ML20203D549: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
| project = TAC:56176
| stage = Other
}}
}}



Latest revision as of 14:15, 7 December 2021

Forwards Vol 2 of Amend 3 to PGE-1041, Dcrdr Summary Rept for Trojan Nuclear Plant
ML20203D549
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/16/1986
From: Lentsch J
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20203D552 List:
References
JWL-377-86, TAC-56176, NUDOCS 8607210246
Download: ML20203D549 (1)


Text

m ammus Portlanc! General Electric Coii,;aiiy July 16, 1986 JWL-377-86 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555

SUBJECT:

TROJAN NUCLEAR PLANT PGE-1041. Volume 2 Enclosed is your copy of Amendment 3 to PGE-1041, " Detailed Control Room Design Review Summary Report", Volume 2. The pages are to be inserted in the subject document in accordance with the instruction sheet accompanying them.

Please acknowledge receipt by completing the lower portion of this transmittal and returning it to the location shown below.

J. . Lentsch, Manager Nuclear Safety & Regulation Document Control Desk ACKNOWLEDGEMENT PGE-1041 Detailed Control Room Design Review Summary Report l Volume 2 l l

I I hereby acknowledge receipt of Controlled Copy Number (s) 18 - 30 of the subject document. All changes have been made in accordance with the instructions and superseded pages have been destroyed or marked either " Void" or " Superseded".

Signature of Copy Holder Date Return to: D. J. Harvey, SB-Bridge Portland General Electric Company 121 S. W. Salmon Street Portland OR 97204 8607210246 860716 '

PDR p

ADOCK 00000344 PDR %h 121 S W Sa: mon St'eet. Port land. Oregon 97204 i