baionne Street
               P.O. Box 60340
               New Orleans, Louisiana 70160
               Louisiana Power & Light Company
              ATTN:                        L. W. Laughlin, Site
                                           Licensing Support Supervisor
               P.O. Box B
               Killona, Louisiana 70066
               Louisiana Power & Light Company
             ATTN:                         G. M. Davis, Manager, Events
                                             Analysis Reporting & Response
              P.O. Box B
              Killona, Louisiana 70066
             Middle South Services
             ATTN:                         Mr. R. T. Lally
             P.O. Box 61000
             New Orleans, Louisiana 70101
             Louisiana Radiation Control Program Director
            bec to DMB (IE06)
            bcc w/ licensee's letter:
            R. D. Martin, RA
            Lisa Shea, RM/ALF
            Resident Inspector
           Section Chief, DRP/A
           DRP
           RPB-DRSS
           DRS
          MIS System
           RSTS Operator
           RIV File
           Inspector
          Section Chief
          B. Murray
          R. L. Bangart
          R. E. Hall
         Project Engineer, DRP/A
         D. Wigginton, NRR Project Manager

- _ _ _ _ _ - _ _ _ - _ _ _ _ - _ _ .__

      v
 \
   I
    *
      .   , .                .
                   '
        .
   '
                     ,,i: ,.
                    
                                                                             +  P. O. BOX 60340

t

                                    LO UISI
                                    POWE  R & AN
                                               LlG A
                                                   HT / 317
                                                         NEWBARONNE          STREET
                                                             ORLEANS, LOUISlANA 70160   .
                                                                                           (504)595 3100
                                                                                                                        i
                                                                                                                        l

'

              Ur',?NUd ?NU                                                                                              j
                                                                                                                        l
                                                                March 9, 1989                                           l
                                                                                                                        l
                                                                                                  W3P89-0047
                                                                                                  A4.05
                                                                                                  QA
                                                                                                                   '
                 U.S. Nuclear Regulatory Commission
                                                                                              hik(6)[${]\V/[['
                 ATTN: Document Control Desk                                                    'b. ',, -
                 Washington, D.C. 20555                                                       .     I MAR I 3192
                 Subject: Waterford 3 SES                                                     -                  -
                                     Docket No. 50-382                                                                l
                                     License No. NPF-38                                                 %*
                                                                                                                     I
                                     NRC Inspection Report 88-30
                 Gentlemen:
                 In accordance with 10 CFR Part 2.201, Louisiana Power & Light hereby
                 submits in Attachment I the response to the Violation identified in                                 i
                 Appendix A of the subject Inspection Report.
                  If you have any questions concerning this response, please contact
                 T.J. Gaudet at (504) 464-3325.
                                                                 Very truly yours,                                   !
                                                                                                                     !
                                                                       ,     4
                                                                 R.F.     rski                                       i
                                                                 Manager                                              i
                                                                 Nuclear Safety & Regulatory Affairs                 ;
                                                                                                                     I'
                 RFB:TJG:ssf
                                                                                                                      !
                 Attachment
                                                                                                                      )
                                                                                                                      I
                 cc:           R.D. Martin, NRC Region,IV >                                                           l
                               J.A. Calvo, NRC-NRR
                                                                                                                      l
                               D.L. Wigginton, NRC-NRR                                                                l
                               NRC Resident Inspectors Office                                                         i
                               E.L. Blake
                               W.M. Stevenson
                               & cy Q [ O O b N $           0'
                                                "AN EQUAL OPPORTUNITY EMPLOYER"
 dC- %q        10 2.
         v
  .%
     [
     *
                                                                                          Attachment to
       ,     , .              .
                                                                                         W3P89-0047
                           *
     ,     ,
                                                                                          Page 1 of 2
     ,                                                            ATTACHMENT 1
                                      LP&L Response to the Violation Identified in Appendix A
                                                           of Inspection Report 88-30
                         VIOLATION NO. 8830-01
                         Overexposure to the Skin of the Whole Body
                           10 CFR Part 20.101(a) requires, in part, that "...no licensee shall
                         possess, use, or transfer licensed material in such a manner as'to cause
                         any individual in a restricted area to receive in any period of one
                         calendar quarter from radioactive material and other sources of radiation a
                         total occupational dose in excess of ... (7 Rems per calendar quarter to
                         the skin of the whole body)."
                        Contrary to the above, the NRC inspectors determined during a review of
                        Licensee Event Report 88-10, dated June 16, 1988, and subsequent onsite
                         inspection on December 22, 1988, that two individuals had received
                         radiation exposures to the skin of the whole body of 22 and 18 rems on May
                          16 and 18, 1988, respectively, from radioactive fuel particles.
                       This is a Severity Level IV violation.
                       RESPONSE
                         (1) Reason For The Violation
                                LP&L admits this violation in that two individuals did receive
                                radiation exposures to the skin of the whole body greater than the
                                quarterly occupational dose allowed by 10CFR20.101. LP&L attributed
                                the violation's root cause to shift Health Physier personnel failing
                                to establish work areas as hot particle zones during cavity
                                evolutions.
                                Health Physics Administrative Procedure HP-1-241, " Hot Tarticle
                                Contamination Control", provides the-guidelines at Waterford 3 to
                                minimize personnel exposure from hot particle contamination. It

i

                                defines three hot particle area designations to assist in controlling

l hot particle contamination and personnel exposure to hot particles.

                                Zone 1 Hot Particle Areas are areas which are not expected to become
                                contaminated with hot particles, but warrant specific hot particle
                                contamination surveys to verify hot particle controls. Zone 2 Hot
                                Particle Areas are areas that are maintained free of hot patticle
                                contamination, but have a potential for becoming contaminated with hot
                                particles. A Zone 2 Hot Particle Area primarily serves as a buffer

l zone between Zone 3 Hot Particle Areas and other areas. Zone 3 Hot

                                Particle Areas are those that are either known or suspected to be
                                contaminated with hot particles. Hot particle surveys are performed
                                twice per shift in Zones 2 and 3 during either maintenance or
                                operational activities. Also, personnel working in Zone 3 Areas
                                periodically monitor for hot particles and log into and out of the

l

-                _ _ - _ _            -    _ _ _ _ _ - - _  __
        ,,
                                                                                                           3
    k                                                                                       Attachment to
     .,                    ,     .                                                          W3P89-0047
                              -
    ,
                         ,                                                                  Page 2 of 2
      ,                            Zone 3 Areas. In both the May 16 and 18, 1988, events, the              j
                                   contaminated individuals worked in areas demonstrated free of hot
                                   particles during prior surveys. Health Physics had designated these
                                   work areas, which were adjacent to Zone 3 Areas, as Zone 2 areas. Had
                                   the areas been designated as Zone 3 before these events, hot particle    j
                                   monitoring of personnel could have detected the particles before the    '
                                   personnel exceeded the allowed exposure.

l

                             (2) Corrective Steps That Have Been Taken And The Results Achieved
                                                                                                            ,

i Both individuals were decontaminated in accordance with the proper

                                   methods established in Health Physics Procedure HP-02-704, " Personnel
                                   Decontamination". Formal dose assessments were performed on each as
                                   required by Health Physics Procedure HP-2-101, " Dosimetry Problem
                                   Reports".
                                   Following the discovery of the source of the second individual's         l
                                   contamination on May 18, 1988, LP&L curtailed work in the area
                                   surrounding the reactor cavity until extensive hot particle surveys
                                   could be completed. Designated personnel surveyed the entire Reactor

l Containment Building +46 foot level and the top portion of the reactor !

                                   cavity and later upgraded contamination controls in these areas. It
                                   should be noted that the hot particles stayed within the
                                   Radiologically Controlled Area. Throughout the remainder of the
                                   refueling out. age, no additional personnel overexposure because of hot
                                   particles occurred.
                                   The Operations Health Physics Technicians received refresher training
                                   on HP-1-241 which included the importance of appropriately
                                   establishing hot particle contamination controls.
                             (3) Corrective Steps Which Will Be Taken To Avoid Further Violations
                                   Based on the above information, LP&L feels that the necessary steps
                                   have been taken to ensure that this type of violation does not recur.   l
                                                                                                           !
                             (4) Date When Full Compliance Will Be Achieved
                                   LP&L is currently in full compliance.
                                                                                                           ,

l

 ..
           _ _ _ _ - _ .
                                                                              __   _ _ _ _ _ _    __
                                      fEB   B NtB

-

   In' Reply Refer To:
   Docket: 50-382/88-30
   Louisiana Power & Light Company
  ATTN:    J. G. Dewease, Senior Vice President
           Nuclear Operations
  317 Baronne Street
  New Orleans, Louisiana 70160
  Gentlemen:
  This refers to the inspection conductec' by Messrs. H. Chaney and L. Ricketson
  of this office during the period Decerr;.s.r 19-23, 1988, of activities authordzed
  by NRC Operating License NPF-38 for the Waterford Steam Electric Station,
  Unit 3, and to the discussion of our findings with Mr. D. Packer and other
  members of your staf f at the conclusion of the inspection on December 23, 1988.                   ,
  Areas examined during the inspection included occupational radiation exposure                       I
  and transportation prograns. The NRC inspectors also examined the
  circumstances surrounding the overexposure of two individuals in May 1988, and
  the issuance of several violations of NRC and Department of Transportation
  (DOT) regulations by the state of Nevada in June 1988.- Within these -areas, the
  inspection consisted of selective examination of procedures and representative
  records, interviews with personnel, and observations by the N E inspectors.
  The inspection findings are documented in the enclosed inspection report.
  During this inspection, it was found that certain of your activities, were in
  violation of NRC requirements. These violations involving hot particles could
  individus11y be classified at a Severity Level III because the exposure
  exceeded the regulatory limit. However, the health implication of each of the
  exposures is minimal due to the small area of the skin involved. Therefore, we
  have classified these events as a Severity Level IV violation. We also note
  the following actions on the part of LP&L: (1) prompt identification and
  reporting of the event to the NRC, (2) was not willful, (3) at the time of the
  event, you had in place implementation of a het particle cortrol program in
  response t0 industry problems and these incidents do not represent a breakdown
  in management control, and (4) to this point and thereafter maintained exposures
  c've to hot particles below regulatory limits.
  You are required to respond to the above noted violation, ir writing, in
  accordarice with the provisions o: Section 2.201 of the NRC's " Rules of
  Practice," Part 2, Title 10, Code of Feocal Regulati,. is. Your response should
  be based on the specifics contained in the Notice of Violation enclosed with
  this letter.
  RIV:FRPS:RF
  H'.)Cha ney -
                   C FHPS<
                   REBaer
                              C:RPB
                              BMurray
                                           SA
                                         ODChamberlain
                                                            B
                                                             -
                                                               RhiE00h
                                                                  an    qs   oTn
  g g/89            '/(/89 fl// g /89 2./ f /89            2/4 /89      L/L/89   ,
 $9 011(o sw                                                                                   6't'O
                              3@
   _
                                                                       - _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _
 .          <
   .
   '
                                                                                                                       !
     Louisiana Power & Light Company               -2-                                                                 !
                                                                                                                       l
                                                                                                                       l
                                                                                                                      i
     We also reviewed two state of Nevada identified violations of transportation         ~
     requirements involving waste shipments to Beatty, Nevada. These violations
     were identified as an Unresolved Item (382/8820-02) in NRC Inspection
     Report 50-382/88-20. We note that these violations have already been the                                          4
     subject of enforcement action by the state of Nevada. No civil penalty was

,

     assessed by the state of Nevada for the violations, but your authority to,

l utilize the Beatty, Nevada radioactive wsste burial facility was suspended until I you reestablished compliance with transportation and state of Nevada

     requirements. In view of the enforcement action already taken by the State,
     and based on a review of the specifics of the violations and your expedient
     actions to correct the problems and in accordance with the discretionary powers                                  ;
     authorized by the NRC enforcement policy (10 CFR Part 2, Appendix C, 1988), we                                   '
                                                                                                                       !
     have decided not to take any further enforcement actions concerning these
     violations. Your corrective actions to the aforementioned violations appear to
     be suitable to prevent a recurrence of the violations in the future. You will                                     1
     not be required to respond to these transportation violations.                                                   '
     We have also examined actions you have taken with regard to previously
     idertified inspection findings. The status of these items is identified in
     paragraph 2 of the enclosed report.
     The response directed by this letter and the accompanying Notice is not subject                                   i
     to the clearance procedures of the Office of Management and Budget as required
     by the Paperwork Reduction Act of 1980, PL 96 ill.
     Should you have any questions concerning this espection, we will be pleased to
     discuss them with you.
                                                                                                                      >
                                                  Sincerel ,
                                                 \      u    ULv
                                                    . J. Callan, Direwtor
                                                a Division of Reactor Projects
                                              '
     Enclosures:
     1.    Appendix A - Notice of Violation
     2.    Appendix B - NRC Inspection Report
                            50-88-30

( 3. Attachment - Radiation Exposure Expenditures for Selected

               Radiological Work Operations During Cycle 2 Refueling Outage
     cc w/ enclosures:
     Louisiana Power & Light Company
     ATTN:    R. P. Barkhurst, Vice President
              Nuclear Operations
     P.O. Box B
     K111ona, Louisiana 70065
     (ce's continued)

l

                                                                                                             _--_ _ -
 ..
      .,                                                                             ---
                                                                                         i
                                                                                          '
    .    .   .
           .
                 ,
               Louisiana Power & Light Company         -3-
                                                                                         1
                                                                                          1
               Louisiana Power & Light Company                                            l
               ATTN:   N. S. Carns, Plant Manager
               P.O. Box B
               Killona, Louisiana 70066                                                  j
               Louisiana Power & Light Company
               ATTN:   R  F. Burski, Manager, Nuclear
                         Safety & Regulatory Aff airs
               317 Baronne Street                                                        i
                                                                                         l
               P.O. Box 60340
               New Orleans, Louisiana 70160                                               l
               Louisiana Power & Light Company
               ATTN:   L. W. Laughlin, Site
                       Licensing Support Supervisor
               P.O. Box B
               Killona, Louisiana 70066

l l Louisiana Power & Light Company

               ATTN:   G. M. Davis, Manager, Events
                         Analysis Reporting & Response
               P.O. Box B
               Killona, Louisiana 70066
               M Mdle South Services
               ATTN:   Mr. R. T. Lally

. '

               P.O. Box 61000
               New Orleans, Louisiana 70161
               Louisiana Radiation Control Program Director
               bec to DMB (IE06)
               bec distrib. by RIVi
               *RRI            /                       *R. D. Martin, RA
               *Section Chief (DRP/A)                  *DRP
               *RPB-DRSS /                             " MIS System
               * Project Engineer, DRP/A               *RSTS Operator
               *RIV File                               *DRS

l *D. Wigginton, NRR Project Manager (MS: 13-D-18) l Lisa Shea, RM/ALF

               *RBangart
               *RHall
               *BMurray
               *BNicholas

i '

               *w/766

,

                                                                         _ - - _ __-
    v
      .    .
  .  s.            .
        ..
                                                 APPENDIX A
                                                                                              i
                                             NOTICE OF VIOLATION
             Louisiana Power & Light Company                        Docket: 50-382
             Waterford Steam Electric Station No. 3                 License: NPF-38
             During an NRC inspection conducted during December 19-23, 1988, a violation
             of NRC requirements was identified. The violation involved radiation
             overexposure to the skin of the whole body of two workers. In accordance with
             the " General Statement of Policy and Procedure for NRC Enforcement Actions,"
             10 CFR Part 2. Appendix C (1988), the violation is listed below:
                   Overexposure to the Skin of the Whole Body
                   10 CFR Part 20.101(a) requires, in part, that ". . . no licensee shall
                   possess, use, or transfer licensed material in such a manner as to cause
                   any individual in a rr a ricted area to receive in any period of one
                   calendar quarter from radioactive material and other sources of radiation
                   a total occupational dose in excess of . . . (7h Rems per calendar quarter
                   to the skin of the whole body)."
                   Contrary to the above, the NRC inspectors determined during a review of
                   Licensee Event Report 88-10, dated June 16, 1988, and subsequent onsite
                   inspection on December 22, 1988, that two individuals had received

l radiation exposures to the skin of the whole body of 22 and 18 rems on ' l May 16 and 18, 1988, respectively, from radioactive fuel particles. l

                   This is a Severity Level IV violation. (Supplement IV) (382/8830-01)

'

             Pursuant to the provisions of 10 CFR 2.201, Louisiana Power & Light Company      {
             is hereby required to submit a written statement or explanation to this office   f

l within 30 days of the date of the letter transmitting this Notice. This reply '

             should include for each violation: (1) the reason for the violation if
             admitted, (2) the corrective steps that have been taken and the results
             achieved, (3) the corrective steps that will be taken to avoid further
             violations, and (4) the date when full compliance will be achieved. Where good
             cause is shown, consideration will be given to extending the response time.

I

             Dated at Arlington, Texas
             this    8th    day offebruary 1989