ML20212H448

From kanterella
Jump to navigation Jump to search

Provides Listing & Revised Schedule Dates for Completing Human Engineering Discrepancy Corrective Action
ML20212H448
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/02/1987
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-51212, TAC-56176, NUDOCS 8703060108
Download: ML20212H448 (2)


Text

M M M UM David W. Cockfield Vico President Nuclear March 2, 1987 Trojan Nuclear Plant Docket 50-344 Liconoo NPF-1 U.S. Nuclear Regulatory Comminolon ATTN Docu.nont Control Dook Washington DC 20555 Door Sirl TROJAN NUCLEAR PLANT Detailed Control Room DeclKn Review (DCRDR)

Por our discunolone with Mr. Torence Chan of your staff, the enclooed attachmont providos a listing of Iluman Engincoring Diceropancies (llEDo) that have not boon corrected no scheduled. The attachment providos revised schedulo datoo for completing nach IEED correctivo action.

Wo would be pleaned to discuno thoso !!EDs in dotall during the Plant visit of our NRC DCRDR reviewer on March 17-18, 1987.

Sincoroly, Attachment et Mr. John D. Martin Regional Administrator, Rogion V U.S. Nuclear Regulatory Commission Mr. David Kish, Acting Director Stato of Oregon Department of Energy Mr. Rob Barr j gg NRC Rosident Inapoctor pW/

Trojan Nuclear Plant j Ill 0703060100 070302 PDit ADOCK 05000344 P PDit

. 1;'t S W Mton Ch*t Ibeo t Own 9tm.:

I 1

o Trojan Nuclear Plant Document Control Desk Docket 50-344 March 2, 1987

License NPF-1 Attachment 1

i HUMAN ENGINEERING DISCREPANCIES WITH CORRECTIVE ACTIONS PAST DUE HED Description Rev. Due Date 24, 25, 108 Replace yellow lenses on safety injection 03/13/87 i and Containannt isolation status panels with white ones.

44, 287, 417 Meter banding required on nuclear instru-

1 51 Handwritten scales on Containment 06/01/87 humidity meter and Containment purge vent flow recorder require replacement with printed scale.

59, 173 Minor label changes for condensate demin 03/13/87 flow, process radiation monitors, and caution plate concerning RCS campling )

l following power changes.

83, 105 Paint safety injection Containment isola- 06/01/87 tion, and Containment spray actuation switch handles on C-02 and C-19 bright red.

408 Hear-here booth installed in emergency 03/31/87 diesel generator rooms, but booth phones still require connection to Plant phone l system.

448 Replace RHR flow meter scale face with one 09/01/87 that has less vertical labeling.

  • A comprehensive mater banding data base has been developed for i control room meters as well as others located throughout the Plant.

A long-term implementation strategy la to be agreed upon no later than March 16, 1987, and discuased with NRC DCRDR reviewers during their March visit.

DJM/mr 1115P