ML20236G967

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-344/98-02 on 980601-04.No Violations Noted.Plans to Replace Existing Spent Fuel cooling,make-up Water & clean-up Sys W/New Self Contained Sys Were Discussed W/Staff
ML20236G967
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/01/1998
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20236G971 List:
References
50-344-98-02, 50-344-98-2, NUDOCS 9807070032
Download: ML20236G967 (4)


See also: IR 05000344/1998002

Text

- _ - _ _ - - - - _ - _ _ _ , - - _ _ _ _ _ _ - _ - _ _ _ - - - _ - - - _ _ _ _

.

  1. o

g UNITED STATES

7 [ g NUCLEAR REGULATORY COMMISSION

5 j REGION IV ,

8,,, 611 RYAN PLAZA DRIVE. SUITE 400 l

%, ,o#g ARUNGTON. TEXAS 76011 8364

'

July 1, 1998

)

i

I

,

Stepnen M. Quennoz, Trojan Site

Executive and Plant General Manager

Portland General Electric Company ,

Trojan Nuclear Plant .

!

71760 Columbia River Highway

Rainier, Oregon 9704S

i

SUBJECT: NRC INSPECTION REPORT 50-344/98-02 i

Dear Mr. Quennoz:

On June 4,1998, the NRC completed an inspection at your Trojan Nuclear Plant. The enclosed

report presents the scope and results of that inspection.

t/sjor activities reviewed as part of this inspection included decommissioning and dismantlement

work underway, spent fuel pool technical specification compliance, self-assessment program, i

review of annual radiological and environmental reports, and activities related to the control of

radioactive material being released from the radiologically controlled area. No violations cf NRC

regulations were identified.

During this inspection, plans to replace the existing spent fuel pool cooling, make-up water, and

clean-up systems with a new self contained system were discussed with your staff. The new

system will be dedicated to the spent fuel pool and will allow for the dismantlement of the

existing systems. Because the new system directly effects compliance with severai technical

specifications, the NRC requests notification in writing from you that adequate acceptance and

testing has been completed such that sufficient confidence has been gained in the operability

and availability of the new system to perform it's intended furection. This request w:ss discussed

. with you during our phone conversation on June 4,1S98, and with your staff during the exit

meeting later that day. Please provide the written notification to this office, Attn:

Ross A. Scarano, prior to initiating dismaritlement of the current system.

')

in accordance with 10 CFR 2.790 of the 'NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room (POR}.

9807070032 980701 o

gDR ADOCK 05000344

PDR

!

.. .

_ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ _ = _ _ _ _ _ _ _ _ _

_

. _ _ _ _ . _ _ _ _ - _ _ _ _ _ _

I

i

<

1

Portland General Electric Company -2-

i

i

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

i

Ross A. Scarano, Director 3

Division of Nuclear Material Safety I

Docket No.: 50-344

License No.: NPF-1

Enclosure:

NRC Inspection Report

50-344/98-02

]

'

cc w/ enclosure

H. Ray Pate, Manager Licensing

Compliance and Commitment Management i

Portland General Electric Company

'

- Trojan Nuclear Plant

71760 Columbia River Highway

Rainier, Oregon 97048

Chairman

Board of County Commissioners

Columbia County

St. Helens, Oregon 97501

Mr. David Stewart-Smith

Oregon Office of Energy

625 Marion Street NE

Salem, Oregon 97310

Mr. Lloyd K. Marbet

19142 S.E. Bakers Ferry Road

Boring, Oregon 97009

Mr. Jerry Wilson

Do it Yourscif Committee

l' 570 N.E. 53rd

} Hillsboro, Oregon 97124

Mr. Eugene Roselie

Northwest Environment Advocates

!' - 133 S.W. 2nd Avenue

! Portland, Oregon 97204

b__________________---_-___--_---_

_ _ _ _ _ _ _ _ _ _

t~

,

Portland General Electric Company '- 3-

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01 -I )

bec distrib. by RIV:

EWMerschoff, RA -

)

MTMasnik, NRR/PDND (11B20) '

LHThonas NRR/PDflD(11B20)

GHMarcus, NRR/DRPW/PDill-3 (11E2) ,

SHWeiss, NRR/PDND (11B20) i

DWeiss, OC/LFDCB (4503)

RAScarano

LLHowell 1

MRShaffer

l

  • DBSpitzberg
  • JVEverett
  • NMSB2 File
  • MIS System
  • RIV Files-4th floor file room (Part 50 Docket)
  • W/lFS Form

l

l

)

l

I

I

!

1

!

!

l

l

.

' DOCUMENT NAME: G:\fedb.oljveltnpB02rp.wkg FINAL:R:\_TN\TNP802RP.JVE

To receive copy of document, indicate in box: "C" = Copy without enclosures "E*' = Copy with egosures "N" = No copy,

RIV:DNMS:NMSB2 C:NMSB2 DD:DNMS d[],, D.DNMS g

JVEverett:wsw 4V( DBSpitzberg 7) 65 LLHc : ell 7' RAScarino )

6/30/98 v 6ir /98 6f/98 6)O/98

'

L-

-. OFFICIAL RECORD COPY l

1

-

C004

l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._ - - - - - - - - - - - - -- __

j

__-_- _ _ _ _ _ _ - _.____ - _ - - - _ _ _ _ _ - - _ _ _ - _ _ _ _ _ - _ _ - - __ - _

..

9

Portland General Electric Company -3-

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01 -IE08)

bec distrib. by RIV:

EWMerschoff, RA

- MTMasnik, NRR/PDND (11820)

LHThonas, NRR/PDND (11B20)

GHMarcus, NRR/DRPW/PDlll-3 (11E2)

SHWeiss, NRR/PDND (11B20)

- DWeiss, CC/LFDCB (4503)

RAScarano

LLHowe!!

- MRShaf'er

  • DBSpitzberg
  • JVEverett
  • NMSB2 File
  • MIS System
  • RIV Files-4th floor file room (Part 50 Docket)
  • W/lFS Form

DOCUMEN T NAME: G:\fedb.oljveltnp802rp.wkg FINAL:R:\ TN\TNP802RP.JVE

' To poconve copy of document, Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy,

RIV:DNMS:NMSB2 C:NMSB2 DD:DNMS M[fm D:DNMS#

h JVEverett:wsw 1Y( DBSpitzberg V FM LLHowell 7" RAScadno

6/30/98 - :V Sir 198 - 6g/98 6)O/98

OFFICIAL RECORD COPY

.._____ ______ __-__- ___-_______ -