ML20125B209: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:- -
                                                                                                  ,
d        p s:
                                                                                    Tzc
  [-            'o                            UNITED STATES
    8'            n                NUCLEAR REGULATORY COMMISSION                              ,  I
  vi 5          .r                              REGION lil                                        i
  i e            #
                                            799 ROOSEVELT ROAD                              d
                o                        GLEN ELLYN, ILLINOIS 60137
        .....
                                            $rP 1919M '
          Docket No. 50-373
          Commonwealth Edison Company
          ATTN:      Mr. Byron Lee, Jr.
                    Vice President                                                                !
          Post Office Box 767                                                                        ,
          Chicago, IL 60690                                                                        l
          Gentlemen:                                                                                i
          This refers to the inspection conducted by Mr. R. D. Walker of this
          office on August 1-31, 1979, of activities at La Salle County Nuclear
          Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to
          the discussion of our findings with Mr. R. H. Holyoak at the conclusion
          of the inspection.
          The enclosed copy of our inspection report identifies areas examined                      ;
          during the inspection. Within these areas, the inspection consisted of
          a selective examination of procedures and representative records, obser-
          vations, and interviews with personnel.
          No items of noncompliance with NRC requirements were identified during
          the course of this inspection.
          In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
          Title 10, Code of Federal Regulations, a copy of this letter and the
          enclosed inspection report will be placed in the NRC's Public Document
          Roo.n, except as follows. If this report contains information that you      or
          your contractors believe to be proprietary, you must apply in writing to
          this office, within twenty days of your receipt of this letter, to withhold
          such information from public disclosure. The application must include a
          full statement of the reasons for which the information is considered
          proprietary, and should be prepared so that proprietary information              '
          identified in the application is contained in an enclosure to the
          application.
                                                                            90019226
                                                                        6
                                                                                    o  et
                                                                            p
-                                                                                                i
 
.
*
                                                                ,
'
  Consnonwealth Edison Company      -2-
  We will gladly discuss any questions you have concerning this
  inspection.
                                    Sincerely,
                                      ~*C5E% W F-o f
                                    R. F. Heishman, Chief
                                    Reactor Operations and
                                        Nuclear Support Branch
  Enclosure: IE Inspection
    Report No. 50-373/79-33
  cc w/ enc 1:
  Mr. L. J. Burke, Site
    Project Superintendent
  Mr. T. E. Quaka, Quality
    Assurance Supervisor
  Mr. R. H. Holyoak, Station
    Superintendent
  Central Files
  Reproduction Unit NRC 20b
  PDR
  Local PDR                                                      I
  NSIC
  TIC
  Mr. Dean Hansell, Office of
    Assistant Attorney General                    90019227
                                                                  l
                                                                  i
                                        , - -          y
}}
}}

Latest revision as of 03:36, 24 July 2020

Forwards IE Insp Rept 50-373/79-33 on 790801-31.No Noncompliance Noted
ML20125B209
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 09/19/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML20125B211 List:
References
NUDOCS 7910250034
Download: ML20125B209 (2)


See also: IR 05000373/1979033

Text

- -

,

d p s:

Tzc

[- 'o UNITED STATES

8' n NUCLEAR REGULATORY COMMISSION , I

vi 5 .r REGION lil i

i e #

799 ROOSEVELT ROAD d

o GLEN ELLYN, ILLINOIS 60137

.....

$rP 1919M '

Docket No. 50-373

Commonwealth Edison Company

ATTN: Mr. Byron Lee, Jr.

Vice President  !

Post Office Box 767 ,

Chicago, IL 60690 l

Gentlemen: i

This refers to the inspection conducted by Mr. R. D. Walker of this

office on August 1-31, 1979, of activities at La Salle County Nuclear

Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to

the discussion of our findings with Mr. R. H. Holyoak at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined  ;

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Roo.n, except as follows. If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information '

identified in the application is contained in an enclosure to the

application.

90019226

6

o et

p

- i

.

,

'

Consnonwealth Edison Company -2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

~*C5E% W F-o f

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure: IE Inspection

Report No. 50-373/79-33

cc w/ enc 1:

Mr. L. J. Burke, Site

Project Superintendent

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR I

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General 90019227

l

i

, - - y