| {{#Wiki_filter:Corrected Copy OPERATING DATA REPORT OPERATING STATUS'DOCVET NO 50-335 DATE 10/15/87 COMPLETED.BY N.Wi GRANT'EL'EPHONE 305/694/4432. | | {{#Wiki_filter:Corrected Copy OPERATING DATA REPORT |
| 1+UNXT NAME+'STi LUCIE'UNIT 1 2.REPORTXNG PERIOD:SETEMBER 1987 3i LICENSED THERMAL POWER (MWT)o~700 NAMEPLATE RATXNG (GROSS:MWE)e 850 5i DESIGN ELECTRICAL RATXNG (NET MWE)f 830"6 i'MAXIMUM, DEPENDABLE, CAPACITY (GROSS'WE) | | 'DOCVET NO 50 335 DATE 10/15/87 COMPLETED .BY N. Wi GRANT |
| +872 7, MAXXMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF'CHANGES OCCUR IN.CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE, LAST REPORTS GIVE REASONS: 9,0 POWER, LEVEL TO WHICH RESTRICTED~ | | 'EL'EPHONE 305/694/4432. |
| IF ANY (NET MWE)10 REASONS FOR RESTRICTIONS'r IF.ANY: MONTHLY-YTD-CUMULATIVE five HOURS IN REPORT PERIOD: 1'2 o NUMBER OF'HOURS REACTOR WAS CRITICAL 130 REACTOR RESERVE SHUTDOWN HOURS 14.HOURS'ENERATOR ON-LINE 15.UNIT RESERVE.SHUTDOWN HOURS lb.GROSS THERMAL ENERGY GENERATED (MWH)17+GROSS ELECTRICAL ENERGY'ERERATED (MWH)18.NET ELECTRXCAL ENERGY GENERATED (MWH)19.UNXT SERVXCE FACTOR 28 o UNIT AVAILABILITY. | | OPERATING STATUS 1+ UNXT NAME+ 'STi LUCIE 'UNIT 1 |
| FACTOR i.CAPACXTY FACTOR (USING MDC NET)22'APACITY FACTOR (USING DER NET)23.'UNIT FORCED OUTAGE RATE'HUTDOWNS SCHEDUL'ED OVER,'EXT 6 MONTHS 720 72000 0+0'720.0 0 1933803 633310 600933 180.0 0.100 0 0 99'10006 0: 6551 4983o7 0+0 486207 0 12931'692 4301500 4070015 7402 740 2 74+1 740 9-1'.1)94463.0 69556.4 205+3 69018o4 3''1'76 1'50883 57786645 54555838 73+1 73ii 72 i'0 70+7 3+8.25.IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED.D'ATE OF START'UP: 88022201'29 88021'8'PDR,'A'DOOk'05000250.R......:.:
| | : 2. REPORTXNG PERIOD:SETEMBER 1987 3i LICENSED THERMAL POWER (MWT) o ~700 NAMEPLATE RATXNG (GROSS:MWE)e 850 5i DESIGN ELECTRICAL RATXNG (NET MWE)f 830 "6 i 'MAXIMUM,DEPENDABLE, CAPACITY (GROSS'WE) + 872 7, MAXXMUM DEPENDABLE CAPACITY (NET MWE): 839 |
| 'DC 9 Al J$", W, tf"0'""" I, w*, | | : 8. IF 'CHANGES OCCUR IN. CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7) |
| Corrected Copy OPERATING STATUS OPERATING DATA REPORT DOCVET HO 50-389 DATE 10/15/87 COMF'LETED BY H, H.GRANT TELEPHOHE 305/694/4432 1~UNIT HAME: ST~LUCIE UNIT 2 2.REPORTING F'ERIOD+SETEMBER 1987 3+I ICENSED THERMAL POHER (MWT)t~700 NAMEPLATE RATING (GROSS MME): 850 5.DESIGN ELECTRICAL RATXNG (NET MHE)'830 6, MAXIMUM DEPENDABLE CAPACXTY (GROSS MWE):, 882 7.MAXIMUM DEPENDABLE CAPACITY<HET MHE)f 839 8.XF CHANGES OCCUR IN C*F'ACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LA'ST REPORT~GIVE REASONS+9i POHER LEVEL TO WHICH RESTRICTEDr IF AHY<HET MHE)10.REASONS FOR RESTRICTIONS~ | | SINCE, LAST REPORTS GIVE REASONS: |
| IF ANY'ONTHLY | | 9,0 POWER, LEVEL TO WHICH RESTRICTED~ IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS'r IF .ANY: |
| -YTD-CUMULATIVE 1 1.HOURS IH REPORT PERIOD: 12.NUMBER OF HOURS REACTOR HAS CRXTICAL 13, REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15'+UHIT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED<MHH)17.GROSS ELECTRICAL ENERGY.GERERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MHH)UNIT SERVICE FACTOR 20.UNIT AVAILABILITY F*CTOR 21+CAP*CITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET).3, UNIT FORCED OUTAGE'ATE SHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 720'20)0 OoO 720iO 0 1865652 597 30 564141 100iO 100 i 0'3'94 i 4 0 6551 6488',2 OiO'384i8 0 16894864 5606280 5310853 97i5 97o5 96i6 97+7 2.s l 363'60.0 31863i8 0.0 31212.6 0 80932765 27000430 5528457 85.8 85i8 85.9 85 i 7 7'1 l 25+XF SHUT DOHN.AT EHD OF REPORT PERIOD~ESTIMATED D*TE OF STARTUP+ | | MONTHLY - YTD- CUMULATIVE five HOURS IN REPORT PERIOD: 720 6551 94463.0 1'2 o NUMBER OF 'HOURS REACTOR WAS CRITICAL 72000 4983o7 69556.4 130 REACTOR RESERVE SHUTDOWN HOURS 0+0 0+0 205+3 |
| 0 4l All: LI I>>}} | | : 14. HOURS'ENERATOR ON-LINE '720. 0 486207 69018o4 |
| | : 15. UNIT RESERVE. SHUTDOWN HOURS 0 0 3'' |
| | lb. GROSS THERMAL ENERGY GENERATED (MWH) 1933803 12931'692 1'76 1'50883 17+ GROSS ELECTRICAL ENERGY'ERERATED (MWH) 633310 4301500 57786645 |
| | : 18. NET ELECTRXCAL ENERGY GENERATED (MWH) 600933 4070015 54555838 |
| | : 19. UNXT SERVXCE FACTOR 180.0 0 7402 73+1 28 o UNIT AVAILABILITY.FACTOR .100 0 0 740 2 73ii |
| | : i. CAPACXTY FACTOR (USING MDC NET) 99 ' 74+1 72 i'0 22'APACITY FACTOR (USING DER NET) 10006 740 9- 70+7 |
| | : 23. 'UNIT FORCED OUTAGE 0: 1'.1 3+8 SCHEDUL'ED OVER,'EXT 6 MONTHS RATE'HUTDOWNS ) |
| | .25. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED .D'ATE OF START'UP: |
| | 88022201'29 88021'8 |
| | '05000250 |
| | .R......:.: |
| | 'PDR,' A'DOOk |
| | 'DC 9 |
| | |
| | Al J $ ", W, tf "0 ' """ I, w*, |
| | |
| | Corrected Copy OPERATING DATA REPORT DOCVET HO 50 389 DATE 10/15/87 COMF'LETED BY H, H. GRANT TELEPHOHE 305/694/4432 OPERATING STATUS 1 ~ UNIT HAME: ST ~ LUCIE UNIT 2 |
| | : 2. REPORTING F'ERIOD+ SETEMBER 1987 3+ I ICENSED THERMAL POHER (MWT)t ~700 NAMEPLATE RATING (GROSS MME): 850 |
| | : 5. DESIGN ELECTRICAL RATXNG (NET MHE) ' 830 6, MAXIMUM DEPENDABLE CAPACXTY (GROSS MWE):, 882 |
| | : 7. MAXIMUM DEPENDABLE CAPACITY <HET MHE) f 839 |
| | : 8. XF CHANGES OCCUR IN C*F'ACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7) |
| | SINCE LA'ST REPORT ~ GIVE REASONS+ |
| | 9i POHER LEVEL TO WHICH RESTRICTEDr IF AHY <HET MHE) |
| | : 10. REASONS FOR RESTRICTIONS~ IF ANY'ONTHLY |
| | - YTD- CUMULATIVE 1 1. HOURS IH REPORT PERIOD: 720'20)0 6551 363'60.0 |
| | : 12. NUMBER OF HOURS REACTOR HAS CRXTICAL 6488',2 31863i8 13, REACTOR RESERVE SHUTDOWN HOURS OoO OiO 0.0 |
| | : 14. HOURS GENERATOR ON-LINE 720iO '384i8 31212.6 15'+ UHIT RESERVE SHUTDOWN HOURS 0 0 0 16'ROSS THERMAL ENERGY GENERATED <MHH) 1865652 16894864 80932765 |
| | : 17. GROSS ELECTRICAL ENERGY. GERERATED (MWH) 597 30 5606280 27000430 |
| | : 18. NET ELECTRICAL ENERGY GENERATED (MHH) 564141 5310853 5528457 UNIT SERVICE FACTOR 100iO 97i5 85.8 |
| | : 20. UNIT AVAILABILITYF*CTOR 100 i 97o5 85i8 21+ CAP*CITY FACTOR (USING MDC NET) 0'3' 96i6 85.9 |
| | : 22. CAPACITY FACTOR (USING DER NET) 94 i 4 97+7 85 i 7 |
| | .3, UNIT FORCED OUTAGE'ATE 0 2.s l 7'1 l SHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 25+ XF SHUT DOHN. AT EHD OF REPORT PERIOD ~ ESTIMATED D*TE OF STARTUP+ |
| | |
| | 0 4l All: |
| | LI I>>}} |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
Corrected Copy OPERATING DATA REPORT
'DOCVET NO 50 335 DATE 10/15/87 COMPLETED .BY N. Wi GRANT
'EL'EPHONE 305/694/4432.
OPERATING STATUS 1+ UNXT NAME+ 'STi LUCIE 'UNIT 1
- 2. REPORTXNG PERIOD:SETEMBER 1987 3i LICENSED THERMAL POWER (MWT) o ~700 NAMEPLATE RATXNG (GROSS:MWE)e 850 5i DESIGN ELECTRICAL RATXNG (NET MWE)f 830 "6 i 'MAXIMUM,DEPENDABLE, CAPACITY (GROSS'WE) + 872 7, MAXXMUM DEPENDABLE CAPACITY (NET MWE): 839
- 8. IF 'CHANGES OCCUR IN. CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE, LAST REPORTS GIVE REASONS:
9,0 POWER, LEVEL TO WHICH RESTRICTED~ IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS'r IF .ANY:
MONTHLY - YTD- CUMULATIVE five HOURS IN REPORT PERIOD: 720 6551 94463.0 1'2 o NUMBER OF 'HOURS REACTOR WAS CRITICAL 72000 4983o7 69556.4 130 REACTOR RESERVE SHUTDOWN HOURS 0+0 0+0 205+3
- 14. HOURS'ENERATOR ON-LINE '720. 0 486207 69018o4
- 15. UNIT RESERVE. SHUTDOWN HOURS 0 0 3
lb. GROSS THERMAL ENERGY GENERATED (MWH) 1933803 12931'692 1'76 1'50883 17+ GROSS ELECTRICAL ENERGY'ERERATED (MWH) 633310 4301500 57786645
- 18. NET ELECTRXCAL ENERGY GENERATED (MWH) 600933 4070015 54555838
- 19. UNXT SERVXCE FACTOR 180.0 0 7402 73+1 28 o UNIT AVAILABILITY.FACTOR .100 0 0 740 2 73ii
- i. CAPACXTY FACTOR (USING MDC NET) 99 ' 74+1 72 i'0 22'APACITY FACTOR (USING DER NET) 10006 740 9- 70+7
- 23. 'UNIT FORCED OUTAGE 0: 1'.1 3+8 SCHEDUL'ED OVER,'EXT 6 MONTHS RATE'HUTDOWNS )
.25. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED .D'ATE OF START'UP:
88022201'29 88021'8
'05000250
.R......:.:
'PDR,' A'DOOk
'DC 9
Al J $ ", W, tf "0 ' """ I, w*,
Corrected Copy OPERATING DATA REPORT DOCVET HO 50 389 DATE 10/15/87 COMF'LETED BY H, H. GRANT TELEPHOHE 305/694/4432 OPERATING STATUS 1 ~ UNIT HAME: ST ~ LUCIE UNIT 2
- 2. REPORTING F'ERIOD+ SETEMBER 1987 3+ I ICENSED THERMAL POHER (MWT)t ~700 NAMEPLATE RATING (GROSS MME): 850
- 5. DESIGN ELECTRICAL RATXNG (NET MHE) ' 830 6, MAXIMUM DEPENDABLE CAPACXTY (GROSS MWE):, 882
- 7. MAXIMUM DEPENDABLE CAPACITY <HET MHE) f 839
- 8. XF CHANGES OCCUR IN C*F'ACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LA'ST REPORT ~ GIVE REASONS+
9i POHER LEVEL TO WHICH RESTRICTEDr IF AHY <HET MHE)
- 10. REASONS FOR RESTRICTIONS~ IF ANY'ONTHLY
- YTD- CUMULATIVE 1 1. HOURS IH REPORT PERIOD: 720'20)0 6551 363'60.0
- 12. NUMBER OF HOURS REACTOR HAS CRXTICAL 6488',2 31863i8 13, REACTOR RESERVE SHUTDOWN HOURS OoO OiO 0.0
- 14. HOURS GENERATOR ON-LINE 720iO '384i8 31212.6 15'+ UHIT RESERVE SHUTDOWN HOURS 0 0 0 16'ROSS THERMAL ENERGY GENERATED <MHH) 1865652 16894864 80932765
- 17. GROSS ELECTRICAL ENERGY. GERERATED (MWH) 597 30 5606280 27000430
- 18. NET ELECTRICAL ENERGY GENERATED (MHH) 564141 5310853 5528457 UNIT SERVICE FACTOR 100iO 97i5 85.8
- 20. UNIT AVAILABILITYF*CTOR 100 i 97o5 85i8 21+ CAP*CITY FACTOR (USING MDC NET) 0'3' 96i6 85.9
- 22. CAPACITY FACTOR (USING DER NET) 94 i 4 97+7 85 i 7
.3, UNIT FORCED OUTAGE'ATE 0 2.s l 7'1 l SHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 25+ XF SHUT DOHN. AT EHD OF REPORT PERIOD ~ ESTIMATED D*TE OF STARTUP+
0 4l All:
LI I>>