d
.
.
.
'JUL 1
082
Docket No. 50-373
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
W. G. Guldmond and R. D. Walker of this office on May 3-28, 1982, of
activities at LaSalle County Nuclear Station, Unit 1, authorized by NRC
Operating License No. NPF-11 and to the discussion of our findings with
R. H. Holyoak at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
8207190072 820701
gDRADOCK05000
d/
.-.
-
-
. . -
..
.
-
,
.
.
.
4,
Commonwealth Edison Company
2
Jp[ }
ggg
to be withheld shall be incorporated as far as possible into a separate
i
part of the affidavit.
If we do not hear from you in this regard within
'
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you haveLconcerning this inspection.
,
Sincerely,
,
)
61* t' : :
$*
' t u ^ ),
"
,
.
R. L. Spessard,' Director
'
Division of Project and
Resident Programs
Enclosure:
1.
Appendix,
2.
Inspection Report
No. 50-373/82-28(DPRP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
'
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
!
!
!
!
!
i
RIII
RIII
RIII
RII
@, $ W.
$:2AfM
Nb
f
,
Walker /dm
Guldmond
Knop
Spe sard
l
6/18/82
l
t
_ . . - . .
, _ . .
- _ _ . - - . . , . _ _ _
. _ . .
._.,
-~_ __
.
_ _ _ _ - _ _ _ . - - _ . , _ . -