ML20236R227: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20236R227
| number = ML20236R227
| issue date = 11/19/1987
| issue date = 11/19/1987
| title = Ack Receipt of Util 871001 Ltr Transmitting Updated QA Program for Plant Operations.Util Will Receive Ltr from Ofc at Completion of Review
| title = Ack Receipt of Util Transmitting Updated QA Program for Plant Operations.Util Will Receive Ltr from Ofc at Completion of Review
| author name = Callan L
| author name = Callan L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8711230169
| document report number = NUDOCS 8711230169
| title reference date = 10-01-1987
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
Line 22: Line 23:


==SUBJECT:==
==SUBJECT:==
SUBMITTAL 0F QUALITY ASSURANCE PROGRAM FOR PLANT OPERATIONS Region IV is in receipt of your letter dated October 3,1987, transmitting Waterford 3 SES Updated Quality Assurance Program for Operations (FSAR Section 17.2).
SUBMITTAL 0F QUALITY ASSURANCE PROGRAM FOR PLANT OPERATIONS Region IV is in receipt of your {{letter dated|date=October 3, 1987|text=letter dated October 3,1987}}, transmitting Waterford 3 SES Updated Quality Assurance Program for Operations (FSAR Section 17.2).
This is not an acceptance letter pursuant to 10 CFR Part 50.54(a)(3)(iv) as the current description of your program is still undergoing review. You will receive a letter from this office when our review is complete. If questions arise during our review process, we will contact you for their resolution.
This is not an acceptance letter pursuant to 10 CFR Part 50.54(a)(3)(iv) as the current description of your program is still undergoing review. You will receive a letter from this office when our review is complete. If questions arise during our review process, we will contact you for their resolution.
Sincerely, Original Signed ny A. B. Beach L. J. Callan, Director Division of Reactor Projects cc:
Sincerely, Original Signed ny A. B. Beach L. J. Callan, Director Division of Reactor Projects cc:

Latest revision as of 23:48, 19 March 2021

Ack Receipt of Util Transmitting Updated QA Program for Plant Operations.Util Will Receive Ltr from Ofc at Completion of Review
ML20236R227
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/19/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8711230169
Download: ML20236R227 (2)


Text

_ _ ______ - _ - _ _ _

'^ NOV'1 9 1981 In Reply Refer To:

Docket: 50-382 Louisiana Power & Light Company .

ATTN: J. G. Dewease, Senior Vice President Nuclear Operations 317 Baronne Street New Orleans, Louisiana 70160 Gentlemen:

SUBJECT:

SUBMITTAL 0F QUALITY ASSURANCE PROGRAM FOR PLANT OPERATIONS Region IV is in receipt of your letter dated October 3,1987, transmitting Waterford 3 SES Updated Quality Assurance Program for Operations (FSAR Section 17.2).

This is not an acceptance letter pursuant to 10 CFR Part 50.54(a)(3)(iv) as the current description of your program is still undergoing review. You will receive a letter from this office when our review is complete. If questions arise during our review process, we will contact you for their resolution.

Sincerely, Original Signed ny A. B. Beach L. J. Callan, Director Division of Reactor Projects cc:

Louisiana Power & Light Company ATTN: G. E. Wuller, Onsite Licensing Coordinator P.O. Box B Killona, Louisiana 70066 Louisiana Power & Light Company ATTN: N. S. Carns, Plant Manager P.O. Box B Killona, Louisiana 70066 Middle South Services ATTN: R. T. Lally l l

P.O. Box 61000 New Orleans, Louisiana 70161 k

RI C:0 C:PSS d C:PSAN 4 D:DRP JBo dman/cjg WSeidle RIrelan JJaud Jo J 40' J Milhoan LJCallan 11 / t7/87 Il//7/87 /////'/87 W (V T // /7/8y /{ //7/87 11AF/87 8711230169 871119 PDR ADOCK 05000392 /

P PDR /

. -i Louisiona Power & Light Company cc: (cont'd)

Louisiana Power & Light Company ATTN: K. W. Cook, Nuclear Safety and Regulatory Affairs Manager 317 Baronne Street P.O. Box 60340 New Orleans, Louisiana 70160 Louisiana Radiation Control Program Director bec to DMB (IE43) l bcc distrib. by RIV:

DRP Resident Inspector R. D. Martin, RA SectionChief(DRP/C) Lisa Shea, RM/ALF MIS System RPSB-DRSS RSTS Operator Project Engineer, DRP/C RIV File W. Paulson, NRR Project Manager ,

R. Hall DRS 1 TSS l JBoardman 1

i 1

1 1

l l l l 1

1 i

i 4

- _ _ _ - _ _ _ _ _ _ _ _ _ __ _ L