ML20235C269

From kanterella
Jump to navigation Jump to search
Forwards Util Informing of Mgt Changes in Company
ML20235C269
Person / Time
Site: Brunswick, 05000000
Issue date: 04/30/1970
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Hendrie J
Advisory Committee on Reactor Safeguards
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8709240403
Download: ML20235C269 (1)


Text

...

)

=

)

APR 3 01970 Distribution:

(2 Wa-='-'O Docket fj,h BWR-1 File i

I f

R. S. Boyd Dockets No. 50-32(v'j, S. M. Kari W. Butler and 50-325 Dr. Joseph M. Hendrie i

Chairman, Advisory Committee on Reactor Safeguards U. S. Atomic Energy Commission Washington, D. C.

20545

Dear Dr. Hendrie:

Three copies of the following are transmitted for the information of the Committee:

i l

1 1

CAROLINA POWER & LIGHT @ ANY l

(Bnanswick steam Electric Plant Unite 1 & 2) q t

i Carolina Power & Light letter,, dated April 17, 1970, concerning l

management changes in company.

I I

l l

l 1

Sincerely, Peter A. Morris, Director

{

Division of Reactor Licensing

Enclosures:

As state (3) g DRL/

-1 DRL/BWR-1 D G/A WR omcr >

SMKal a

D AS J

sumur >

4/30/70 j.,/ p/70,

,g /70,,

j om>

p.= Asc-sio gnev.s.m Ascu one

, nix-,c..

i j

B709240403 870921 i

PDR FDIA MEN 287-111 PDR

E'

( A*

Carolina Power & Light Company Raleigh, North Carolina 27602 35 5

i: b o

> m;l April 17, 1970 hN El p,

0 7 bh.h M

i W:&

= =,

l S'S

' E j$ -

Q Dr. Peter.A. Morris, Director Division of Reactor Licensing U.4. Atomic Energy Commission Washington, D'. C.

20545 File

Re: Docket Nos. 50 Regulatory 50-325

Dear Dr. Morris:

We wish to inform you of changes we are making in the management of our

. Company which affect the information we have filed in our H. B. Robinson Unit No. 2 and Brunswick Units Nos. I and 2 applications.

Effective May 1,1970, Mr. J. A. Jones, who has headed the Power Supply Department, is appointed to the newly created position of Assistant Group Executive for Engineering & Operations. He will serve in this capacity until November 1, 1970, at which time he will succeed Mr. P. S.

Colby as Group Executive.

The present Power Supply Department will be divided as of May 1,1970.

Mr. E. E. Utley has been appointed as Manager of the Generation & System Operations Department, and Mr. W. B. Kincaid has been appointed as Manager of the Plant Design & Construction Department. Both of these departments report to the Group Executive.

l The Technical Services Section will report to Mr. Utley.

Its functions and responsibilities are unchanged.

Yours very truly, g,

/M4' j'

,,U APR21 1970 P. S. Colby g

Senior Vice President Engineering & Operations fi l

ORY MNcTIOM I C i

F-occKf1 ctER f

6/

\\

\\

// ; g gM 4

B709240409 B70921 PDR FOIA j

PDR MEN 287-111

(/

- -