See also: IR 05000344/1990029
Text
_ _ . _ . .
_.
_ _ . _ _
_ _ _ _ _ _ _
_.
.
. _ . _
__
_
_ _ _ .
_
'
s
/'
p ueg
.
Io
UNITED STATES
'
g
[
g
NUCLEAR REGULATORY COMMISSION
t,
nj
REGION V
4
1450 MARIA LANE, SUITE 210
4
. . . . + ,e
WALNUT CREE K, CALIFORNI A M596
Nov-8iggo
Docket No. 50-344
Portland General Elactric Company
121 S.W. Salmon Street, TB-17
Portland, Oregon 97204
Attention:
Mr. J. E. Cross
Vice President, Nuclear
Gentlemen:
Subject:
NRCInspectionoftheTrojanNuclearPlant
This refers to the inspection. conducted by Mr. R. C. Barr, Mr. J. F. Melfi and-
Mr. B. J. Olson of this office on September 2, 1990 through October 6, 1990 of
activities authorized by NRC License No. NPF-1, and to the discussion of our
findings held by Mr. Barr and Mr. Melfi with Mr.' Robinson and other members of
'
your staff periodically during the inspection.
Areas examined during this insaection are. described in the enclosed inspection
report. Within these areas, tie inspection consisted of selective
,
examinations of procedures and representative records, interviews with
1
personnel and observations by the inspectors.
This inspection identified two Surveillance-Program weaknesses. .First, some
Trojan Surveillance procedures were found which did not always establish
appropriate acceptance criteria.
Second,' administrative controls do not
.
appear to provide a requirements that equipment conditional surveillances are
i
,
performed.
These deficiencies appear to have caused previous violations and
,
i
require your close attention to ensure these weaknesses tre resolved.
At the
October 15, 1990 exit, you committed, by November 1,1990, to evaluate a
long-term program for procedural upgrada of the technical content of
,'
L
surveillance procedures.
The Trojan Surveillance Program should be improved
in the near term so that PGE has full confidence that acceptance criteria are
)
accurate and that conditional surveillances are identified when required.
A
j
'
presentation by your staff on the Trojan Surveillanca Program improvements
'
should be planned for our next management meeting.
The one level V violation was issued to direct management attention to the
inservice testing (IST) program' commitments and requirements.
Although of
minor safety significance, some IST issues discussed in our report were
identified ir the 1985-1987 time frame and are still open.
Previous
correct.ive actions do not appear to have been fully effective. . Consequently,
we request that your response to our Notice of Violation also address how the
.IST related Design Change Packages and Requests for Evaluations are being
tracked and scheduled to ensure completion.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC regulations, as set
l
9011280266 901108
'
ADOCK 05000344
\\
-
'
Q
k
.
,_ _.
- _ .
-
- - - - - - _ - - -
.
.
.
,
i
\\
'
.
1
.,
.
,
.
i
,
-2-
NOV - 8 1990
I
i
forth in the Notice of Violation, enclosed as Appendix A to this letter.
..
Pursuant to the provisions of 10 CFR 2.201, you are required to respond as
indicated in the enclosed Notice of Violation.
In accordance with 10 CFR 2.790 (a), a copy of this letter and the enclosures will be placed in the NRC
Public Document Room.
i
The response directed by this letter are not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork
.
Reduction Act of 1980, PL 96-511.
'
Should you have any questions concerning this inspection, we will be glad to
discuss them with you,
incerely,
.
'
.
.
S.
. Richards, Chief
ReactorProjectsBranch
Enclost
Inspecn on Report No. 50-344/90-29
cc w/ enclosure:
W. R. Robinson, Plant General Manager
L. A. Girard, Vice President and General Counsel
D. Stewart-Smith, Administrator, Nuclear Safety & Energy Facilities Division,
000E
R. P. Zimmerman, Director, Division of Reactor Safety and Projects
K. E. Perkins. Deputy Director, Division of Reactor Safety and Projects
,
.
..
.
.
.
.
.
.
'
.
.
.
,
-
.
-3-
NOV - 8 1990
bec w/ copy of enclosure:
docket file
ProjectInspector
Resident Ins)ector
P. Narbut, SRI, Diablo Canyon
G. Cook
B. Faulkenberry
J. Martin
T. Foley, NRR
T. Alexion, NRR/PO41
M. McCoy, NRR/SRXB
bec w/o enclosure:
M. Smith
J. Zollicoffer
'
N. Western
07 k
kk
(f
REGION
d
RCBarr
JFMelfi
BJ01 son
PJMorrill
AJohn on
11/.5/90
11/3 /90
11/ /90
11/5/90
11/8 90