| {{#Wiki_filter:Corrected Copy'OF'ERATXNG DATA REPORT OPERATXNG STATUS DOCI<ET NO 50-335 DATE 12/14/87 COMF'LETED BY N, W.GRANT TELEF'HONE 305/694/4432 1.UNIT NAME: ST.LUCXE UNXT 1 2.REPORTING PERXQD:NOVEMBER 1987 3 t LICENSED THERMAL POWER (MWT): 2700 4t NAMEPlATE RATING (GROSS MWE)t 850 5 DESXGN ELECTRICAL RATXNG (NET MWE)'30 h.'MAXIMUM DFPENDABLE CAPACITY<GROSS MWE)t 872 7.MAXXMUM DEPENDABLE CAF'ACXTY (NET MWE)t'39 8.IF CHANGES OCCUR IN C*F'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GXVE RE*SONS: POWER LEVEL TQ WHICH RESTRICTED~ | | {{#Wiki_filter:Corrected Copy |
| XF ANY.(NET MWE)10t RE*SONS FOR RESTRXCTIONSD XF ANY: MONTHLY-YTD-CUMULATIVE 1 1.HOURS IN REPORT PERIOD l.12.NUMBER OF HOURS'EACTOR WAS CRITICAL 13t REACTOR RESERVE SHUTDOWN HOURS i4.HOURS GENFRATQR ON-LINE 15, UNIT RESERVE SHUTDOWN HOURS 1'6.GROSS THERMAL ENERGY, GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GERERATED.(MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNXT SERVICE.FACTOR 20, UNXT AVAXLABIL'XTY FACTOR 21t CAPACITY FACTOR (USING MDC,NET)2.CAPACXTY F*CTOR<USXNG DER NET)23.UNIT FORCED OUTAGE RATE'4.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 e 0 OtO 728.0 0 1937190 647140'14715 100tO 100tO 10it8 102t9 0 8016 6233t7 0.0 6079tO 0 16155399 53?7920 5088109 75.8 75t8 75t7 76.5 4.7 95928tO 70806.4 20~t3 70234t6 39t3 179374 90 58863065 55573932 73.2 73t3 72t2 70t9 I 40 I 25.IF SHUT DOWN AT END OF REPORT PERIOD~ESTIMATED DATE OF STARTUP: '8802220,145 880216'DR ADOCK 05000250 R ,.DCD 1l hl OPERATXNG STATUS Corrected CopV OPERATING DATA REPORT DOCVET NO 50-389 DATE 12/14/87 COMPLETED BY N'.W.GRANT TELEPHONE 305/694/4432 io UNIT NAME: STi LUCIE UNIT 2 REPORTXNG PERTOD:NOVEMBER 1987 3.LICENSED THERMAL POWER (MWT)o~700 NAMEPLATE RATXNG<GROSS MWE)~850 5.DESIGN FLECTRXCAL RATING (NET MWE): 830 6.MAXXMUM DEPENDABLE CAPACITY (GROSS MWE)o 882 7.MAXXMUM DEPENDABLE CAPACITY<NET MWE)e 839 8.IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GIVE REASONS', POWER LEVEL TO WHICH RESTRICTED. | | ' |
| IF ANY (NET MWE)10m REASONS FOR RESTRICTIONS'F ANY+MONTHLY-YTD-CUMULATIVE 11.HOURS XN REPORT PERIODS 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14m HOURS GENERATOR ON-LINE 15+UNIT RESERVE SHUTDOWN HOURS lb.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GERERATED (MWH)18.NET ELECTRXCAI ENERGY GENERATED (MWH)19.UNXT SERVICE FACTOR 20.UNXT AVAXLABXLXTY FACTOR 21.CAPACITY FACTOR (USXNG MDC NET)22'*PACXTY FACTOR (USING DER NET): 3.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 104+4 OiO 44+9 0 44019 12610"2005 6+2 6+2 Oi3 Oi3.74.3 8016 6640+9 OiO 6477o9 0 17046286 5652230 5341510 80i8 80+8 79i4 80i3 37825.0 32016.5 0+0 31305i7 0 81084187 27046380 25559114 82+8 82)8 82+6 82i4 2,.XF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP l 12/3/87 0 Ql a~}} | | OF'ERATXNG DATA REPORT DOCI<ET NO 50 335 DATE 12/14/87 COMF'LETED BY N, W. GRANT TELEF'HONE 305/694/4432 OPERATXNG STATUS |
| | : 1. UNIT NAME: ST. LUCXE |
| | '30 UNXT 1 |
| | : 2. REPORTING PERXQD:NOVEMBER 1987 3 t LICENSED THERMAL POWER ( MWT ): 2700 4t NAMEPlATE RATING (GROSS MWE)t 850 5 DESXGN ELECTRICAL RATXNG (NET MWE) |
| | : h. 'MAXIMUM DFPENDABLE CAPACITY <GROSS MWE) t 872 |
| | : 7. MAXXMUM DEPENDABLE CAF'ACXTY (NET MWE)t'39 7) |
| | : 8. IF CHANGES OCCUR IN C*F'ACITY RATINGS (ITEMS NUMBER 3 THROUGH SINCE LAST REPORT ~ GXVE RE*SONS: |
| | POWER LEVEL TQ WHICH RESTRICTED~ XF ANY. (NET MWE) 10t RE*SONS FOR RESTRXCTIONSD XF ANY: |
| | MONTHLY - YTD- CUMULATIVE 11 . HOURS IN REPORT PERIOD l. 720 8016 95928tO |
| | : 12. NUMBER OF HOURS'EACTOR WAS CRITICAL e 0 6233t7 70806.4 13t REACTOR RESERVE SHUTDOWN HOURS OtO 0.0 20~t3 i4. HOURS GENFRATQR ON-LINE 728.0 6079tO 70234t6 15, UNIT RESERVE SHUTDOWN HOURS 0 0 39t3 1'6. GROSS THERMAL ENERGY, GENERATED (MWH) 1937190 16155399 179374 90 |
| | : 17. GROSS ELECTRICAL ENERGY GERERATED .(MWH) 647140 53?7920 58863065 |
| | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) '14715 5088109 55573932 |
| | : 19. UNXT SERVICE. FACTOR 100tO 75.8 73.2 20, UNXT AVAXLABIL'XTYFACTOR 100tO 75t8 73t3 21t CAPACITY FACTOR (USING MDC,NET) 10it8 75t7 72t2 |
| | : 2. CAPACXTY F*CTOR <USXNG DER NET) 102t9 76.5 70t9 |
| | : 23. UNIT FORCED OUTAGE RATE'4. |
| | 0 4.7 I 40 I SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS |
| | : 25. IF SHUT DOWN AT END OF REPORT PERIOD~ ESTIMATED DATE OF STARTUP: |
| | '8802220,145 05000250 880216'DR ADOCK R ,. DCD |
| | |
| | 1l hl |
| | |
| | Corrected CopV OPERATING DATA REPORT DOCVET NO 50 389 DATE 12/14/87 COMPLETED BY N'. W. GRANT TELEPHONE 305/694/4432 OPERATXNG STATUS io UNIT NAME: STi LUCIE UNIT 2 REPORTXNG PERTOD:NOVEMBER 1987 |
| | : 3. LICENSED THERMAL POWER (MWT)o ~700 NAMEPLATE RATXNG <GROSS MWE) ~ 850 |
| | : 5. DESIGN FLECTRXCAL RATING (NET MWE): 830 |
| | : 6. MAXXMUM DEPENDABLE CAPACITY (GROSS MWE)o 882 |
| | : 7. MAXXMUM DEPENDABLE CAPACITY <NET MWE)e 839 |
| | : 8. IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) |
| | SINCE LAST REPORT~ GIVE REASONS', |
| | POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE) 10m REASONS FOR RESTRICTIONS'F ANY+ |
| | MONTHLY -YTD- CUMULATIVE |
| | : 11. HOURS XN REPORT PERIODS 720 8016 37825.0 |
| | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL 104+4 6640+9 32016.5 |
| | : 13. REACTOR RESERVE SHUTDOWN HOURS OiO OiO 0+0 14m HOURS GENERATOR ON-LINE 44+9 6477o9 31305i7 15+ UNIT RESERVE SHUTDOWN HOURS 0 0 0 lb. GROSS THERMAL ENERGY GENERATED (MWH) 44019 17046286 81084187 |
| | : 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 12610 5652230 27046380 |
| | : 18. NET ELECTRXCAI ENERGY GENERATED (MWH) "2005 5341510 25559114 |
| | : 19. UNXT SERVICE FACTOR 6+2 80i8 82+8 |
| | : 20. UNXT AVAXLABXLXTYFACTOR 6+2 80+8 82)8 |
| | : 21. CAPACITY FACTOR (USXNG MDC NET) Oi3 79i4 82+6 22'*PACXTY FACTOR (USING DER NET) Oi3 80i3 82i4 |
| | : 3. UNIT FORCED OUTAGE RATE .74. 3 |
| | : 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 2, . XF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP l 12/3/87 |
| | |
| | 0 Ql a~}} |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
Corrected Copy
'
OF'ERATXNG DATA REPORT DOCI<ET NO 50 335 DATE 12/14/87 COMF'LETED BY N, W. GRANT TELEF'HONE 305/694/4432 OPERATXNG STATUS
- 1. UNIT NAME: ST. LUCXE
'30 UNXT 1
- 2. REPORTING PERXQD:NOVEMBER 1987 3 t LICENSED THERMAL POWER ( MWT ): 2700 4t NAMEPlATE RATING (GROSS MWE)t 850 5 DESXGN ELECTRICAL RATXNG (NET MWE)
- h. 'MAXIMUM DFPENDABLE CAPACITY <GROSS MWE) t 872
- 7. MAXXMUM DEPENDABLE CAF'ACXTY (NET MWE)t'39 7)
- 8. IF CHANGES OCCUR IN C*F'ACITY RATINGS (ITEMS NUMBER 3 THROUGH SINCE LAST REPORT ~ GXVE RE*SONS:
POWER LEVEL TQ WHICH RESTRICTED~ XF ANY. (NET MWE) 10t RE*SONS FOR RESTRXCTIONSD XF ANY:
MONTHLY - YTD- CUMULATIVE 11 . HOURS IN REPORT PERIOD l. 720 8016 95928tO
- 12. NUMBER OF HOURS'EACTOR WAS CRITICAL e 0 6233t7 70806.4 13t REACTOR RESERVE SHUTDOWN HOURS OtO 0.0 20~t3 i4. HOURS GENFRATQR ON-LINE 728.0 6079tO 70234t6 15, UNIT RESERVE SHUTDOWN HOURS 0 0 39t3 1'6. GROSS THERMAL ENERGY, GENERATED (MWH) 1937190 16155399 179374 90
- 17. GROSS ELECTRICAL ENERGY GERERATED .(MWH) 647140 53?7920 58863065
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) '14715 5088109 55573932
- 19. UNXT SERVICE. FACTOR 100tO 75.8 73.2 20, UNXT AVAXLABIL'XTYFACTOR 100tO 75t8 73t3 21t CAPACITY FACTOR (USING MDC,NET) 10it8 75t7 72t2
- 2. CAPACXTY F*CTOR <USXNG DER NET) 102t9 76.5 70t9
- 23. UNIT FORCED OUTAGE RATE'4.
0 4.7 I 40 I SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD~ ESTIMATED DATE OF STARTUP:
'8802220,145 05000250 880216'DR ADOCK R ,. DCD
1l hl
Corrected CopV OPERATING DATA REPORT DOCVET NO 50 389 DATE 12/14/87 COMPLETED BY N'. W. GRANT TELEPHONE 305/694/4432 OPERATXNG STATUS io UNIT NAME: STi LUCIE UNIT 2 REPORTXNG PERTOD:NOVEMBER 1987
- 3. LICENSED THERMAL POWER (MWT)o ~700 NAMEPLATE RATXNG <GROSS MWE) ~ 850
- 5. DESIGN FLECTRXCAL RATING (NET MWE): 830
- 6. MAXXMUM DEPENDABLE CAPACITY (GROSS MWE)o 882
- 7. MAXXMUM DEPENDABLE CAPACITY <NET MWE)e 839
- 8. IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT~ GIVE REASONS',
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE) 10m REASONS FOR RESTRICTIONS'F ANY+
MONTHLY -YTD- CUMULATIVE
- 11. HOURS XN REPORT PERIODS 720 8016 37825.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 104+4 6640+9 32016.5
- 13. REACTOR RESERVE SHUTDOWN HOURS OiO OiO 0+0 14m HOURS GENERATOR ON-LINE 44+9 6477o9 31305i7 15+ UNIT RESERVE SHUTDOWN HOURS 0 0 0 lb. GROSS THERMAL ENERGY GENERATED (MWH) 44019 17046286 81084187
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 12610 5652230 27046380
- 18. NET ELECTRXCAI ENERGY GENERATED (MWH) "2005 5341510 25559114
- 19. UNXT SERVICE FACTOR 6+2 80i8 82+8
- 20. UNXT AVAXLABXLXTYFACTOR 6+2 80+8 82)8
- 21. CAPACITY FACTOR (USXNG MDC NET) Oi3 79i4 82+6 22'*PACXTY FACTOR (USING DER NET) Oi3 80i3 82i4
- 3. UNIT FORCED OUTAGE RATE .74. 3
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 2, . XF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP l 12/3/87