Forwards Insp Rept 50-344/90-29 on 900902-1006 & Notice of Violation
ML20062F924
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/08/1990
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cross J
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20062F927 List:
References
NUDOCS 9011280266
Download: ML20062F924 (3)


See also: IR 05000344/1990029

Text

_ _ . _ . .

_.

_ _ . _ _

_ _ _ _ _ _ _

_.

.

. _ . _

__

_

_ _ _ .

_

'

s

/'

p ueg

.

Io

UNITED STATES

'

g

[

g

NUCLEAR REGULATORY COMMISSION

t,

nj

REGION V

4

1450 MARIA LANE, SUITE 210

4

. . . . + ,e

WALNUT CREE K, CALIFORNI A M596

Nov-8iggo

Docket No. 50-344

Portland General Elactric Company

121 S.W. Salmon Street, TB-17

Portland, Oregon 97204

Attention:

Mr. J. E. Cross

Vice President, Nuclear

Gentlemen:

Subject:

NRCInspectionoftheTrojanNuclearPlant

This refers to the inspection. conducted by Mr. R. C. Barr, Mr. J. F. Melfi and-

Mr. B. J. Olson of this office on September 2, 1990 through October 6, 1990 of

activities authorized by NRC License No. NPF-1, and to the discussion of our

findings held by Mr. Barr and Mr. Melfi with Mr.' Robinson and other members of

'

your staff periodically during the inspection.

Areas examined during this insaection are. described in the enclosed inspection

report. Within these areas, tie inspection consisted of selective

,

examinations of procedures and representative records, interviews with

1

personnel and observations by the inspectors.

This inspection identified two Surveillance-Program weaknesses. .First, some

Trojan Surveillance procedures were found which did not always establish

appropriate acceptance criteria.

Second,' administrative controls do not

.

appear to provide a requirements that equipment conditional surveillances are

i

,

performed.

These deficiencies appear to have caused previous violations and

,

i

require your close attention to ensure these weaknesses tre resolved.

At the

October 15, 1990 exit, you committed, by November 1,1990, to evaluate a

long-term program for procedural upgrada of the technical content of

,'

L

surveillance procedures.

The Trojan Surveillance Program should be improved

in the near term so that PGE has full confidence that acceptance criteria are

)

accurate and that conditional surveillances are identified when required.

A

j

'

presentation by your staff on the Trojan Surveillanca Program improvements

'

should be planned for our next management meeting.

The one level V violation was issued to direct management attention to the

inservice testing (IST) program' commitments and requirements.

Although of

minor safety significance, some IST issues discussed in our report were

identified ir the 1985-1987 time frame and are still open.

Previous

correct.ive actions do not appear to have been fully effective. . Consequently,

we request that your response to our Notice of Violation also address how the

.IST related Design Change Packages and Requests for Evaluations are being

tracked and scheduled to ensure completion.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC regulations, as set

l

9011280266 901108

'

PDR

ADOCK 05000344

\\

-

'

Q

PDC

k

.

,_ _.

- _ .

-

- - - - - - _ - - -

.

.

.

,

i

\\

'

.

1

.,

.

,

.

i

,

-2-

NOV - 8 1990

I

i

forth in the Notice of Violation, enclosed as Appendix A to this letter.

..

Pursuant to the provisions of 10 CFR 2.201, you are required to respond as

indicated in the enclosed Notice of Violation.

In accordance with 10 CFR 2.790 (a), a copy of this letter and the enclosures will be placed in the NRC

Public Document Room.

i

The response directed by this letter are not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork

.

Reduction Act of 1980, PL 96-511.

'

Should you have any questions concerning this inspection, we will be glad to

discuss them with you,

incerely,

.

'

.

.

S.

. Richards, Chief

ReactorProjectsBranch

Enclost

Inspecn on Report No. 50-344/90-29

cc w/ enclosure:

W. R. Robinson, Plant General Manager

L. A. Girard, Vice President and General Counsel

D. Stewart-Smith, Administrator, Nuclear Safety & Energy Facilities Division,

000E

R. P. Zimmerman, Director, Division of Reactor Safety and Projects

K. E. Perkins. Deputy Director, Division of Reactor Safety and Projects

,

.

..

.

.

.

.

.

.

'

.

.

.

,

-

.

-3-

NOV - 8 1990

bec w/ copy of enclosure:

docket file

ProjectInspector

Resident Ins)ector

P. Narbut, SRI, Diablo Canyon

G. Cook

B. Faulkenberry

J. Martin

T. Foley, NRR

T. Alexion, NRR/PO41

M. McCoy, NRR/SRXB

bec w/o enclosure:

M. Smith

J. Zollicoffer

'

N. Western

07 k

kk

(f

REGION

d

RCBarr

JFMelfi

BJ01 son

PJMorrill

AJohn on

11/.5/90

11/3 /90

11/ /90

11/5/90

11/8 90

E

] E

] E

E

] --

!!Pl%hry

[g g

~

~

UEST

"'

w

TO PDR ]

XES / N0

]

.

.

..

. .

"9