ML20213F931: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20213F931
| number = ML20213F931
| issue date = 11/14/1986
| issue date = 11/14/1986
| title = Ack Receipt of 861031 Ltr Re Analysis & Followup on Potential Steam Line Breaks in Turbine Bldg,Per NRC 861029 Request
| title = Ack Receipt of Re Analysis & Followup on Potential Steam Line Breaks in Turbine Bldg,Per NRC 861029 Request
| author name = Kirsch D
| author name = Kirsch D
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8611170253
| document report number = NUDOCS 8611170253
| title reference date = 10-31-1986
| package number = ML20213F933
| package number = ML20213F933
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
Line 19: Line 20:
{{#Wiki_filter:.      e 6.
{{#Wiki_filter:.      e 6.
NOV 141986 Docket No. 50-344 Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Attention:    Mr. William J. Lindblad President Gentlemen:
NOV 141986 Docket No. 50-344 Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Attention:    Mr. William J. Lindblad President Gentlemen:
Thank you for your letter dated October 31, 1986, regarding your analysis and followup on potential steam line breaks in the turbine building in response to our request on October 29, 1986. Your actions will be verified during a future inspection.
Thank you for your {{letter dated|date=October 31, 1986|text=letter dated October 31, 1986}}, regarding your analysis and followup on potential steam line breaks in the turbine building in response to our request on October 29, 1986. Your actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Your cooperation with us is appreciated.
Sinces:1Yened by D. f, K:pth Dennis F. Kirsch, Director Division of Reactor Safety and Projects bcc w/ copy of letter dated 10/31/86:
Sinces:1Yened by D. f, K:pth Dennis F. Kirsch, Director Division of Reactor Safety and Projects bcc w/ copy of letter dated 10/31/86:

Latest revision as of 23:51, 4 May 2021

Ack Receipt of Re Analysis & Followup on Potential Steam Line Breaks in Turbine Bldg,Per NRC 861029 Request
ML20213F931
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/14/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Lindblad W
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20213F933 List:
References
NUDOCS 8611170253
Download: ML20213F931 (1)


Text

. e 6.

NOV 141986 Docket No. 50-344 Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Attention: Mr. William J. Lindblad President Gentlemen:

Thank you for your letter dated October 31, 1986, regarding your analysis and followup on potential steam line breaks in the turbine building in response to our request on October 29, 1986. Your actions will be verified during a future inspection.

Your cooperation with us is appreciated.

Sinces:1Yened by D. f, K:pth Dennis F. Kirsch, Director Division of Reactor Safety and Projects bcc w/ copy of letter dated 10/31/86:

RSB/ Document Control Desk (RIDS)

8. Faulkenberry J. Martin J. Zollicoffer Resident Inspector Project Inspector Region V gp + dc^

DPereira/ dot MMendonca AChaffee DKirs h 11/11/86 11/l)-/86 11/I3/86 11/[f/86 8611170253 861114 PDR ADOCK 05000344 1 #^' )J/

O \

PDR

['