                                            'JUL 1   082
.
      Docket No. 50-373
'JUL 1
      Commonwealth Edison Company
082
      ATTN:   Mr. Cordell Reed
Docket No. 50-373
                Vice President
Commonwealth Edison Company
      Post Office Box 767
ATTN:
      Chicago, IL 60690
Mr. Cordell Reed
      Gentlemen:
Vice President
      This refers to the routine safety inspection conducted by Messrs.
Post Office Box 767
      W. G. Guldmond and R. D. Walker of this office on May 3-28, 1982, of
Chicago, IL 60690
      activities at LaSalle County Nuclear Station, Unit 1, authorized by NRC
Gentlemen:
      Operating License No. NPF-11 and to the discussion of our findings with
This refers to the routine safety inspection conducted by Messrs.
      R. H. Holyoak at the conclusion of the inspection.
W. G. Guldmond and R. D. Walker of this office on May 3-28, 1982, of
      The enclosed copy of our inspection report identifies areas examined during
activities at LaSalle County Nuclear Station, Unit 1, authorized by NRC
      the inspection. Within these areas, the inspection consisted of a selective
Operating License No. NPF-11 and to the discussion of our findings with
      examination of procedures and representative records, observations, and
R. H. Holyoak at the conclusion of the inspection.
      interviews with personnel.
The enclosed copy of our inspection report identifies areas examined during
      During this inspection, certain of your activities appeared to be in non-
the inspection. Within these areas, the inspection consisted of a selective
      compliance with NRC requirements, as specified in the enclosed Appendix.
examination of procedures and representative records, observations, and
      A written response is required.
interviews with personnel.
      In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
During this inspection, certain of your activities appeared to be in non-
      of this letter and the enclosed inspection report will be placed in the
compliance with NRC requirements, as specified in the enclosed Appendix.
      NRC's Public Document Room. If this report contains any information
A written response is required.
      that you (or your contractors) believe to be exempt from disclosure under
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
        10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
of this letter and the enclosed inspection report will be placed in the
      phone within ten (10) days from the date of this letter of your intention
NRC's Public Document Room.
      to file a request for withholding; and (b) submit within twenty-five (25)
If this report contains any information
      days from the date of this letter a written application to this office
that you (or your contractors) believe to be exempt from disclosure under
      to withhold such information.   If your receipt of this letter has been
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
      delayed such that less than seven (7) days are available for your review,
phone within ten (10) days from the date of this letter of your intention
      please notify this office promptly so that a new due date may be estab-
to file a request for withholding; and (b) submit within twenty-five (25)
      lished. Consistent with Section 2.790(b)(1), any such application must
days from the date of this letter a written application to this office
      be accompanied by an affidavit executed by the owner of the information
to withhold such information.
      which identifies the document or part sought to be withheld, and which
If your receipt of this letter has been
      contains a full statement of the reasons which are the bases for the
delayed such that less than seven (7) days are available for your review,
      claim that the information should be withheld from public disclosure.
please notify this office promptly so that a new due date may be estab-
      This section further requires the statement to address with specificity
lished. Consistent with Section 2.790(b)(1), any such application must
      the considerations listed in 10 CFR 2.790(b)(4). The information sought
be accompanied by an affidavit executed by the owner of the information
  8207190072 820701
which identifies the document or part sought to be withheld, and which
  gDRADOCK05000                                                                   d/
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
8207190072 820701
gDRADOCK05000
d/


                          .-.                                             -   -                                                       . . -                                         ..
.-.
  ;               .
-
            -
-
                                                                  ,
. . -
      .           .
..
                                        .
;
  4,
.
                        Commonwealth Edison Company                                             2                         Jp[ }     ggg
-
                          to be withheld shall be incorporated as far as possible into a separate
,
  i
.
  '
.
                        part of the affidavit.                               If we do not hear from you in this regard within
.
                          the specified periods noted above, a copy of this letter and the enclosed
4,
                          inspection report will be placed in the Public Document Room.
Commonwealth Edison Company
                        We will gladly discuss any questions you haveLconcerning this inspection.
2
  ,
Jp[ }
                                                                                                  Sincerely,
ggg
  ,
to be withheld shall be incorporated as far as possible into a separate
                                                                                                        "
i
)                             ,
part of the affidavit.
                                                                                                61* t' : :''                     .      $*                                 ' t u ^ ),
If we do not hear from you in this regard within
  '
'
                                                                                                  R. L. Spessard,' Director
the specified periods noted above, a copy of this letter and the enclosed
                                                                                                  Division of Project and
inspection report will be placed in the Public Document Room.
                                                                                                    Resident Programs
We will gladly discuss any questions you haveLconcerning this inspection.
                        Enclosure:
,
                          1. Appendix,
Sincerely,
                                    Notice of Violation
,
                        2.      Inspection Report
)
                                    No. 50-373/82-28(DPRP)
61* t' : :''
                        cc w/ enc 1:
$*
                          Louis 0. De1 George, Director
' t u ^ ),
                              of Nuclear Licensing
"
                        R. Cosaro, Site Construction
,
                              Superintendent
.
                        T. E. Quaka, Quality
R. L. Spessard,' Director
                              Assurance Supervisor
                        R. H. Holyoak, Station
                              Superintendent
                        B. B. Stephenson, Project Manager
'
'
                        DMB/ Document Control Desk (RIDS)
Division of Project and
                        Resident Inspector, RIII
Resident Programs
                        Karen Borgstadt, Office of
Enclosure:
                              Assistant Attorney General
1.
Appendix,
Notice of Violation
2.
Inspection Report
No. 50-373/82-28(DPRP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
'
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
!
!
!
!
!
!
!
                                                                                                                                                                                          !
!
!
i
i
                        RIII                                       RIII           RIII                     RII
RIII
RIII
RIII
RII
@, $ W.
$:2AfM
Nb
f
,
,
;
;
                            @, $ W.
Walker /dm
                        Walker /dm
Guldmond
                                                                    $:2AfM f
Knop
                                                                    Guldmond
Spe sard
                                                                                      Nb
l
                                                                                    Knop                      Spe sard
6/18/82
l                       6/18/82
l
l
t
t
      _ . . - . .   , _ . .               - _ _ . - - . . , . _ _ _                     . _ . .         ._.,       -~_ __         .     _ _ _ _ - _ _ _ . - - _ . , _ . -
_ . . - . .
, _ . .
- _ _ . - - . . , . _ _ _
. _ . .
._.,
-~_ __
.
_ _ _ _ - _ _ _ . - - _ . , _ . -
}}
}}

Latest revision as of 16:18, 17 December 2024

Forwards IE Insp Rept 50-373/82-28 on 820503-28 & Notice of Violation
ML20055A491
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 07/01/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20055A492 List:
References
NUDOCS 8207190072
Download: ML20055A491 (2)


See also: IR 05000373/1982028

Text

..

d

.

.

.

'JUL 1

082

Docket No. 50-373

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

W. G. Guldmond and R. D. Walker of this office on May 3-28, 1982, of

activities at LaSalle County Nuclear Station, Unit 1, authorized by NRC

Operating License No. NPF-11 and to the discussion of our findings with

R. H. Holyoak at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

8207190072 820701

gDRADOCK05000

d/

.-.

-

-

. . -

..

.

-

,

.

.

.

4,

Commonwealth Edison Company

2

Jp[ }

ggg

to be withheld shall be incorporated as far as possible into a separate

i

part of the affidavit.

If we do not hear from you in this regard within

'

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you haveLconcerning this inspection.

,

Sincerely,

,

)

61* t' : :

$*

' t u ^ ),

"

,

.

R. L. Spessard,' Director

'

Division of Project and

Resident Programs

Enclosure:

1.

Appendix,

Notice of Violation

2.

Inspection Report

No. 50-373/82-28(DPRP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

R. Cosaro, Site Construction

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

'

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney General

!

!

!

!

!

i

RIII

RIII

RIII

RII

@, $ W.

$:2AfM

Nb

f

,

Walker /dm

Guldmond

Knop

Spe sard

l

6/18/82

l

t

_ . . - . .

, _ . .

- _ _ . - - . . , . _ _ _

. _ . .

._.,

-~_ __

.

_ _ _ _ - _ _ _ . - - _ . , _ . -