#REDIRECT [[IR 05000321/1986039]]
{{Adams
| number = ML20211A232
| issue date = 02/06/1987
| title = Forwards Insp Repts 50-321/86-39 & 50-366/86-39 on 861115-21 & Notice of Violation
| author name = Reyes L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Oreilly J
| addressee affiliation = GEORGIA POWER CO.
| docket = 05000321, 05000366
| license number =
| contact person =
| document report number = NUDOCS 8702190122
| package number = ML20211A236
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000321/1986039]]
 
=Text=
{{#Wiki_filter:'
  ,
    4    .                                                                                  %Q
                                                  1987
                                          FE90 6
      Docket Nos. 50-321, 50-366
      License Nos. DPR-57, NPF-5
      Georgia Power Company
      LATTN: Mr. James P. O'Reilly
                Senior Vice President-Nuclear
              Operations-
      P. O. Box 4545
      Atlanta, GA 30302
      Gentlemen:
      SUBJECT: NOTICE OF VIOLATION
                  (NRC INSPECTION REPORT NOS. 50-321/86-39AND50-366/86-39)
      This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
      H. L. Whitener on November 15-21, 1986. The inspection included a review of
      activities authorized for your Hatch facility.        At the conclusion of the
      inspection, the findings were discussed with those members of your staff
      identified in the enclosed inspection report.
      Areas examined during the inspection are identified in the report. Within these
      areas, the inspection consisted of selective examinations of procedures and
      representative records, interviews with personnel, and observation of activities
      in progress.
      The inspection findings indicate that certain activities appeared to violate NRC
      requirements. The violation, references to pertinent requirements, and elements
      to be included in your response are described in the enclosed Notice of Viola-
      tion.
      In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
      Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
      will be placed in the NRC Public Document Room.
      The responses directed by this letter and its enclosures are not subject to the
      clearance procedures of the Office of Management and Budget as required by the
      Paperwork Reduction Act of 1980, PL 96-511.
      Should you have any questions concerning this letter, please contact us.
                                                Sincerely,
                                                    .
    07o2190122 070206                            o @ nal s und W
    PDR    ADOCK 05000321                      Luis A. Reyes
'
    O                    PDR                    Luis A. Reyes, Acting Director
                                                Divition of Reactor Projects
      Enclosures:    (Seepage 2)
                                                                                      5go t  1
                                                                                              '
 
            '
*    '
                                                                      FEB 0 6 587
  Georgia Power Company                  2
  Enclosures:
  1.    Notice of Violation
  2.    NRC Inspection Report
  cc w/encis:
  R. T. Beckham, Vice President, Plant Hatch
  dC C. Nix, Site Operations General
      Manager
  (kf Fraser, Acting Site QA Supervisor
  p Gucwa, Manager, Nuclear Safety
      and Licensing
  bqc w/encis:
  IfRC Resident Inspector
  SNfgh S. Jordan, Executive Secretary
  Document Control Desk
  State of Georgia
  RII                  RII          RI      RII,            I/          RI!g
        itener:es      FJ          ARHerdt      ciera h n.
                                                                  ^
                                                              7._ .... ; s VBrownlee
  1/Jo/87              3/g)87      W 3 /87  VPp /87      2/- A 87        1/q/87
}}

Latest revision as of 05:01, 19 December 2021

Forwards Insp Repts 50-321/86-39 & 50-366/86-39 on 861115-21 & Notice of Violation
ML20211A232
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/06/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20211A236 List:
References
NUDOCS 8702190122
Download: ML20211A232 (2)


See also: IR 05000321/1986039

Text

'

,

4 . %Q

1987

FE90 6

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Company

LATTN: Mr. James P. O'Reilly

Senior Vice President-Nuclear

Operations-

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-321/86-39AND50-366/86-39)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

H. L. Whitener on November 15-21, 1986. The inspection included a review of

activities authorized for your Hatch facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violation, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of Viola-

tion.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

.

07o2190122 070206 o @ nal s und W

PDR ADOCK 05000321 Luis A. Reyes

'

O PDR Luis A. Reyes, Acting Director

Divition of Reactor Projects

Enclosures: (Seepage 2)

5go t 1

'

'

  • '

FEB 0 6 587

Georgia Power Company 2

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encis:

R. T. Beckham, Vice President, Plant Hatch

dC C. Nix, Site Operations General

Manager

(kf Fraser, Acting Site QA Supervisor

p Gucwa, Manager, Nuclear Safety

and Licensing

bqc w/encis:

IfRC Resident Inspector

SNfgh S. Jordan, Executive Secretary

Document Control Desk

State of Georgia

RII RII RI RII, I/ RI!g

itener:es FJ ARHerdt ciera h n.

^

7._ .... ; s VBrownlee

1/Jo/87 3/g)87 W 3 /87 VPp /87 2/- A 87 1/q/87