ML20235E345: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 2: | Line 2: | ||
| number = ML20235E345 | | number = ML20235E345 | ||
| issue date = 09/29/1972 | | issue date = 09/29/1972 | ||
| title = Forwards Util | | title = Forwards Util Providing Info Re Availability & Reliability of HPCI Sys for Dresden Units 2 & 3 & Quad Cities Units 1 & 2 | ||
| author name = Skovholt D | | author name = Skovholt D | ||
| author affiliation = US ATOMIC ENERGY COMMISSION (AEC) | | author affiliation = US ATOMIC ENERGY COMMISSION (AEC) | ||
Line 12: | Line 12: | ||
| case reference number = FOIA-87-111 | | case reference number = FOIA-87-111 | ||
| document report number = NUDOCS 8709280075 | | document report number = NUDOCS 8709280075 | ||
| title reference date = 09-15-1972 | |||
| package number = ML20235B311 | | package number = ML20235B311 | ||
| document type = CORRESPONDENCE-LETTERS, INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE, NRC TO ACRS | | document type = CORRESPONDENCE-LETTERS, INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE, NRC TO ACRS |
Latest revision as of 17:16, 20 March 2021
Category:CORRESPONDENCE-LETTERS
MONTHYEARSVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999
[Table view]Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action ML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20211Q7961999-09-0909 September 1999 Forwards Correction to Administrative Error on Page 8 of NRC Insp Repts 50-254/99-16 & 50-265/99-16,transmitted by Ltr, ML20211Q6511999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Quad Cities Operator License Applicants During Wk of 000327.Validation of Exam Will Occur at Station During Wk of 000306 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F8251999-08-25025 August 1999 Forwards Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Insp Evaluated Effectiveness of Maint Rule Program & Review Periodic Evaluation Specifically Required for 10CFR50.65 ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211D1491999-08-19019 August 1999 Forwards Insp Repts 50-254/99-16 & 50-265/99-16 on 990719-22.Staff Identified Major Discrepancy Re Accuracy of Data Submitted to NRC for Protected Area Security Equipment Performance ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program SVP-99-170, Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety1999-08-13013 August 1999 Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML20210T9941999-08-13013 August 1999 Forwards Insp Repts 50-254/99-12 & 50-265/99-12 on 990628-0716.Violations Noted SVP-99-154, Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated1999-08-13013 August 1999 Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated SVP-99-147, Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl1999-08-13013 August 1999 Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl ML20210R7451999-08-13013 August 1999 Forwards Insp Repts 50-254/99-11 & 50-265/99-11 on 990601-0720.NRC Identified Several Issues Which Were Categorized as Being of Low Risk Significance.Two Issues Involved NCVs of Regulatory Requirements ML20210R9541999-08-10010 August 1999 Informs That During 990804 Telcon Between J Bartlet & M Bielby,Arrangements Were Made for NRC to Insp License Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210M5461999-08-0606 August 1999 Discusses 990804 Telcon Between J Bartlet & M Bielby,Where Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wks of 991018 & 25 ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210L1061999-08-0202 August 1999 Forwards Insp Rept 50-010/99-13 on 990702-27.No Violations Noted.Insp Examined Activities in Areas of Facility Management & Control & Radiological Safety ML20210L8371999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor-Operated Valves ML20210M4691999-07-30030 July 1999 Forwards Insp Repts 50-254/99-14 & 50-265/99-14 on 990713-15.One NCV Was Identified & Discussed in Encl Insp 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed1999-07-29029 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed ML20210H4661999-07-29029 July 1999 Forwards Insp Repts 50-254/99-13 & 50-265/99-13 on 990628-0702.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records, Observations of Activities & Interviews with Personnel SVP-99-151, Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 21999-07-23023 July 1999 Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-150, Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept1999-07-23023 July 1999 Forwards Responses to 990520 RAI Re Annual 10CFR50.46 Rept SVP-99-146, Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 9906251999-07-21021 July 1999 Informs of Termination of License SOP-31132-1,for G Green, as Required by 10CFR50.74(b).Individual Was Removed from License Duty on 990625 ML20210D2961999-07-20020 July 1999 Forwards Corrected Info for DNPS Unit 3 MOR for June 1999. Year-to Date Forced Outage Hours Should Have Read 70 Hours Instead of 0 on Page 8.Error Also Affected Cumulative Forced Outage Hours Which Should Have Been 24,761 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196K3231999-06-30030 June 1999 Informs That Effective 990703,NRC Project Management Responsibility for Dresden,Unit 1 Station Will Be Transferred to P Ray ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes SVP-99-139, Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage1999-06-30030 June 1999 Forwards Revised Action 2 & Associated TS Bases Changes, Describing Specific Alternate Method for Determining Drywell Floor Drain Sump Leakage ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 05000265/LER-1999-002, Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action1999-06-25025 June 1999 Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action SVP-99-066, Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested1999-06-25025 June 1999 Informs That J Reed,License SOP-31034-1,was Removed from License Duty in 990618.Termination of License Is Requested SVP-99-103, Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period1999-06-25025 June 1999 Informs NRC of Results of Subject Evaluation as Committed to in .Evaluation Consisted of Analytically Demonstrating That Cfu Factor for Rv Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period SVP-99-122, Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 9906011999-06-25025 June 1999 Forwards Regulatory Commitment Change Summary Rept, Containing Summary Info from 980601 Through 990601 1999-09-09 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20217A9811999-10-30030 October 1999
[Table view]Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196K5541999-06-10010 June 1999 Forwards Request for Addl Info Re 10CFR50.46(A) Annual Rept. Note to File for TACs MA5336 & MA5337 Supercedes & Closes TACs MA1597,MA1598 & MA4426 ML20206S9241999-05-19019 May 1999 Forwards Insp Plans Re Prairie Island & Quad Cities,Which Identified Insp Activities That Would Be Completed at Facilities Over Next 6 to 12 Months ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205J5971999-04-0707 April 1999 Forwards SER Accepting Util 980910 Proposal to NRC, Requesting Transfer of Indirect Control of Licenses DPR-29 & DPR-30 from Midamerican Energy Holding Co to Calenergy Co, Inc ML20205J5931999-04-0707 April 1999 Informs of Court Cases Pending for California Energy Co in State of California ML20198N9281998-12-30030 December 1998 Notification of 990115 Meeting with Ceco in Rockville, Maryland to Discuss Progress & Actions Being Taken by Quad Cities to Resolve Fire Protection (App R) Issues & to Address Latest IPEEE Risk Evaluations ML20196J8621998-12-0404 December 1998 Discusses Three Plants,Evaluated for Consideration as Abnormal Occurrences & Other Event of Interest.Oconee & Quad Cities Plants Are Being Considered as AOs & Big Rock Point Being Considered as Other Event Interest ML20196H4831998-12-0202 December 1998 Forwards Facility Submitted Outline,Exam Submittal & as Given Operating Exam for Test Administered During Wk of 981026 at Dresden Nuclear Power Station ML20206F3461998-11-25025 November 1998 Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved IA-99-134, Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved1998-11-25025 November 1998 Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved ML20155H5301998-11-0505 November 1998 Notification of 981119 Meeting with Ceco in Rockville,Md to Discuss Progress & Actions Util Taking to Resolve Fire Protection (App R) Issues Since Last Public Meeting on 980910 ML20239A0881998-09-0202 September 1998 Notification of 980910 Meeting W/Util in Rockville,Md to Discuss Progress & Actions Quad Cities Taking to Resolve Fire Protection (App R) Issues Since Closure of CAL on 980522 ML20237E4261998-08-27027 August 1998 Notification of 980909 Meeting W/Calenergy Co,Midamerican Energy Co & Commonwealth Edison Co in Rockville,Md to Discuss Proposed Merger of Midamerican Energy Holdings Co & Calenergy Co,Inc & Requirements of 10CFR50.80 for Transfer ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20236V5021998-07-30030 July 1998 Notification of 980819 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Inclusion of Emergency Core Cooling System Flow Measurement Uncertainties at Quad Cities Nuclear Power Station in loss-of-coolant Accident Analyses ML20249B8451998-06-17017 June 1998 Notification of 980723 Meeting W/Util in Morris,Il to Inform Public of Licensee Plans for Decommissioning Plant,Unit 1 ML20249A5991998-06-15015 June 1998 Notification of 980619 Meeting W/Util in Rockville,Md to Discuss Reliance on Containment Overpressure at Quad Cities Np Station in Net Positive Suction Head Calculations for Core Spray & Low Pressure Coolant Injection Pumps ML20248A5991998-05-27027 May 1998 Notification of 980611 Meeting W/Util in Two White Flint North to Discuss Reliance on Containment Overpressure at Quad Cities Nuclear Power Station in Net Positive Suction Head Calculations for Core Spray ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20199E9941998-01-28028 January 1998 Forwards Rev of 980127 Notice of Significant Licensee Meeting W/Location of Meeting Added ML20199E0461998-01-27027 January 1998 Notification of Significant Licensee Meeting W/Util on 980206 to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50,App R Issues & to Discuss Scope & Type of Issues Requiring Review & Approval by NRC ML20199F0151998-01-27027 January 1998 Revised Notification of 980206 Meeting W/Location of Meeting Added,W/Ceco in Lisle,Illinois to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50 App R Issues & Scope & Type of Issues Requiring Review by NRC ML20198A6311997-12-30030 December 1997 Notification of Significant Licensee Meeting W/Util on 980109 in Lisle,Il to Discuss Apparent Violations & Other Issues Identified in NRC Inspection Repts 50-254/97-27 & 50-265/97-27 ML20212B4321997-10-22022 October 1997 Notification of Significant Licensee Meeting W/Util on 971105 in Lisle,Il to Discuss Apparent Violations Described in NRC Ltr to Lw Pearce, ML20211Q8741997-10-16016 October 1997 Notification of Significant Licensee Meeting W/Util on 971028 to Discuss Apparent Violations Described in to Js Perry ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20236N3851997-09-0909 September 1997 Discusses TS Clarification at Quad Cities Re Interpretation of Application of Action 3 of TS 3/4.5.A,in Event High Pressure Cooling Injection Pump Made Inoperable for Surveillance Testing Concurrent W/Inoperable LPCI Pump ML20236N2881997-08-13013 August 1997 Informs of Completed Review of Plant TS 3/4.5.A, ECCS Operating, & Provides Comments Which Addresses Inoperable HPCI Sys,Per Region III 970718 Memo ML20151L7801997-08-0404 August 1997 Notification of 970820 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Comed Response for Quad Cities IPEEE Conceptual Engineering Designs for long-term Resolution for Safe Shutdown Enhancements ML20197B9141997-07-23023 July 1997 Forwards Safety Evaluation Re Concrete Expansion Anchor Safety Factors for High Energy Line Break Restraints,In Response to Region III 960920 Request ML20148D1981997-05-28028 May 1997 Forwards Signed Original of Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately),For Transmittal to Ofc of Fr,For Publication.W/O Encl ML20148D4741997-05-28028 May 1997 Notification of Meeting W/Ce on 970602 in Rockville,Md to Discuss Concerns Addressed in Re Actions That Should Be Considered by CE for Plant,Units 1 & 2,in Response to IPEEE Fire Analysis Results ML20141F4831997-05-19019 May 1997 Notifies of 970522 Meeting W/Util in Rockville,Md to Discuss NRC Recommendations Re Action Which Should Be Considered by Commonwealth Edison for Plant,Units 1 & 2 ML20138J9791997-05-0707 May 1997 Notification of 970520 Meeting W/Commonwealth Edison in Rockville,Md to Discuss Commonwealth Edison Quality Initiatives & Plans for Dry Storage at Dresden ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20137G5911997-03-13013 March 1997 Forwards Safety Evaluation Re Proposed TS Changes to Reflect Transition of Fuel Supplier from GE to Siemens Power Corp at Plants Unit 1 & 2 ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20129K4501996-11-0707 November 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20217A1841996-11-0101 November 1996 Provides Annual Update of Status of Region III Response to Staff Actions Resulting from Diagnostic Evaluation at Quad Cities Nuclear Power Station 1999-09-01 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217A9811999-10-30030 October 1999
[Table view]Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196K5541999-06-10010 June 1999 Forwards Request for Addl Info Re 10CFR50.46(A) Annual Rept. Note to File for TACs MA5336 & MA5337 Supercedes & Closes TACs MA1597,MA1598 & MA4426 ML20206S9241999-05-19019 May 1999 Forwards Insp Plans Re Prairie Island & Quad Cities,Which Identified Insp Activities That Would Be Completed at Facilities Over Next 6 to 12 Months ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205J5971999-04-0707 April 1999 Forwards SER Accepting Util 980910 Proposal to NRC, Requesting Transfer of Indirect Control of Licenses DPR-29 & DPR-30 from Midamerican Energy Holding Co to Calenergy Co, Inc ML20205J5931999-04-0707 April 1999 Informs of Court Cases Pending for California Energy Co in State of California ML20198N9281998-12-30030 December 1998 Notification of 990115 Meeting with Ceco in Rockville, Maryland to Discuss Progress & Actions Being Taken by Quad Cities to Resolve Fire Protection (App R) Issues & to Address Latest IPEEE Risk Evaluations ML20196J8621998-12-0404 December 1998 Discusses Three Plants,Evaluated for Consideration as Abnormal Occurrences & Other Event of Interest.Oconee & Quad Cities Plants Are Being Considered as AOs & Big Rock Point Being Considered as Other Event Interest ML20196H4831998-12-0202 December 1998 Forwards Facility Submitted Outline,Exam Submittal & as Given Operating Exam for Test Administered During Wk of 981026 at Dresden Nuclear Power Station IA-99-134, Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved1998-11-25025 November 1998 Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved ML20206F3461998-11-25025 November 1998 Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved ML20155H5301998-11-0505 November 1998 Notification of 981119 Meeting with Ceco in Rockville,Md to Discuss Progress & Actions Util Taking to Resolve Fire Protection (App R) Issues Since Last Public Meeting on 980910 ML20239A0881998-09-0202 September 1998 Notification of 980910 Meeting W/Util in Rockville,Md to Discuss Progress & Actions Quad Cities Taking to Resolve Fire Protection (App R) Issues Since Closure of CAL on 980522 ML20237E4261998-08-27027 August 1998 Notification of 980909 Meeting W/Calenergy Co,Midamerican Energy Co & Commonwealth Edison Co in Rockville,Md to Discuss Proposed Merger of Midamerican Energy Holdings Co & Calenergy Co,Inc & Requirements of 10CFR50.80 for Transfer ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237A3611998-08-12012 August 1998 Staff Requirements Memo Re Briefing on Operating Reactors & Fuel Facilities on 980729 in Rockville,Maryland.Relative to Discussion About Quad-Cities,Commission Requested Addl Info on Schedule for Permanent Fire Protection Issues ML20236V5021998-07-30030 July 1998 Notification of 980819 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Inclusion of Emergency Core Cooling System Flow Measurement Uncertainties at Quad Cities Nuclear Power Station in loss-of-coolant Accident Analyses ML20249B8451998-06-17017 June 1998 Notification of 980723 Meeting W/Util in Morris,Il to Inform Public of Licensee Plans for Decommissioning Plant,Unit 1 ML20249A5991998-06-15015 June 1998 Notification of 980619 Meeting W/Util in Rockville,Md to Discuss Reliance on Containment Overpressure at Quad Cities Np Station in Net Positive Suction Head Calculations for Core Spray & Low Pressure Coolant Injection Pumps ML20248A5991998-05-27027 May 1998 Notification of 980611 Meeting W/Util in Two White Flint North to Discuss Reliance on Containment Overpressure at Quad Cities Nuclear Power Station in Net Positive Suction Head Calculations for Core Spray ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20199E9941998-01-28028 January 1998 Forwards Rev of 980127 Notice of Significant Licensee Meeting W/Location of Meeting Added ML20199F0151998-01-27027 January 1998 Revised Notification of 980206 Meeting W/Location of Meeting Added,W/Ceco in Lisle,Illinois to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50 App R Issues & Scope & Type of Issues Requiring Review by NRC ML20199E0461998-01-27027 January 1998 Notification of Significant Licensee Meeting W/Util on 980206 to Discuss Licensee Update of Methodology & Technical Resolutions to Current 10CFR50,App R Issues & to Discuss Scope & Type of Issues Requiring Review & Approval by NRC ML20198A6311997-12-30030 December 1997 Notification of Significant Licensee Meeting W/Util on 980109 in Lisle,Il to Discuss Apparent Violations & Other Issues Identified in NRC Inspection Repts 50-254/97-27 & 50-265/97-27 ML20212B4321997-10-22022 October 1997 Notification of Significant Licensee Meeting W/Util on 971105 in Lisle,Il to Discuss Apparent Violations Described in NRC Ltr to Lw Pearce, ML20211Q8741997-10-16016 October 1997 Notification of Significant Licensee Meeting W/Util on 971028 to Discuss Apparent Violations Described in to Js Perry ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20236N3851997-09-0909 September 1997 Discusses TS Clarification at Quad Cities Re Interpretation of Application of Action 3 of TS 3/4.5.A,in Event High Pressure Cooling Injection Pump Made Inoperable for Surveillance Testing Concurrent W/Inoperable LPCI Pump ML20236N2881997-08-13013 August 1997 Informs of Completed Review of Plant TS 3/4.5.A, ECCS Operating, & Provides Comments Which Addresses Inoperable HPCI Sys,Per Region III 970718 Memo ML20151L7801997-08-0404 August 1997 Notification of 970820 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Comed Response for Quad Cities IPEEE Conceptual Engineering Designs for long-term Resolution for Safe Shutdown Enhancements ML20197B9141997-07-23023 July 1997 Forwards Safety Evaluation Re Concrete Expansion Anchor Safety Factors for High Energy Line Break Restraints,In Response to Region III 960920 Request ML20148D1981997-05-28028 May 1997 Forwards Signed Original of Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately),For Transmittal to Ofc of Fr,For Publication.W/O Encl ML20148D4741997-05-28028 May 1997 Notification of Meeting W/Ce on 970602 in Rockville,Md to Discuss Concerns Addressed in Re Actions That Should Be Considered by CE for Plant,Units 1 & 2,in Response to IPEEE Fire Analysis Results ML20141F4831997-05-19019 May 1997 Notifies of 970522 Meeting W/Util in Rockville,Md to Discuss NRC Recommendations Re Action Which Should Be Considered by Commonwealth Edison for Plant,Units 1 & 2 ML20138J9791997-05-0707 May 1997 Notification of 970520 Meeting W/Commonwealth Edison in Rockville,Md to Discuss Commonwealth Edison Quality Initiatives & Plans for Dry Storage at Dresden ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20137G5911997-03-13013 March 1997 Forwards Safety Evaluation Re Proposed TS Changes to Reflect Transition of Fuel Supplier from GE to Siemens Power Corp at Plants Unit 1 & 2 ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20129K4501996-11-0707 November 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 1999-09-01 Category:NRC TO ACRS MONTHYEARML20205T6491988-11-0707 November 1988
[Table view]Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20154P3961988-09-27027 September 1988 Forwards Info in Preparation for ACRS Subcommittee on Safeguards & Security 881006 Meeting.Encls Withheld (Ref 10CFR2.790) ML20154N9681988-05-25025 May 1988 Recommends That ACRS Begin Review Schedules Upon Agreement That Viable Util Restart Plan Established & That ACRS Consider Subcommittee Site Visit & Meeting in Early Jul Followed by Full Committee Meeting in mid-Jul ML20154P0671988-04-28028 April 1988 Requests Close Coordination W/Edo to Ensure That Review of Shutdown Nuclear Power Plants Complete IR 05000528/19850121985-09-25025 September 1985 Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986 ML20197J6941985-05-0202 May 1985 Forwards Addl Info in Response to 850226 Request Re Emergency Evacuation Procedures During Seismic Events from Other Countries & Earthquake Emergency Planning Studies. W/O Encl ML20140E6851985-02-12012 February 1985 Discusses Followup Items of 841101-03 ACRS 295th Meetings, Per 841204 Memo.Seismic Design Margin Program Expected to Be Completed by FY86.Addl Sys Interaction Studies at Facility Would Not Result in Significant Improvement in Risk ML20054G5821982-06-15015 June 1982 Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components ML20140G9281982-04-0909 April 1982 Forwards,For Review,Seismic site-specific Spectra Info,Per Telcon & Request by D Okrent.Comments Will Determine Discussion Topics at ACRS Subcommittee on Midland 820520-21 Meetings ML20235C4011978-07-17017 July 1978 Informs That on 740821,agreement Reached to Assist Arcs in Early Identification of Potential Problem Areas & Potentially Difficult Novel Features for Each Application. Comparison of Principal Design Characteristics of NSSS Encl ML20137D8811978-06-14014 June 1978 Responds to ACRS 770117 & 0217 Recommendations for Review of Sys Design for Safe Shutdown & Shutdown Heat Removal to Assure Adequate Seismic Design Margins.Final Rept Will Be Developed Based on Current Available Info ML20137D6411978-03-0808 March 1978 Forwards Case Responding to Allen Re Seismicity in Region of Facilities ML20137D5761978-03-0101 March 1978 Forwards J Allen Ltr to L Reiter Re Seismicity in Site Region,Per Request ML20235C9441975-09-23023 September 1975 Assesses Plant Application for Ol,Per 740821 Agreement to Render Technical Assistance.No Const or Licensing Delays Anticipated Pending Resolution of Concern Re Dynamic Loads on Containment Resulting from LOCA & Relief Valve Action ML20235F6371975-01-30030 January 1975 Submits Comments on Technical Issues Addressed in Lj Koch to WR Stratton,Recommending That ACRS Reconsider Position on High Pressure Testing of Drywell Structure Described in ACRS on Allens Creek Station ML20155F0011974-01-12012 January 1974 Forwards Responses to Inquiries for Use by Subcommittee Prior to 740117-18 Meeting.Responses Will Form Basis for Further Discussions W/Staff ML20235E9251972-12-21021 December 1972 Forwards to Applicants Re Consequences of Postulated Pipe Failures Outside Containment Structure ML20235E9141972-12-0808 December 1972 Forwards Util Re Reporting Requirements of Tech Specs for Listed Plants & to Util Re QA Program for Listed Plants ML20235E6651972-11-16016 November 1972 Forwards to Util Requesting That Analyses Be Performed Re Changes in Shape of Scram Reactivity Curve & Requesting Addl Info Concerning Valve Failures ML20235E3451972-09-29029 September 1972 Forwards Util Providing Info Re Availability & Reliability of HPCI Sys for Dresden Units 2 & 3 & Quad Cities Units 1 & 2 ML20235D5771972-02-17017 February 1972 Forwards Div of Reactor Licensing & 720124 Discussion & Conclusions Re 20% Operation of Plant for ACRS Info ML20235C1481971-12-29029 December 1971 Transmits Div of Reactor Licensing ,Which Requests Addl Info on Design Features of Energy Absorbing Sys,As Info for ACRS ML20235E2911971-10-26026 October 1971 Forwards Div of Reactor Licensing 711018 Request for Rept on Large Number of Unusual Occurrences During Operation of Plant,For Info ML20235E1791971-10-26026 October 1971 Forwards Util 711005 Rept of 710905 & 09 Occurrences & 711018 Transmittal of Summary of HPCI Problems Experienced During Startup Testing at Monticello Plant ML20235D8641971-10-0404 October 1971 Forwards Util 710915,24 & 28 Ltrs Re Inoperable HPCI Sys on 710904,failure of ECCS Pump on 710915 & 710918 Occurrence Involving HPCI Sys,Respectively ML20235E5961971-08-20020 August 1971 Forwards Rept to ACRS Re Wh Zimmer Nuclear Power Station Unit 1 CP Review, for Review ML20235B7021971-06-21021 June 1971 Forwards Util 710526 & 0611 Ltrs Transmitting Amends 11 & 12,respectively to Application for License.Amends 11 & 12 Also Encl ML20235D5101971-06-11011 June 1971 Transmits Util Reporting Unusual Occurrences on 710420,26 & 0502 ML20235D1591971-05-11011 May 1971 Transmits Util Re Occurrence Relating to off-gas Monitors & Util Reporting AO Relating to Safety/ Relief Valve Setting Exceeding 1,080 Psig ML20235C8321971-05-0101 May 1971 Forwards Util 710428 Twx Advising That HPCI Sys Became Inoperable on 710422 & Div of Reactor Licensing Advising That Plant Must Be Shut Down,For Info ML20235D9111971-04-22022 April 1971 Forwards Div of Reactor Licensing 710407 Request for Addl Info for Review of Design Repts 7 & 8 ML20235D8921971-03-11011 March 1971 Forwards Util Transmitting Design Rept 8, Small Steam Line Break, for Info ML20235D7571971-02-17017 February 1971 Forwards Util Summarizing Status of Items on Structural Design ML20235F1651970-12-0101 December 1970 Forwards Design Repts in Response to ACRS Concerns on Containment Analysis & Seismic & Structural Design ML20235B6561970-11-0505 November 1970 Forwards Preliminary Rept to ACRS, for Review.Rept Presents Preliminary Comments on Proposed Plant ML20235C6491970-09-0202 September 1970 Forwards AEC Re Util Request for Reduction of Design Pressure for Drywell & Torus of Containments ML20235C5651970-08-11011 August 1970 Forwards Util Transmitting Rept Containing Addl Info on Pressure Suppression Concept in Response to 700427 & 0528 Ltrs ML20235C5091970-06-0101 June 1970 Forwards AEC Requesting Addl Info Re Proposed Reduction in Design Pressure for Containment Drywell & Torus for Plant ML20235C4121970-05-27027 May 1970 Forwards Util Transmitting GE Rept Entitled, Addl Info Pressure Suppression Concept Test Data Rept, for Review.Util Requested That Rept Be Withheld from Public Disclosure ML20235C3691970-05-0404 May 1970 Forwards Listed Items,Including Util Transmitting Table for Insertion in Rept on Proposed Containment Design Pressure for Brunswick Steam Electric Plant & AEC 700427 Response to Util Request for Design Change in Containment ML20244E1411970-05-0202 May 1970 Forwards H Denton to RW Staehle Re Recommendations for Course of Action to Be Taken for Repair of Safe Ends on Reactor Vessels of Utils for Committee Use ML20235C2691970-04-30030 April 1970 Forwards Util Informing of Mgt Changes in Company ML20140G9011970-04-28028 April 1970 Forwards 10CFR30-36 & 150,for Info in Connection W/Review of Midland.W/O Encls ML20140G8351970-04-15015 April 1970 Submits Agenda for ACRS Subcommittee on Midland Plant 700424 Meeting in Chicago,Il to Discuss Radioactive Matl in Process Steam,Potential for Subsidence,Seismic Design Criteria, Emergency Plans & Flood Protection Level ML20140G8501970-02-12012 February 1970 Submits Agenda for ACRS Subcommittee on Midland Plant 700424 Meeting in Washington,Dc to Discuss Emergency Plans,Adequacy of ESF & Protection Sys,Containment Design,Silting of ECCS Reservoir & Steam Purity & Monitoring ML20235B8901969-12-0909 December 1969 Forwards Exhibit H of Util CP Application for Facility for Review ML20235B7541969-11-24024 November 1969 Forwards Div of Reactor Licensing 691124 Rept Concerning AEC Review of Util Facility for ACRS Review at Dec Meeting ML20235B7301969-11-20020 November 1969 Forwards 691119 Amend 9 to License Application for Review. W/O Encl ML20235B6491969-11-0404 November 1969 Forwards S&W Forwarding Proprietary SWND-2, Loctvs,Computer Code to Determine Pressure & Temp Response of Pressure Suppression Containments to LOCA & Util Requesting Rept Be Withheld for Review ML20235B7141969-10-0808 October 1969 Forwards AEC to Util Requesting Identification of Reactor Protection Sys & Instrumentation Sys That Initiate or Control ESFs Which Will & Will Not Be Designed to Meet IEEE-279 Requirements for Review 1988-09-27 |
Text
. _ _ _ _ _ _ _ _
~
t
, **+,,, '
UNITED STATES (
- ATOMIC ENERGY COMMISSION l
'I -
- d' I WASHWGTON. D.C. 20M5 September 29, 1972 i
i Do - ' s. 50-237, 50-249,
, 50-2 4 and 50-265 Dr. Chester P. Siess Chaiman, Advisory Corrrattee on Beactor Safeguards U. S. Atomic Ehergy Conrnission Washington, D. C. 20545
Dear Dr. Siess:
Sixteen (16) copies of the followin6 are transmitted for the Corrrnittee's inforanation:
1.etter'from Commonwealth Edison Company dated September 15, 1972, forwarding information regarding the availability and reliability of the high pressure coolant injection systems for Dresden Units 2 and 3 and Quad-Cities Units 1 and 2.
Sincemly,
/ / Y Donald J. ovnolt
' Assistant Director for '
Operating Beactors Dimotorate of Licensing Ehclosures: '"
As stated i
dl 8709280075 07092* /)'
MENZ87-111 PDR 9
- _ _ _ ._