ML20196H849

From kanterella
Jump to navigation Jump to search
Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999
ML20196H849
Person / Time
Site: Salem, Harris, Hope Creek, Cooper, Sequoyah, Prairie Island, Quad Cities, Fort Calhoun, FitzPatrick  Constellation icon.png
Issue date: 06/28/1999
From: Frahm R
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
Shared Package
ML20196H853 List:
References
NUDOCS 9907070021
Download: ML20196H849 (1)


Text

p June 28, 1999, t

i~

l MEMORANDUM TO: File  !

FROM: Ronald K. Frahm, Jr., Reactor Operations Engineer l Inspection Program Branch (Original signed by:)

Division of Inspection Program Management Office of Nuclear Reactor Rem?ation 4

SUBJECT:

PERFORMANCE INDICATOR DATA SUBMITTAL FOR THE REVISED REACTOR OVERSIGHT PROCESS PILOT PROGRAM - JUNE 1999 REPORT The June 1999 performance indicator (PI) data report for the Revised Reactor Oversight Process Pilot Program is attached. This report constitutes the second monthly Pi data submittal from pilot plant licensees, which includes data through May 1999, for the 13 units at the 9 pilot sites. The first monthly Pi data submittal was sent to the Public Document Room via mrmorandum dated June 14,1999. For each of the 13 pilot units, the data will be presented in tabular form for each indicator, with a trend chart of the data. Each monthly report will include data through the p.'evious month, and will be presented quarterly. For example, the June 1999 report includes data through May 1999 (i.e., two-thirds of the second quarter 1999), while the July 1999 report will include data through June 1999 (i.e., the complete second quarter 1999).

Hard copies of monthly reports will be placed in the Public Document Room, and current plans

, are to post the pilot plant PI data on the NRC External Web Page starting with the July or August 1999 submittals. Upon completion of the pilot program and fullimplementation of the Revised Reactor Oversight Process, Pl data will be reported from all reactor licensees on a quarterly basis, and will be made publicly available through both the Public Document Room and the NRC External Web Page.

Attachment:

As stated l

Distribution. M g j ~ ; )' '.7 h PUBLIC Central Files }/

gi[

llPB R/F 4

0< r1- 8 l [ 0 DdCUMENT NAME: A:\Pl699PDR.WPD

  • See previous concurrence.

To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy N -

OFFICE llPB:DIPM C llPB:DIPM lLa llPB:DI A Je f l l NAME RKFrahm 1(M MRJohnsonM WMDeanM DATE 06/ 2,7 /99 06/ % /99 V 06 M 99 \ \

OFFICIAL RECORD COPY ' N 9907070021 990628 PDR ADOCK 05000254 P PDR u_